Drilling Update

Empyrean Energy PLC 16 February 2006 Empyrean Energy PLC ('Empyrean' or the 'Company'; Ticker: (EME)) Drilling update Eagle Oil Pool Development Project - California, USA AIM quoted Empyrean Energy PLC today announces the following update on the Eagle North-1 well in California, USA. Victoria Petroleum NL as operator for the Eagle North-1 well has advised that at 0900 hours on 16 February 2006, Perth, Australia Western Standard Time, Eagle North-1 had been drilled to its total depth of 4219 metres and preparations were being made to run electric wireline logs to evaluate the hydrocarbon shows encountered in the well while drilling. The operator anticipates that results of the wireline logs should be available in 12-18 hours time. The primary zone of interest for the wireline log evaluation is the target sand that was circulated up with an increase in gas to a peak of 42 units over a background of 8 units at 4,167 metres accompanied by an increase in heavier C5 gases decreasing to background at 4,175 metres. For further information Laurence Read/ Angus Prentice Conduit PR Tel: +44 (0) 207 429 6603 Mob: +44 (0) 7974 982 512 David Newton HB Corporate Tel: +44 (0) 207 510 8600 Chris Lambert Empyrean Energy plc Tel: +44 (0) 207 932 2442 This information is provided by RNS The company news service from the London Stock Exchange
UK 100

Latest directors dealings