Notice to ASX/LSE

Mineral Resources and Ore Reserves updates
19 February 2026
Rio Tinto has today announced to the Australian Securities Exchange (ASX) changes in Mineral Resources and Ore Reserves to support its 2025 annual reporting[1], including:
· Increased Proved and Probable Ore Reserves and decreased Mineral Resources at the Rio Tinto Copper (RTC) Oyu Tolgoi Oyut open pit deposit in Mongolia.
· A significant conversion of Mineral Resources to Ore Reserves at the Rio Tinto Copper Kennecott Bingham Canyon open pit deposit in Utah, USA, resulting in a material reduction in reported Mineral Resources.
· An increase in reported Mineral Resources and Ore Reserves at the Rio Tinto Copper Kennecott Bingham Canyon underground deposit in Utah, USA.
· Increased Ore Reserves and improved confidence with an associated decrease in Mineral Resources at the Rio Tinto Aluminium (RTA) Pacific Operations Amrun deposit in Queensland, Australia.
· Increased Mineral Resources and revised classification for the Ore Reserves at Rio Tinto Borates (RTB) Boron deposit.
Supporting information for the changes in Mineral Resources and Ore Reserves is set out in the Table 1 Release and its appendices. This release provides a summary of those changes. Mineral Resources and Ore Reserves are quoted in this release on a 100 percent basis. Mineral Resources are reported in addition to Ore Reserves. The figures used to calculate Mineral Resources and Ore Reserves are often more precise than the rounded numbers shown in the tables, hence small differences may result if the calculations are repeated using the tabulated figures.
These changes will be included in Rio Tinto's 2025 Annual Report, to be released to the market on 19 February 2026 (London time), which will set out in full Rio Tinto's Mineral Resources and Ore Reserves position as at 31 December 2025, and Rio Tinto's interests.
Rio Tinto Copper - Oyu Tolgoi
Mineral Resources and Ore Reserves for the Oyu Tolgoi deposits[2] are presented in Table A and Table B. Proved Ore Reserves have increased by 17 million tonnes (Mt) and Probable Ore Reserves have increased by 63 Mt, for an overall increase in Ore Reserves of 80 Mt (8%). Within the Oyut open pit Proven Ore Reserves have increased by 17 Mt (7%) and Probable Ore Reserves have increased by 61 Mt (17%), for an overall increase of 79 Mt (14%).
There is no material change to Mineral Resources at the Property level. Within the Oyut open pit Measured and Indicated Mineral Resources have increased by 65 Mt (60%), while Inferred Mineral Resources have decreased by 125 Mt (39%) for an overall decrease of 60 Mt (14%).
The material change in both Oyut open pit Ore Reserves and Mineral Resources is largely driven by the Oyut block model update and resulting conversion of Inferred Mineral Resources into Indicated Mineral Resources and subsequently Ore Reserves through increased drilling density and geological confidence, with mining production depletions being the other minor contributing factor. There has been no material change to other modifying factors, including mine design, governmental, tenure, environmental, cultural heritage or community factors and the methodology for determining Mineral Resources remains unchanged. Note the material variance is solely at the Oyut open pit level, and at Property level there no material change to Mineral Resources or Ore Reserves.
Rio Tinto Copper - Kennecott Bingham Canyon open pit
Mineral Resources and Ore Reserves for the Kennecott Bingham Canyon open pit deposit[3] are presented in Table C and Table D. Measured and Indicated Mineral Resources tonnes have decreased by 63 Mt and Inferred Mineral Resources have increased by 7 Mt for an overall decrease of 56 Mt (74%) as a result of the conversion to Ore Reserves.
Rio Tinto Copper - Kennecott Bingham Canyon underground
Mineral Resources and Ore Reserves for the Kennecott Bingham Canyon underground deposit[4] are presented in Table E and Table F. These Mineral Resources have increased by 32 Mt (122%) and Ore Reserves have increased by 4.0 Mt (85%). These updated Mineral Resources and Ore Reserves reflect increased confidence in the Mineral Resources due to the completion of orebody knowledge drilling, a lower cut-off grade that considers current mining costs, and ongoing experience mining the orebody.
Rio Tinto Aluminium Pacific Operations - Amrun
Mineral Resources and Ore Reserves for the RTA Pacific Operations, including the Amrun deposit[5], are presented in Table G and Table H. The updated Ore Reserves at Amrun reflects a material increase in Ore Reserves, and a material change in Ore Reserve classification. Proved Ore Reserves have increased by 258 Mt (55%), while Probable Ore Reserves have decreased by 161 Mt (31%), for a net increase of 123 Mt (13%), offset by 25 Mt depletion, to a total of 1,076 Mt. The increase in Ore Reserves has resulted from a routine review of economic assumptions over the life of the mine, and updated orebody knowledge. The change in Ore Reserves classification reflects a higher level of confidence in the modifying factors resulting from increased confidence in the underlying Mineral Resources due to updated orebody knowledge. There has been no material change to other modifying factors, including governmental, tenure, environmental, cultural heritage or community factors. Mineral Resources exclusive of Ore Reserves have decreased by 94 Mt (13%) at Amrun due to the conversion of Mineral Resources to Ore Reserves, updated orebody knowledge and increased resource confidence.
Rio Tinto Borates - Boron
Mineral Resources and Ore Reserves for the RTB Boron Operations[6] are presented in Table I and Table J. Mineral Resources have increased by 9.3 Mt saleable boric oxide (B2O3), reflecting an increase in the level of studies to process mineralised stockpiles. This provides reasonable prospects for eventual economic extraction of the additional material.
Total Ore Reserves (combined Proved and Probable) remain consistent with 2024, with mining depletion of 0.5 Mt B2O3 the only change. However, there has been a change in the classification methodology whereby a higher level of geotechnical study is now required for Proved Ore Reserves. Applying this change has converted 1.7 Mt B2O3 of Ore Reserves previously classified as Proved Ore Reserves to Probable Ore Reserves. There is no change to level of geotechnical information supporting the Ore Reserves, nor are there changes to any other modifying factors, including governmental, tenure, environmental, cultural heritage or community factors. The result of this change is that Proved Ore Reserves have decreased by 2.2 Mt B2O3 and Probable Ore Reserves have increased by 1.7 Mt B2O3.
1 These Mineral Resources and Ore Reserves were reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 (JORC Code) and the ASX Listing Rules in a release to the ASX dated 19 February 2026 titled "Ore Reserve and Mineral Resource updates: supporting information and Table 1 checklists" (Table 1 Release). Rio Tinto confirms that it is not aware of any new information or data that materially affects the information included in the Table 1 Release, that all material assumptions and technical parameters underpinning the estimates in the Table 1 Release continue to apply and have not materially changed, and that the form and context in which the Competent Persons' findings are presented have not been materially modified.
2 The Competent Person for the information in the Table 1 Release that relates to Oyu Tolgoi Mineral Resources is Ms Joanna Marshall MAusIMM. The Competent Person for the information in the Table 1 Release that relates to Oyu Tolgoi Ore Reserves is Mr Nathan Robinson MAusIMM.
3 The Competent Persons for the information in the Table 1 Release that relates to Kennecott Bingham Canyon open pit Mineral Resources is Mr Gerry Austin MAusIMM and Mr Pancho Rodriguez MAusIMM. The Competent Person for the information in the Table 1 Release that relates to Kennecott Bingham Canyon open pit Ore Reserves is Mr Eric Hoffmann MAusIMM.
4 The Competent Person for the information in the Table 1 Release that relates to Kennecott Bingham Canyon underground Mineral Resources is Mr Ryan Hayes MAusIMM. The Competent Person for the information in the Table 1 Release that relates to Kennecott Bingham Canyon underground Ore Reserves is Mr Charles McArthur MAusIMM.
5 The Competent Person for the information in the Table 1 Release that relates to RTA Pacific Operations Mineral Resources is Mr Angus C. McIntyre MAusIMM. The Competent Person for the information in the Table 1 Release that relates to RTA Pacific Operations Ore Reserves is Mr William Saba MAusIMM.
6 The Competent Person for the information in the Table 1 Release that relates to RTB Boron Mineral Resources and Ore Reserves is Mr Brandon Griffiths who is a Registered Member of the Society for Mining, Metallurgy, and Exploration.
Table A Rio Tinto Copper Oyu Tolgoi Mineral Resources as at 31 December 2025
|
|
Likely |
Measured Mineral Resources as at 31 December 2025 |
Indicated Mineral Resources as at 31 December 2025 |
Total Measured and Indicated Mineral Resources as at 31 December 2025 |
|||||||||||||||
|
|
|||||||||||||||||||
|
|
Tonnage |
Grade |
Tonnage |
Grade |
Tonnage |
Grade |
|||||||||||||
|
Copper |
|
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
|||
|
Oyu Tolgoi (Mongolia)2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
- Heruga ETG |
U/G |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
|||
|
- Heruga OT |
U/G |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
|||
|
- Hugo Dummett North3 |
U/G |
53 |
1.91 |
0.50 |
4.28 |
- |
375 |
1.39 |
0.35 |
- |
- |
428 |
1.45 |
0.37 |
3.37 |
- |
|||
|
- Hugo Dummett North Extension |
U/G |
- |
- |
- |
- |
- |
83 |
1.63 |
0.55 |
4.21 |
- |
83 |
1.62 |
0.55 |
4.21 |
- |
|||
|
- Hugo Dummett South |
U/G |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
|||
|
- Oyut Open Pit |
O/P |
23 |
0.41 |
0.28 |
1.01 |
- |
150 |
0.32 |
0.26 |
1.07 |
- |
173 |
0.33 |
0.27 |
1.06 |
- |
|||
|
- Oyut Underground |
U/G |
12 |
0.46 |
0.85 |
1.24 |
- |
88 |
0.38 |
0.55 |
1.22 |
- |
100 |
0.39 |
0.58 |
1.22 |
- |
|||
|
Total |
|
87 |
1.32 |
0.49 |
3.02 |
- |
696 |
1.06 |
0.38 |
2.63 |
- |
784 |
1.09 |
0.39 |
2.67 |
- |
|||
|
|
Inferred Mineral Resources as at 31 December 2025 |
Total Mineral Resources as at 31 December 2025 |
Rio Tinto |
Total Mineral Resources as at 31 December 2024 |
||||||||||||||
|
|
||||||||||||||||||
|
|
Tonnage |
Grade |
Tonnage |
Grade |
Tonnage |
Grade |
||||||||||||
|
Copper |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
% |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
||
|
Oyu Tolgoi (Mongolia)2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
- Heruga ETG |
1,502 |
0.41 |
0.40 |
1.44 |
0.012 |
1,502 |
0.41 |
0.40 |
1.44 |
0.012 |
56.0 |
1,502 |
0.41 |
0.40 |
1.44 |
0.012 |
||
|
- Heruga OT |
107 |
0.42 |
0.30 |
1.58 |
0.011 |
107 |
0.42 |
0.30 |
1.58 |
0.011 |
66.0 |
107 |
0.42 |
0.30 |
1.58 |
0.011 |
||
|
- Hugo Dummett North3 |
716 |
0.83 |
0.29 |
2.47 |
- |
1,143 |
1.06 |
0.32 |
2.81 |
- |
66.0 |
1,145 |
1.06 |
0.32 |
2.80 |
- |
||
|
- Hugo Dummett North Extension |
161 |
1.04 |
0.37 |
2.84 |
- |
244 |
1.24 |
0.43 |
3.31 |
- |
56.0 |
244 |
1.24 |
0.43 |
3.31 |
- |
||
|
- Hugo Dummett South |
731 |
0.83 |
0.07 |
1.87 |
- |
731 |
0.83 |
0.07 |
1.87 |
- |
66.0 |
731 |
0.83 |
0.07 |
1.87 |
- |
||
|
- Oyut Open Pit |
197 |
0.28 |
0.19 |
1.16 |
- |
370 |
0.30 |
0.23 |
1.11 |
- |
66.0 |
430 |
0.30 |
0.21 |
1.04 |
- |
||
|
- Oyut Underground |
117 |
0.42 |
0.40 |
1.15 |
- |
217 |
0.40 |
0.48 |
1.18 |
- |
66.0 |
203 |
0.40 |
0.49 |
1.23 |
- |
||
|
Total |
3,530 |
0.60 |
0.29 |
1.78 |
0.005 |
4,314 |
0.69 |
0.31 |
1.94 |
0.004 |
|
4,362 |
0.69 |
0.31 |
1.93 |
0.004 |
||
1. Likely mining method: O/P = open pit/surface.
2. Copper Mineral Resources are stated on a dry in situ weight basis.
3. The Hugo Dummett North Mineral Resources include approximately 1.3 million tonnes of stockpiled material at a grade of 0.35% copper, 0.11 g/t gold and 0.85 g/t silver.
Table B Rio Tinto Copper Oyu Tolgoi Ore Reserves as at 31 December 2025
|
|
Type |
Proved Ore Reserves as at 31 December 2025 |
Probable Ore Reserves as at 31 December 2025 |
Total Ore Reserves as at 31 December 2025 |
||||||||||||
|
|
||||||||||||||||
|
|
Tonnage |
Grade |
Tonnage |
Grade |
Tonnage |
Grade |
||||||||||
|
Copper2 |
|
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
|
Oyu Tolgoi (Mongolia) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Hugo Dummett North3 |
U/G |
- |
- |
- |
- |
- |
374 |
1.56 |
0.30 |
3.20 |
- |
374 |
1.56 |
0.30 |
3.20 |
- |
|
- Hugo Dummett North Extension |
U/G |
- |
- |
- |
- |
- |
36 |
1.68 |
0.59 |
3.96 |
- |
36 |
1.68 |
0.59 |
3.96 |
- |
|
- Oyut Open Pit |
O/P |
241 |
0.54 |
0.39 |
- |
- |
409 |
0.38 |
0.26 |
1.10 |
- |
650 |
0.44 |
0.31 |
1.15 |
- |
|
- Oyut stockpiles |
S/P |
- |
- |
- |
- |
- |
76 |
0.32 |
0.13 |
0.94 |
- |
76 |
0.32 |
0.13 |
0.94 |
- |
|
Total |
|
241 |
0.54 |
0.39 |
- |
- |
895 |
0.92 |
0.28 |
2.08 |
- |
1,136 |
0.84 |
0.30 |
1.90 |
- |
|
|
Average mill recovery % |
Rio Tinto interest |
Rio Tinto share recoverable metal |
Total Ore Reserves as at 31 December 2024 |
||||||||||
|
|
Tonnage |
Grade |
||||||||||||
|
Copper2 |
Cu |
Au |
Ag |
Mo |
% |
Mt Cu |
Moz Au |
Moz Ag |
Mt Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
|
Oyu Tolgoi (Mongolia) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Hugo Dummett North3 |
92 |
79 |
81 |
- |
66.0 |
3.57 |
1.88 |
20.44 |
- |
386 |
1.58 |
0.31 |
3.25 |
- |
|
- Hugo Dummett North Extension |
93 |
81 |
84 |
- |
56.0 |
0.31 |
0.31 |
2.13 |
- |
36 |
1.68 |
0.60 |
3.97 |
- |
|
- Oyut Open Pit |
76 |
67 |
55 |
- |
66.0 |
1.43 |
2.84 |
8.69 |
- |
571 |
0.46 |
0.32 |
1.22 |
- |
|
- Oyut stockpiles |
71 |
54 |
50 |
- |
66.0 |
0.11 |
0.12 |
0.77 |
- |
63 |
0.31 |
0.13 |
0.98 |
- |
|
Total |
|
|
|
|
|
5.42 |
5.14 |
32.04 |
- |
1,056 |
0.90 |
0.31 |
2.04 |
- |
1. Type of Mine: O/P = open pit/surface, S/P = stockpile, U/G = underground.
2. Copper Ore Reserves are reported as dry mill feed tonnes.
3. The Hugo Dummett North Ore Reserves include approximately 1.9 million tonnes of stockpiled material at a grade of 0.48% copper, 0.14 g/t gold and 1.18 g/t silver.
Table C Rio Tinto Copper Kennecott Bingham Canyon open pit Mineral Resources as at 31 December 2025
|
|
Likely |
Measured Mineral Resources |
Indicated Mineral Resources |
Total Measured and Indicated Mineral |
||||||||||||
|
|
as at 31 December 2025 |
as at 31 December 2025 |
Resources as at 31 December 2025 |
|||||||||||||
|
|
Tonnage |
Grade |
|
|
|
Tonnage |
Grade |
|
|
|
Tonnage |
Grade |
|
|
|
|
|
Copper(2) |
|
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
|
Kennecott (US) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Bingham Open Pit (3) |
O/P |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
|
|
Inferred Mineral Resources |
Total Mineral Resources |
Rio Tinto |
Total Mineral Resources |
||||||||||||
|
|
as at 31 December 2025 |
as at 31 December 2025 |
as at 31 December 2024 |
|||||||||||||
|
|
Tonnage |
Grade |
|
|
|
Tonnage |
Grade |
|
|
|
|
Tonnage |
Grade |
|
|
|
|
Copper(2) |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
% |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
|
Kennecott (US) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Bingham Open Pit (3) |
20 |
0.13 |
0.30 |
2.91 |
0.008 |
20 |
0.13 |
0.30 |
2.91 |
0.008 |
100.0 |
76 |
0.37 |
0.18 |
2.65 |
0.017 |
1. Likely mining method: O/P = open pit/surface.
2. Copper Mineral Resources are stated on a dry in situ weight basis.
Table D Rio Tinto Copper Kennecott Bingham Canyon open pit Ore Reserves as at 31 December 2025
|
|
Type |
Proved Ore Reserves as at 31 December 2025 |
Probable Ore Reserves as at 31 December 2025 |
Total Ore Reserves as at 31 December 2025 |
||||||||||||
|
Tonnage |
Grade |
|
|
|
Tonnage |
Grade |
|
|
|
Tonnage |
Grade |
|
|
|
||
|
Copper(2) |
|
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
|
Kennecott (US) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Bingham Open Pit(3) |
O/P |
442 |
0.38 |
0.18 |
1.98 |
0.034 |
288 |
0.34 |
0.19 |
1.93 |
0.025 |
730 |
0.36 |
0.18 |
1.96 |
0.030 |
|
|
Average mill recovery % |
Rio Tinto |
Rio Tinto share recoverable metal |
Total Ore Reserves as at 31 December 2024 |
||||||||||
|
|
|
|
|
|
Tonnage |
Grade |
|
|||||||
|
Copper(2) |
Cu |
Au |
Ag |
Mo |
% |
Mt Cu |
Moz Au |
Moz Ag |
Mt Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
|
Kennecott (US) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Bingham Open Pit(3) |
88 |
68 |
71 |
65 |
100.0 |
2.35 |
2.90 |
32.68 |
0.14 |
777 |
0.36 |
0.18 |
1.97 |
3.34 |
1. Type of Mine: O/P = open pit/surface.
2. Copper Ore Reserves are reported as dry mill feed tonnes.
3. Bingham Canyon Open Pit Ore Reserve molybdenum grades interpolated from exploration drilling assays have been factored based on a long reconciliation history to blast hole and mill samples.
Table E Rio Tinto Copper Kennecott Bingham Canyon underground Mineral Resources as at 31 December 2025
|
|
Likely |
Measured Mineral Resources |
Indicated Mineral Resources |
Total Measured and Indicated Mineral |
||||||||||||
|
|
as at 31 December 2025 |
|
|
as at 31 December 2025 |
|
Resources as at 31 December 2025 |
||||||||||
|
|
Tonnage |
Grade |
|
|
|
Tonnage |
Grade |
|
|
|
Tonnage |
Grade |
|
|
|
|
|
Copper(2) |
|
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
|
Kennecott (US) - Underground Skarns |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Lower Commercial Skarn |
U/G |
0.9 |
1.49 |
0.62 |
9.70 |
0.027 |
7.2 |
1.51 |
0.62 |
9.53 |
0.021 |
8.1 |
1.51 |
0.62 |
9.55 |
0.022 |
|
- North Rim Skarn |
U/G |
- |
- |
- |
- |
- |
25 |
2.06 |
0.96 |
12.89 |
0.008 |
25 |
2.06 |
0.96 |
12.89 |
0.008 |
|
Total Underground Skarns |
|
0.9 |
1.49 |
0.62 |
9.70 |
0.027 |
32 |
1.94 |
0.88 |
12.14 |
0.011 |
33 |
1.93 |
0.88 |
12.08 |
0.011 |
|
|
Inferred Mineral Resources |
Total Mineral Resources |
Rio Tinto |
Total Mineral Resources |
||||||||||||
|
|
as at 31 December 2025 |
|
|
as at 31 December 2025 |
as at 31 December 2024 |
|||||||||||
|
|
Tonnage |
Grade |
|
|
|
Tonnage |
Grade |
|
|
|
Tonnage |
Grade |
|
|
||
|
Copper(2) |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
% |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
|
Kennecott (US) - Underground Skarns |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Lower Commercial Skarn |
4.5 |
1.33 |
0.99 |
9.15 |
0.020 |
13 |
1.45 |
0.75 |
9.41 |
0.021 |
100.0 |
7.5 |
1.89 |
0.85 |
11.26 |
0.015 |
|
- North Rim Skarn |
20 |
2.15 |
0.82 |
13.27 |
0.009 |
45 |
2.10 |
0.90 |
13.05 |
0.008 |
100.0 |
18 |
2.92 |
1.11 |
15.77 |
0.007 |
|
Total Underground Skarns |
24 |
2.00 |
0.85 |
12.51 |
0.044 |
58 |
1.96 |
0.87 |
12.26 |
0.011 |
|
26 |
2.62 |
1.04 |
14.47 |
0.009 |
1. Likely mining method: U/G = underground.
2. Copper Mineral Resources are stated on a dry in situ weight basis.
Table F Rio Tinto Copper Kennecott Bingham Canyon underground Ore Reserves as at 31 December 2025
|
|
Type |
Proved Ore Reserves as at 31 December 2025 |
Probable Ore Reserves as at 31 December 2025 |
Total Ore Reserves as at 31 December 2025 |
|||||||||||||
|
|
|||||||||||||||||
|
Tonnage |
Grade |
|
|
|
Tonnage |
Grade |
|
|
|
Tonnage |
Grade |
|
|
|
|||
|
Copper(2) |
|
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
|
|
Kennecott (US) - Underground Skarns |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Lower Commercial Skarn |
U/G |
0.8 |
1.68 |
0.59 |
9.83 |
0.042 |
1.2 |
1.46 |
0.47 |
7.23 |
0.040 |
2.0 |
1.54 |
0.52 |
8.25 |
0.040 |
|
|
- North Rim Skarn |
U/G |
- |
- |
- |
- |
- |
6.6 |
2.25 |
1.29 |
15.59 |
0.007 |
6.6 |
2.25 |
1.29 |
15.59 |
0.007 |
|
|
Total Underground Skarns |
|
0.8 |
1.68 |
0.59 |
9.83 |
0.042 |
7.8 |
2.13 |
1.16 |
14.28 |
0.012 |
8.6 |
2.08 |
1.11 |
13.86 |
0.014 |
|
|
|
Average mill recovery % |
Rio Tinto |
Rio Tinto share recoverable metal |
Total Ore Reserves as at 31 December 2024 |
||||||||||||
|
|
Tonnage |
Grade |
|
|
||||||||||||
|
Copper(2) |
Cu |
Au |
Ag |
Mo |
% |
Mt Cu |
Moz Au |
Moz Ag |
Mt Mo |
Mt |
% Cu |
g/t Au |
g/t Ag |
% Mo |
||
|
Kennecott (US) - Underground Skarns |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
- Lower Commercial Skarn |
90 |
71 |
76 |
71 |
100.0 |
0.03 |
0.02 |
0.40 |
0.000 |
1.7 |
1.89 |
0.71 |
10.01 |
0.044 |
||
|
- North Rim Skarn |
93 |
69 |
64 |
45 |
100.0 |
0.14 |
0.19 |
2.13 |
0.001 |
3.0 |
2.39 |
1.77 |
16.66 |
0.010 |
||
|
Total Underground Skarns |
|
|
|
|
|
0.17 |
0.21 |
2.54 |
0.001 |
4.7 |
2.21 |
1.39 |
14.30 |
0.022 |
||
1. Type of Mine: U/G = underground.
2. Copper Ore Reserves are reported as dry mill feed tonnes.
Table G Rio Tinto Aluminium Pacific Operations Mineral Resources as at 31 December 2025
|
|
Likely |
Measured Mineral Resources |
Indicated Mineral Resources |
Total Measured and Indicated Mineral |
||||||
|
|
as at 31 December 2025 |
as at 31 December 2025 |
Resources as at 31 December 2025 |
|||||||
|
|
Tonnage |
Grade |
|
Tonnage |
Grade |
|
Tonnage |
Grade |
|
|
|
Bauxite |
|
Mt |
% Al2O3 |
% SiO2 |
Mt |
% Al2O3 |
% SiO2 |
Mt |
% Al2O3 |
% SiO2 |
|
Rio Tinto Aluminium (Australia) |
|
|
|
|
|
|
|
|
|
|
|
- Amrun(2) |
O/P |
143 |
48.9 |
11.7 |
276 |
49.6 |
12.0 |
419 |
49.4 |
11.9 |
|
- East Weipa and Andoom(2) |
O/P |
32 |
48.0 |
9.0 |
- |
- |
- |
32 |
48.0 |
9.0 |
|
- Gove(3) |
O/P |
9 |
47.6 |
8.8 |
0.1 |
49.0 |
7.6 |
9 |
47.6 |
8.8 |
|
- North of Weipa(3) |
O/P |
- |
- |
- |
212 |
51.9 |
11.3 |
212 |
51.9 |
11.3 |
|
Total (Australia) |
|
183 |
48.7 |
11.1 |
488 |
50.6 |
11.7 |
671 |
50.1 |
11.5 |
|
|
Inferred Mineral Resources |
Total Mineral Resources |
Rio Tinto |
Total Mineral Resources |
||||||
|
|
as at 31 December 2025 |
as at 31 December 2025 |
as at 31 December 2024 |
|||||||
|
|
Tonnage |
Grade |
|
Tonnage |
Grade |
|
|
Tonnage |
Grade |
|
|
Bauxite |
Mt |
% Al2O3 |
% SiO2 |
Mt |
% Al2O3 |
% SiO2 |
% |
Mt |
% Al2O3 |
% SiO2 |
|
Rio Tinto Aluminium (Australia) |
|
|
|
|
|
|
|
|
|
|
|
- Amrun(2) |
234 |
51.4 |
12.4 |
653 |
50.1 |
12.1 |
100.0 |
747 |
50.1 |
12.0 |
|
- East Weipa and Andoom(2) |
- |
- |
- |
32 |
48.0 |
9.0 |
100.0 |
36 |
48.0 |
8.9 |
|
- Gove(3) |
- |
- |
- |
9 |
47.6 |
8.8 |
100.0 |
10 |
47.7 |
9.0 |
|
- North of Weipa(3) |
1,179 |
51.8 |
11.3 |
1,391 |
51.9 |
11.4 |
100.0 |
1,451 |
51.9 |
11.4 |
|
Total (Australia) |
1,412 |
51.7 |
11.5 |
2,083 |
51.2 |
11.5 |
|
2,244 |
51.3 |
11.6 |
1. Likely mining method: O/P = open pit/surface.
2. Bauxite Mineral Resources for Amrun and East Weipa and Andoom are stated as dry product tonnes and total alumina and silica grades.
3. Bauxite Mineral Resources for Gove and North of Weipa are stated as dry crude tonnes and total alumina and silica grades.
Table H Rio Tinto Aluminium Pacific Operations Ore Reserves as at 31 December 2025
|
|
Type |
Proved Ore Reserves |
Probable Ore Reserves |
Total Ore Reserves |
||||||
|
|
as at 31 December 2025 |
as at 31 December 2025 |
as at 31 December 2025 |
|||||||
|
|
Tonnage |
Grade |
|
Tonnage |
Grade |
|
Tonnage |
Grade |
|
|
|
Bauxite(2) |
|
Mt |
% Al2O3 |
% SiO2 |
Mt |
% Al2O3 |
% SiO2 |
Mt |
% Al2O3 |
% SiO2 |
|
Rio Tinto Aluminium (Australia)(3) |
|
|
|
|
|
|
|
|
|
|
|
- Amrun |
O/P |
724 |
54.1 |
9.0 |
351 |
54.5 |
9.4 |
1,076 |
54.2 |
9.1 |
|
- East Weipa and Andoom |
O/P |
44 |
50.3 |
8.4 |
1 |
49.5 |
9.9 |
45 |
50.3 |
8.4 |
|
- Gove |
O/P |
35 |
50.1 |
6.7 |
5 |
49.9 |
6.9 |
40 |
50.1 |
6.7 |
|
Total (Australia) |
|
803 |
53.7 |
8.8 |
357 |
54.4 |
9.4 |
1,161 |
53.9 |
9.0 |
|
|
Rio Tinto interest |
Rio Tinto share recoverable mineral |
|
Total Ore Reserves as at 31 December 2024 |
||
|
|
|
Tonnage |
Grade |
|
||
|
Bauxite(2) |
% |
Mt |
|
Mt |
% Al2O3 |
% SiO2 |
|
Rio Tinto Aluminium (Australia)(3) |
|
|
|
|
|
|
|
- Amrun |
100.0 |
1,076 |
|
978 |
54.4 |
9.0 |
|
- East Weipa and Andoom |
100.0 |
45 |
|
56 |
50.5 |
8.1 |
|
- Gove |
100.0 |
40 |
|
48 |
50.0 |
6.4 |
|
Total (Australia) |
100.0 |
1,161 |
|
1,083 |
54.0 |
8.8 |
1. Type of Mine: O/P = open pit/surface.
2. Bauxite Ore Reserves are stated as recoverable Ore Reserves of marketable product after accounting for all mining and processing losses. Mill recoveries are therefore not shown.
3. Australian bauxite Ore Reserves are stated as dry tonnes and total alumina and silica grade.
Table I Rio Tinto Borates Boron Mineral Resources as at 31 December 2025
|
|
Likely |
Measured Mineral Resources |
Indicated Mineral Resources |
Total Measured and Indicated Mineral |
|
|
as at 31 December 2025 |
as at 31 December 2025 |
Resources as at 31 December 2025 |
|
|
|
Tonnage |
Tonnage |
Tonnage |
|
|
Borates |
|
Mt |
Mt |
Mt |
|
Boron (US)2 |
O/P |
2.4 |
1.1 |
3.5 |
|
|
Inferred Mineral Resources |
Total Mineral Resources |
Rio Tinto |
Total Mineral Resources |
|
|
as at 31 December 2025 |
as at 31 December 2025 |
as at 31 December 2024 |
|
|
|
Tonnage |
Tonnage |
|
Tonnage |
|
Borates |
Mt |
Mt |
% |
Mt |
|
Boron (US)2 |
5.8 |
9.3 |
100.0 |
- |
1. Likely mining method: O/P = open pit/surface.
2. Boron Mineral Resources are reported as dry mineable B2O3 tonnes incorporating a mining recovery, rather than marketable product as in Ore Reserves.
Table J Rio Tinto Borates Boron Operations Ore Reserves as at 31 December 2025
|
|
Type |
Proved Ore Reserves |
Probable Ore Reserves |
Total Ore Reserves |
|
|
as at 31 December 2025 |
as at 31 December 2025 |
as at 31 December 2025 |
|
|
|
Tonnage |
Tonnage |
Tonnage |
|
|
Borates |
|
Mt |
Mt |
Mt |
|
Boron (US)2 |
O/P |
5.0 |
7.0 |
12.0 |
|
|
Rio Tinto interest |
Rio Tinto share marketable product |
|
Total Ore Reserves as at 31 December 2024 |
|
|
|
Tonnage |
||
|
Borates |
% |
Mt |
|
Mt |
|
Boron (US)2 |
100.0 |
12.0 |
|
12.6 |
1. Type of Mine: O/P = open pit/surface.
2. Ore Reserves of borates are expressed in terms of marketable product (B2O3) tonnes after all mining and processing losses. Mill recoveries are therefore not shown.
Please direct all enquiries to media.enquiries@riotinto.com
Media Relations,United Kingdom
Matthew Klar M +44 7796 630 637
David Outhwaite M +44 7787 597 493
|
Media Relations,Australia
Matt Chambers M +61 433 525 739
Alyesha Anderson
Rachel Pupazzoni M +61 438 875 469
Bruce Tobin M +61 419 103 454
|
Media Relations,Canada
Simon Letendre M +1 514 796 4973
Malika Cherry M +1 418 592 7293
Vanessa Damha M +1 514 715 2152
Media Relations,US & Latin America
Jesse Riseborough M +1 202 394 9480
|
Investor Relations,United Kingdom
Rachel Arellano
David Ovington M +44 7920 010 978
Laura Brooks M +44 7826 942 797
Weiwei Hu M +44 7825 907 230
|
Investor Relations,Australia
Tom Gallop M +61 439 353 948
Eddie Gan-Och |
|
Rio Tinto plc
6 St James's Square London SW1Y 4AD United Kingdom T +44 20 7781 2000
Registered in England No. 719885
|
Rio Tinto Limited
Level 43, 120 Collins Street Melbourne 3000 Australia T +61 3 9283 3333
Registered in Australia ABN 96 004 458 404 |
|
This announcement is authorised for release to the market by Andy Hodges, Rio Tinto's Group Company Secretary.