Meridian Announces Filing of DFS Technical Report

Summary by AI BETAClose X

Meridian filed the NI 43-101 DFS Technical Report (effective 15 Sep 2026, dated 28 Oct 2026) for the Cabaçal project showing an after-tax NPV5 of USD 2.1 billion and a 108% IRR from pre-production capex of USD 322 million with capital payback in 0.9 years (assumes gold USD 3,570/oz, copper USD 5.03/lb, silver USD 50.17/oz). The DFS forecasts AISC of USD 1,056/oz AuEq, average annual production of 183,526 oz AuEq in years 1–5, a life-of-mine strip ratio of 1.4:1 and Proven & Probable reserves of 56.04 Mt at 0.61 g/t Au, 0.35% Cu and 1.33 g/t Ag (0.138 g/t AuEq cut-off).

Disclaimer*

UK 100

Latest directors dealings