Drilling Report

Cairn Energy PLC 21 March 2001 EMBARGOED UNTIL 1400 21 March 2001 CAIRN ENERGY PLC Update on Drilling Operations Offshore Eastern India Cairn announces that, due to operational difficulties encountered by the Energy Searcher drillship while running marine riser and associated equipment on the KG-A-1 well on Block KG-OS/6 offshore eastern India, there will be a delay of between one and two months in the drilling of the well. Remedial works will now be carried out on the drillship at the contractor's cost to allow the resumption of drilling operations. Cairn will have no liability for the costs of the drillship during the period of the delay. Notes to Editors:- 1. 'Cairn' where referred to in this release means Cairn Energy PLC and/or its subsidiaries, as appropriate. 2. Cairn holds a 50% equity interest in Block KG-OS/6 and is Operator for the Joint Venture. The remaining 50% is held by Videocon Petroleum Limited. Enquiries:- Cairn Energy PLC Bill Gammell, Chief Executive Tel: 0131 475 3000 Dr Mike Watts, Exploration Director Tel: 0131 475 3000 Kevin Hart, Finance Director Tel: 0131 475 3000 Brunswick Group Limited Victoria Sabin, Mark Antelme Tel: 0207 404 5959
UK 100

Latest directors dealings