Coral Bridge Subsea Cable Lands in EGY & JOD

Summary by AI BETAClose X

Telecom Egypt and NaiTel announced the completion of the Coral Bridge subsea cable, connecting Egypt and Jordan. This 15-kilometer cable, with 48 fiber pairs, can transport over 1 Petabit of data. The cable landed in Taba, Egypt, and Aqaba, Jordan, representing the first direct subsea link between the two countries in over 25 years. It's designed to reduce latency and data costs, supporting cloud computing and AI applications. The project leverages Telecom Egypt's existing subsea infrastructure to provide connectivity across Asia, Africa, and Europe.

Disclaimer*

UK 100

Latest directors dealings