Operations Update

Empyrean Energy PLC 08 June 2006 Empyrean Energy PLC ('Empyrean' or the 'Company'; Ticker: (EME)) Operations Update Well Production Test Status Eagle North-1 in California, USA AIM quoted Empyrean Energy Plc today announces the following update on the Eagle North-1, San Joaquin Basin, California, USA. Victoria Petroleum NL as operator for the Eagle North-1 horizontal well in the Eagle Oil Pool Development Project in the San Joaquin Basin advises that the securing of all necessary equipment for production testing operations at the Eagle North-1 horizontal well is continuing. In order to carry out the production testing operations in a cost effective and technically efficient manner, a completion rig and coiled tubing unit are required to work together at the site. A further update will be provided upon the securing of the equipment. The time while awaiting the availability of the coiled tubing unit and completion rig is being utilised to ensure optimum planning of the engineering program to carry out the forward production testing operations. The heavy demand for equipment and personnel in the Bakersfield production area has resulted in the delay experienced to date. Following the securing of the completion rig and the coiled tubing unit, this equipment will be moved onto the Eagle North-1 location and production testing operations will resume immediately. The information contained in this announcement has been reviewed by the Technical Director of Empyrean Energy Plc, Mr. Frank Brophy BSc ( Hons), who has over 40 years experience as a petroleum geologist. For further information Angus Prentice/Laurence Read Conduit PR Tel: +44 (0) 207 429 6603 Mob: +44 (0) 79974 982512 Imran Ahmad HB-Corporate Tel: +44(0) 207 510 8600 Empyrean Energy plc Tel : +44(0) 207 932 2442 This information is provided by RNS The company news service from the London Stock Exchange XGDLIGGGGLI
UK 100

Latest directors dealings