Drilling Underway at Wapouzé Limestone Project

Summary by AI BETAClose X

Oriole Resources PLC has commenced a maiden 1,000-metre drilling programme in 19 holes at its 85%-owned Wapouzé limestone project in Cameroon, targeting high-grade carbonate material suitable for the cement industry. The initial hole, WPDD001, intersected marble units to its 55-metre depth, with preliminary pXRF analysis indicating good quality material (>50% CaO with low magnesium and silica). The company anticipates that this programme, combined with a planned geophysics resistivity survey, will support the estimation of a maiden Mineral Resource Estimate or Exploration Target in the second half of 2026, and is continuing discussions with industrial partners for potential development.

Disclaimer*

UK 100

Latest directors dealings