Mineral Resources and Ore Reserves updates

Summary by AI BETAClose X

Rio Tinto has announced updates to its Mineral Resources and Ore Reserves as of December 31, 2025, impacting its 2025 annual reporting. Key changes include an increase in Proved and Probable Ore Reserves by 80 Mt at the Oyu Tolgoi open pit in Mongolia, alongside a decrease in Mineral Resources by 60 Mt due to conversion and increased drilling density. At Kennecott Bingham Canyon in Utah, USA, the open pit deposit saw a significant conversion of Mineral Resources to Ore Reserves, resulting in a 56 Mt decrease in reported Mineral Resources, while the underground deposit experienced a 32 Mt increase in Mineral Resources and a 4.0 Mt increase in Ore Reserves. Additionally, the Amrun deposit in Queensland, Australia, reported a net increase of 123 Mt in Ore Reserves, and the Boron deposit saw a 9.3 Mt increase in Mineral Resources.

Disclaimer*

Rio Tinto PLC
19 February 2026
 

 

 

 


Notice to ASX/LSE                                                                                                                       

Mineral Resources and Ore Reserves updates

19 February 2026

Rio Tinto has today announced to the Australian Securities Exchange (ASX) changes in Mineral Resources and Ore Reserves to support its 2025 annual reporting[1], including: 

·      Increased Proved and Probable Ore Reserves and decreased Mineral Resources at the Rio Tinto Copper (RTC) Oyu Tolgoi Oyut open pit deposit in Mongolia.

·      A significant conversion of Mineral Resources to Ore Reserves at the Rio Tinto Copper Kennecott Bingham Canyon open pit deposit in Utah, USA, resulting in a material reduction in reported Mineral Resources.

·      An increase in reported Mineral Resources and Ore Reserves at the Rio Tinto Copper Kennecott Bingham Canyon underground deposit in Utah, USA.

·      Increased Ore Reserves and improved confidence with an associated decrease in Mineral Resources at the Rio Tinto Aluminium (RTA) Pacific Operations Amrun deposit in Queensland, Australia.

·      Increased Mineral Resources and revised classification for the Ore Reserves at Rio Tinto Borates (RTB) Boron deposit.

Supporting information for the changes in Mineral Resources and Ore Reserves is set out in the Table 1 Release and its appendices. This release provides a summary of those changes. Mineral Resources and Ore Reserves are quoted in this release on a 100 percent basis. Mineral Resources are reported in addition to Ore Reserves. The figures used to calculate Mineral Resources and Ore Reserves are often more precise than the rounded numbers shown in the tables, hence small differences may result if the calculations are repeated using the tabulated figures.  

These changes will be included in Rio Tinto's 2025 Annual Report, to be released to the market on 19 February 2026 (London time), which will set out in full Rio Tinto's Mineral Resources and Ore Reserves position as at 31 December 2025, and Rio Tinto's interests.  

Rio Tinto Copper - Oyu Tolgoi

Mineral Resources and Ore Reserves for the Oyu Tolgoi deposits[2] are presented in Table A and Table B. Proved Ore Reserves have increased by 17 million tonnes (Mt) and Probable Ore Reserves have increased by 63 Mt, for an overall increase in Ore Reserves of 80 Mt (8%). Within the Oyut open pit Proven Ore Reserves have increased by 17 Mt (7%) and Probable Ore Reserves have increased by 61 Mt (17%), for an overall increase of 79 Mt (14%).

 

There is no material change to Mineral Resources at the Property level. Within the Oyut open pit Measured and Indicated Mineral Resources have increased by 65 Mt (60%), while Inferred Mineral Resources have decreased by 125 Mt (39%) for an overall decrease of 60 Mt (14%).

The material change in both Oyut open pit Ore Reserves and Mineral Resources is largely driven by the Oyut block model update and resulting conversion of Inferred Mineral Resources into Indicated Mineral Resources and subsequently Ore Reserves through increased drilling density and geological confidence, with mining production depletions being the other minor contributing factor.  There has been no material change to other modifying factors, including mine design, governmental, tenure, environmental, cultural heritage or community factors and the methodology for determining Mineral Resources remains unchanged. Note the material variance is solely at the Oyut open pit level, and at Property level there no material change to Mineral Resources or Ore Reserves.

Rio Tinto Copper - Kennecott Bingham Canyon open pit

Mineral Resources and Ore Reserves for the Kennecott Bingham Canyon open pit deposit[3] are presented in Table C and Table D. Measured and Indicated Mineral Resources tonnes have decreased by 63 Mt and Inferred Mineral Resources have increased by 7 Mt for an overall decrease of 56 Mt (74%) as a result of the conversion to Ore Reserves.

Rio Tinto Copper - Kennecott Bingham Canyon underground

Mineral Resources and Ore Reserves for the Kennecott Bingham Canyon underground deposit[4] are presented in Table E and Table F. These Mineral Resources have increased by 32 Mt (122%) and Ore Reserves have increased by 4.0 Mt (85%). These updated Mineral Resources and Ore Reserves reflect increased confidence in the Mineral Resources due to the completion of orebody knowledge drilling, a lower cut-off grade that considers current mining costs, and ongoing experience mining the orebody.

Rio Tinto Aluminium Pacific Operations - Amrun

Mineral Resources and Ore Reserves for the RTA Pacific Operations, including the Amrun deposit[5], are presented in Table G and Table H. The updated Ore Reserves at Amrun reflects a material increase in Ore Reserves, and a material change in Ore Reserve classification. Proved Ore Reserves have increased by 258 Mt (55%), while Probable Ore Reserves have decreased by 161 Mt (31%), for a net increase of 123 Mt (13%), offset by 25 Mt depletion, to a total of 1,076 Mt.  The increase in Ore Reserves has resulted from a routine review of economic assumptions over the life of the mine, and updated orebody knowledge. The change in Ore Reserves classification reflects a higher level of confidence in the modifying factors resulting from increased confidence in the underlying Mineral Resources due to updated orebody knowledge. There has been no material change to other modifying factors, including governmental, tenure, environmental, cultural heritage or community factors. Mineral Resources exclusive of Ore Reserves have decreased by 94 Mt (13%) at Amrun due to the conversion of Mineral Resources to Ore Reserves, updated orebody knowledge and increased resource confidence.

Rio Tinto Borates - Boron

Mineral Resources and Ore Reserves for the RTB Boron Operations[6] are presented in Table I and Table J.  Mineral Resources have increased by 9.3 Mt saleable boric oxide (B2O3), reflecting an increase in the level of studies to process mineralised stockpiles. This provides reasonable prospects for eventual economic extraction of the additional material.

Total Ore Reserves (combined Proved and Probable) remain consistent with 2024, with mining depletion of 0.5 Mt B2O3 the only change. However, there has been a change in the classification methodology whereby a higher level of geotechnical study is now required for Proved Ore Reserves. Applying this change has converted 1.7 Mt B2O3 of Ore Reserves previously classified as Proved Ore Reserves to Probable Ore Reserves. There is no change to level of geotechnical information supporting the Ore Reserves, nor are there changes to any other modifying factors, including governmental, tenure, environmental, cultural heritage or community factors. The result of this change is that Proved Ore Reserves have decreased by 2.2 Mt B2O3 and Probable Ore Reserves have increased by 1.7 Mt B2O3.

 

1 These Mineral Resources and Ore Reserves were reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 (JORC Code) and the ASX Listing Rules in a release to the ASX dated 19 February 2026 titled "Ore Reserve and Mineral Resource updates: supporting information and Table 1 checklists" (Table 1 Release). Rio Tinto confirms that it is not aware of any new information or data that materially affects the information included in the Table 1 Release, that all material assumptions and technical parameters underpinning the estimates in the Table 1 Release continue to apply and have not materially changed, and that the form and context in which the Competent Persons' findings are presented have not been materially modified. 

 

2 The Competent Person for the information in the Table 1 Release that relates to Oyu Tolgoi Mineral Resources is Ms Joanna Marshall MAusIMM.  The Competent Person for the information in the Table 1 Release that relates to Oyu Tolgoi Ore Reserves is Mr Nathan Robinson MAusIMM. 

 

3 The Competent Persons for the information in the Table 1 Release that relates to Kennecott Bingham Canyon open pit Mineral Resources is Mr Gerry Austin MAusIMM and Mr Pancho Rodriguez MAusIMM.  The Competent Person for the information in the Table 1 Release that relates to Kennecott Bingham Canyon open pit Ore Reserves is Mr Eric Hoffmann MAusIMM.

 

4 The Competent Person for the information in the Table 1 Release that relates to Kennecott Bingham Canyon underground Mineral Resources is Mr Ryan Hayes MAusIMM.  The Competent Person for the information in the Table 1 Release that relates to Kennecott Bingham Canyon underground Ore Reserves is Mr Charles McArthur MAusIMM.

5 The Competent Person for the information in the Table 1 Release that relates to RTA Pacific Operations Mineral Resources is Mr Angus C. McIntyre MAusIMM.  The Competent Person for the information in the Table 1 Release that relates to RTA Pacific Operations Ore Reserves is Mr William Saba MAusIMM.

6 The Competent Person for the information in the Table 1 Release that relates to RTB Boron Mineral Resources and Ore Reserves is Mr Brandon Griffiths who is a Registered Member of the Society for Mining, Metallurgy, and Exploration.

Table A          Rio Tinto Copper Oyu Tolgoi Mineral Resources as at 31 December 2025 


Likely
mining
method
1

Measured Mineral Resources

as at 31 December 2025

Indicated Mineral Resources

as at 31 December 2025

Total Measured and Indicated Mineral

Resources as at 31 December 2025



Tonnage

Grade

Tonnage

Grade

Tonnage

Grade

Copper


Mt

% Cu

g/t Au

g/t Ag

% Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

Oyu Tolgoi (Mongolia)2

















- Heruga ETG

U/G

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

- Heruga OT

U/G

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

- Hugo Dummett North3

U/G

53

1.91

0.50

4.28

-

375

1.39

0.35

-

-

428

1.45

0.37

3.37

-

- Hugo Dummett North Extension

U/G

-

-

-

-

-

83

1.63

0.55

4.21

-

83

1.62

0.55

4.21

-

- Hugo Dummett South

U/G

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

- Oyut Open Pit

O/P

23

0.41

0.28

1.01

-

150

0.32

0.26

1.07

-

173

0.33

0.27

1.06

-

- Oyut Underground

U/G

12

0.46

0.85

1.24

-

88

0.38

0.55

1.22

-

100

0.39

0.58

1.22

-

Total


87

1.32

0.49

3.02

-

696

1.06

0.38

2.63

-

784

1.09

0.39

2.67

-

 


Inferred Mineral Resources

as at 31 December 2025

Total Mineral Resources

as at 31 December 2025

Rio Tinto
interest

Total Mineral Resources

as at 31 December 2024



Tonnage

Grade

Tonnage

Grade

Tonnage

Grade

Copper

Mt

% Cu

g/t Au

g/t Ag

% Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

%

Mt

% Cu

g/t Au

g/t Ag

% Mo

Oyu Tolgoi (Mongolia)2






 

 

 

 

 







- Heruga ETG

1,502

0.41

0.40

1.44

0.012

1,502

0.41

0.40

1.44

0.012

56.0

1,502

0.41

0.40

1.44

0.012

- Heruga OT

107

0.42

0.30

1.58

0.011

107

0.42

0.30

1.58

0.011

66.0

107

0.42

0.30

1.58

0.011

- Hugo Dummett North3

716

0.83

0.29

2.47

-

1,143

1.06

0.32

2.81

-

66.0

1,145

1.06

0.32

2.80

-

- Hugo Dummett North Extension

161

1.04

0.37

2.84

-

244

1.24

0.43

3.31

-

56.0

244

1.24

0.43

3.31

-

- Hugo Dummett South

731

0.83

0.07

1.87

-

731

0.83

0.07

1.87

-

66.0

731

0.83

0.07

1.87

-

- Oyut Open Pit

197

0.28

0.19

1.16

-

370

0.30

0.23

1.11

-

66.0

430

0.30

0.21

1.04

-

- Oyut Underground

117

0.42

0.40

1.15

-

217

0.40

0.48

1.18

-

66.0

203

0.40

0.49

1.23

-

Total

3,530

0.60

0.29

1.78

0.005

4,314

0.69

0.31

1.94

0.004


4,362

0.69

0.31

1.93

0.004

 

1.   Likely mining method: O/P = open pit/surface.

2.   Copper Mineral Resources are stated on a dry in situ weight basis.

3.   The Hugo Dummett North Mineral Resources include approximately 1.3 million tonnes of stockpiled material at a grade of 0.35% copper, 0.11 g/t gold and 0.85 g/t silver. 

 

 

 

Table B          Rio Tinto Copper Oyu Tolgoi Ore Reserves as at 31 December 2025 


Type
of
mine1

Proved Ore Reserves

as at 31 December 2025

Probable Ore Reserves

as at 31 December 2025

Total Ore Reserves

as at 31 December 2025

 


Tonnage

Grade

Tonnage

Grade

Tonnage

Grade

Copper2


Mt

% Cu

g/t Au

g/t Ag

% Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

Oyu Tolgoi (Mongolia)












 

 

 

 

 

- Hugo Dummett North3

U/G

-

-

-

-

-

374

1.56

0.30

3.20

-

374

1.56

0.30

3.20

-

- Hugo Dummett North Extension

U/G

-

-

-

-

-

36

1.68

0.59

3.96

-

36

1.68

0.59

3.96

-

- Oyut Open Pit

O/P

241

0.54

0.39

-

-

409

0.38

0.26

1.10

-

650

0.44

0.31

1.15

-

- Oyut stockpiles

S/P

-

-

-

-

-

76

0.32

0.13

0.94

-

76

0.32

0.13

0.94

-

Total

 

241

0.54

0.39

-

-

895

0.92

0.28

2.08

-

1,136

0.84

0.30

1.90

-

 


Average mill recovery %

Rio Tinto interest

Rio Tinto share recoverable metal

Total Ore Reserves

as at 31 December 2024


Tonnage

Grade 

Copper2

Cu

Au

Ag

Mo

%

Mt Cu

Moz Au

Moz Ag

Mt Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

Oyu Tolgoi (Mongolia)






 

 

 

 






- Hugo Dummett North3

92

79

81

-

66.0

3.57

1.88

20.44

-

386

1.58

0.31

3.25

-

- Hugo Dummett North Extension

93

81

84

-

56.0

0.31

0.31

2.13

-

36

1.68

0.60

3.97

-

- Oyut Open Pit

76

67

55

-

66.0

1.43

2.84

8.69

-

571

0.46

0.32

1.22

-

- Oyut stockpiles

71

54

50

-

66.0

0.11

0.12

0.77

-

63

0.31

0.13

0.98

-

Total






5.42

5.14

32.04

-

1,056

0.90

0.31

2.04

-

 

1.     Type of Mine: O/P = open pit/surface, S/P = stockpile, U/G = underground. 

2.     Copper Ore Reserves are reported as dry mill feed tonnes.

3.     The Hugo Dummett North Ore Reserves include approximately 1.9 million tonnes of stockpiled material at a grade of 0.48% copper, 0.14 g/t gold and 1.18 g/t silver.

 

 

 



 

Table C          Rio Tinto Copper Kennecott Bingham Canyon open pit Mineral Resources as at 31 December 2025 


Likely
mining
method
(1)

Measured Mineral Resources

Indicated Mineral Resources

Total Measured and Indicated Mineral


as at 31 December 2025 

as at 31 December 2025

Resources as at 31 December 2025


Tonnage

Grade




Tonnage

Grade




Tonnage

Grade




Copper(2)


Mt

% Cu

g/t Au

g/t Ag

% Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

Kennecott (US)

















- Bingham Open Pit (3)

O/P

-

-

-

-

-

-

-

-

-

-

-

-

-

-

 


Inferred Mineral Resources

Total Mineral Resources

Rio Tinto
interest

Total Mineral Resources

 

as at 31 December 2025 

as at 31 December 2025

as at 31 December 2024


Tonnage

Grade




Tonnage

Grade

 




Tonnage

Grade


 


Copper(2)

Mt

% Cu

g/t Au

g/t Ag

% Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

%

Mt

% Cu

g/t Au

g/t Ag

% Mo

Kennecott (US)






 

 

 

 

 







- Bingham Open Pit (3)

0.13

0.30

2.91

0.008

20

0.13

0.30

2.91

0.008

100.0

76

0.37

0.18

2.65

0.017

 

1.     Likely mining method: O/P = open pit/surface.

2.     Copper Mineral Resources are stated on a dry in situ weight basis.

 

Table D          Rio Tinto Copper Kennecott Bingham Canyon open pit Ore Reserves as at 31 December 2025 


Type
of
mine
(1)

Proved Ore Reserves

as at 31 December 2025  

Probable Ore Reserves

as at 31 December 2025 

Total Ore Reserves

as at 31 December 2025 

Tonnage

Grade




Tonnage

Grade




Tonnage

Grade

 



Copper(2)

   

Mt

% Cu

g/t Au

g/t Ag

% Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

Kennecott (US)












 

 

 

 

 

- Bingham Open Pit(3)

O/P

442

0.38

0.18

1.98

0.034

288

0.34

0.19

1.93

0.025

730

0.36

0.18

1.96

0.030

 


Average mill recovery % 

Rio Tinto
interest

Rio Tinto share 

recoverable metal 

Total Ore Reserves

as at 31 December 2024

 

 




Tonnage

Grade


Copper(2)

Cu

Au

Ag

Mo

%

Mt Cu

Moz Au

Moz Ag

Mt Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

Kennecott (US)






 

 

 

 






- Bingham Open Pit(3)

88

68

71

65

100.0

2.35

2.90

32.68

0.14

777

0.36

0.18

1.97

3.34

 

1.     Type of Mine: O/P = open pit/surface. 

2.     Copper Ore Reserves are reported as dry mill feed tonnes.

3.     Bingham Canyon Open Pit Ore Reserve molybdenum grades interpolated from exploration drilling assays have been factored based on a long reconciliation history to blast hole and mill samples.



 

Table E          Rio Tinto Copper Kennecott Bingham Canyon underground Mineral Resources as at 31 December 2025 


Likely
mining
method
(1)

Measured Mineral Resources

Indicated Mineral Resources

Total Measured and Indicated Mineral


as at 31 December 2025


as at 31 December 2025


Resources as at 31 December 2025


Tonnage

Grade




Tonnage

Grade




Tonnage

Grade




Copper(2)


Mt

% Cu

g/t Au

g/t Ag

% Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

Kennecott (US) - Underground Skarns

















- Lower Commercial Skarn

U/G

0.9

1.49

0.62

9.70

0.027

7.2

1.51

0.62

9.53

0.021

8.1

1.51

0.62

9.55

0.022

- North Rim Skarn

U/G

-

-

-

-

-

25

2.06

0.96

12.89

0.008

25

2.06

0.96

12.89

0.008

Total Underground Skarns


1.49

0.62

0.027

32

1.94

0.88

12.14

0.011

33

1.93

0.88

12.08

0.011

 


Inferred Mineral Resources

Total Mineral Resources

Rio Tinto
interest

Total Mineral Resources

 

as at 31 December 2025



as at 31 December 2025

as at 31 December 2024


Tonnage

Grade




Tonnage

Grade

 



Tonnage

Grade 



Copper(2)

Mt

% Cu

g/t Au

g/t Ag

% Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

%

Mt

% Cu

g/t Au

g/t Ag

% Mo

Kennecott (US) - Underground Skarns






 

 

 

 

 







- Lower Commercial Skarn

4.5

1.33

0.99

9.15

0.020

13

1.45

0.75

9.41

0.021

100.0

7.5

1.89

0.85

11.26

0.015

- North Rim Skarn

2.15

0.82

13.27

0.009

45

2.10

0.90

13.05

0.008

100.0

18

2.92

1.11

15.77

0.007

Total Underground Skarns

2.00

0.85

12.51

0.044

58

1.96

0.87

12.26

0.011


26

2.62

1.04

14.47

0.009

 

1.     Likely mining method: U/G = underground.

2.     Copper Mineral Resources are stated on a dry in situ weight basis.

 

 

Table F          Rio Tinto Copper Kennecott Bingham Canyon underground Ore Reserves as at 31 December 2025 


Type
of
mine
(1)

Proved Ore Reserves

as at 31 December 2025  

Probable Ore Reserves

as at 31 December 2025 

Total Ore Reserves

as at 31 December 2025 

 

Tonnage

Grade




Tonnage

Grade




Tonnage

Grade

 



Copper(2)

   

Mt

% Cu

g/t Au

g/t Ag

% Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

Kennecott (US) - Underground Skarns












 

 

 

 

 

- Lower Commercial Skarn

U/G

0.8

1.68

0.59

9.83

0.042

1.2

1.46

0.47

7.23

0.040

2.0

1.54

0.52

8.25

0.040

- North Rim Skarn

U/G

-

-

-

-

-

6.6

2.25

1.29

15.59

0.007

6.6

2.25

1.29

15.59

0.007

Total Underground Skarns


0.8

1.68

0.59

9.83

0.042

7.8

2.13

1.16

14.28

0.012

8.6

2.08

1.11

13.86

0.014

 


Average mill recovery % 

Rio Tinto
interest

Rio Tinto share 

recoverable metal 

Total Ore Reserves

as at 31 December 2024

 

Tonnage

Grade



Copper(2)

Cu

Au

Ag

Mo

%

Mt Cu

Moz Au

Moz Ag

Mt Mo

Mt

% Cu

g/t Au

g/t Ag

% Mo

Kennecott (US) -    Underground Skarns






 

 

 

 






- Lower Commercial Skarn

90

71

76

71

100.0

0.03

0.02

0.40

0.000

1.7

1.89

0.71

10.01

0.044

- North Rim Skarn

93

69

64

45

100.0

0.14

0.19

2.13

0.001

3.0

2.39

1.77

16.66

0.010

Total Underground Skarns






0.17

0.21

2.54

0.001

4.7

2.21

1.39

14.30

0.022

 

1.     Type of Mine: U/G = underground. 

2.     Copper Ore Reserves are reported as dry mill feed tonnes.



 

Table G         Rio Tinto Aluminium Pacific Operations Mineral Resources as at 31 December 2025 


Likely
mining
method
(1)

Measured Mineral Resources

Indicated Mineral Resources

Total Measured and Indicated Mineral


as at 31 December 2025

as at 31 December 2025

Resources as at 31 December 2025


Tonnage

Grade


Tonnage

Grade


Tonnage

Grade


Bauxite


Mt

% Al2O3

% SiO2

Mt

% Al2O3

% SiO2

Mt

% Al2O3

% SiO2

Rio Tinto Aluminium (Australia)











- Amrun(2)

O/P

143

48.9

11.7

276

49.6

12.0

419

49.4

11.9

- East Weipa and Andoom(2)

O/P

32

48.0

9.0

-

-

-

32

48.0

9.0

- Gove(3)

O/P

9

47.6

8.8

0.1

49.0

7.6

9

47.6

8.8

- North of Weipa(3)

O/P

-

-

-

212

51.9

11.3

212

51.9

11.3

Total (Australia)


183

48.7

11.1

488

50.6

11.7

671

50.1

11.5

 


Inferred Mineral Resources

Total Mineral Resources

Rio Tinto
interest

Total Mineral Resources


as at 31 December 2025

as at 31 December 2025

as at 31 December 2024


Tonnage

Grade


Tonnage

Grade

 


Tonnage

Grade


Bauxite

Mt

% Al2O3

% SiO2

Mt

% Al2O3

% SiO2

%

Mt

% Al2O3

% SiO2

Rio Tinto Aluminium (Australia)


 

 

 





- Amrun(2)

234

51.4

12.4

653

50.1

12.1

100.0

747

50.1

12.0

- East Weipa and Andoom(2)

-

-

-

32

48.0

9.0

100.0

36

48.0

8.9

- Gove(3)

-

-

-

9

47.6

8.8

100.0

10

47.7

9.0

- North of Weipa(3)

1,179

51.8

11.3

1,391

51.9

11.4

100.0

1,451

51.9

11.4

Total (Australia)

1,412

51.7

11.5

2,083

51.2

11.5


2,244

51.3

11.6

 

1.   Likely mining method: O/P = open pit/surface.

2.   Bauxite Mineral Resources for Amrun and East Weipa and Andoom are stated as dry product tonnes and total alumina and silica grades.

3.   Bauxite Mineral Resources for Gove and North of Weipa are stated as dry crude tonnes and total alumina and silica grades.

 



 

Table H          Rio Tinto Aluminium Pacific Operations Ore Reserves as at 31 December 2025


Type
of
mine(1)

Proved Ore Reserves

Probable Ore Reserves

Total Ore Reserves

 

as at 31 December 2025

as at 31 December 2025

as at 31 December 2025


Tonnage

Grade


Tonnage

Grade


Tonnage

Grade

 

Bauxite(2)


Mt

% Al2O3

% SiO2

Mt

% Al2O3

% SiO2

Mt

% Al2O3

% SiO2

Rio Tinto Aluminium (Australia)(3)








 

 

 

- Amrun

O/P

724

54.1

9.0

351

54.5

9.4

1,076

54.2

9.1

- East Weipa and Andoom

O/P

44

50.3

8.4

1

49.5

9.9

45

50.3

8.4

- Gove

O/P

35

50.1

6.7

5

49.9

6.9

40

50.1

6.7

Total (Australia)


803

53.7

8.8

357

54.4

9.4

1,161

53.9

9.0

 


Rio Tinto interest

Rio Tinto share recoverable mineral

 

Total Ore Reserves as at 31 December 2024


 

Tonnage

Grade


Bauxite(2)

%

Mt

 

Mt

% Al2O3

% SiO2

Rio Tinto Aluminium (Australia)(3)







- Amrun

100.0

1,076


978

54.4

9.0

- East Weipa and Andoom

100.0

45


56

50.5

8.1

- Gove

100.0

40


48

50.0

6.4

Total (Australia)

100.0

1,161


1,083

54.0

8.8

 

1.     Type of Mine: O/P = open pit/surface. 

2.     Bauxite Ore Reserves are stated as recoverable Ore Reserves of marketable product after accounting for all mining and processing losses. Mill recoveries are therefore not shown.

3.     Australian bauxite Ore Reserves are stated as dry tonnes and total alumina and silica grade.

 

 



 

Table I           Rio Tinto Borates Boron Mineral Resources as at 31 December 2025 


Likely
mining
method
1

Measured Mineral Resources

Indicated Mineral Resources

Total Measured and Indicated Mineral


as at 31 December 2025

as at 31 December 2025

Resources as at 31 December 2025


Tonnage

Tonnage

Tonnage

Borates


Mt

Mt

Mt

Boron (US)2

O/P

2.4

1.1

3.5

 

 


Inferred Mineral Resources

Total Mineral Resources

Rio Tinto
interest

Total Mineral Resources


as at 31 December 2025

as at 31 December 2025

as at 31 December 2024


Tonnage

Tonnage


Tonnage

Borates

Mt

Mt

%

Mt

Boron (US)2

5.8

9.3

100.0

-

 

1.     Likely mining method: O/P = open pit/surface.

2.     Boron Mineral Resources are reported as dry mineable B2O3 tonnes incorporating a mining recovery, rather than marketable product as in Ore Reserves.

 

 

Table J          Rio Tinto Borates Boron Operations Ore Reserves as at 31 December 2025 


Type
of
mine
1

Proved Ore Reserves

Probable Ore Reserves

Total Ore Reserves

 

as at 31 December 2025

as at 31 December 2025

as at 31 December 2025


Tonnage

Tonnage

Tonnage

Borates


Mt

Mt

Mt

Boron (US)2

O/P

5.0

7.0

12.0

 

 


Rio Tinto interest

Rio Tinto share marketable product

 

Total Ore Reserves as at 31 December 2024


 

Tonnage

Borates

%

Mt

 

Mt

Boron (US)2

100.0

12.0


12.6

 

1.     Type of Mine: O/P = open pit/surface. 

2.     Ore Reserves of borates are expressed in terms of marketable product (B2O3) tonnes after all mining and processing losses. Mill recoveries are therefore not shown.

 


Contacts

Please direct all enquiries to media.enquiries@riotinto.com

 

 

Media Relations,

United Kingdom

 

Matthew Klar 

M +44 7796 630 637 

 

David Outhwaite

M +44 7787 597 493

 

 

 

Media Relations,

Australia

 

Matt Chambers

M +61 433 525 739

 

Alyesha Anderson
M +61 434 868 118

 

Rachel Pupazzoni

M +61 438 875 469

 

Bruce Tobin  

M +61 419 103 454

 

 

 

 

Media Relations,

Canada

 

Simon Letendre

M +1 514 796 4973

 

Malika Cherry

M +1 418 592 7293

 

Vanessa Damha

M +1 514 715 2152

 

 

Media Relations,

US & Latin America

 

Jesse Riseborough 

M +1 202 394 9480 

 

Investor Relations,

United Kingdom

 

Rachel Arellano
M
+44 7584 609 644

 

David Ovington

M +44 7920 010 978

 

Laura Brooks  

M +44 7826 942 797 

 

Weiwei Hu  

M +44 7825 907 230

 

 

 

Investor Relations,

Australia

 

Tom Gallop

M +61 439 353 948

 

Eddie Gan-Och 
M
+61 477 599 714

 

 

Rio Tinto plc

 

6 St James's Square

London SW1Y 4AD

United Kingdom

T +44 20 7781 2000

 

Registered in England

No. 719885

 

 

 

Rio Tinto Limited

 

Level 43, 120 Collins Street

Melbourne 3000

Australia

T +61 3 9283 3333

 

Registered in Australia

ABN 96 004 458 404


This announcement is authorised for release to the market by Andy Hodges, Rio Tinto's Group Company Secretary.

 

 

riotinto.com



 

 

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 

Companies

Rio Tinto (RIO)
UK 100

Latest directors dealings