Tirzzit Drill Campaign Update

AI SummaryClose X

Talisman Metals PLC has provided an update on its Tirzzit drill campaign, reporting that 187 meters have been drilled out of a planned 2,770 meters and that visible copper mineralization in the form of malachite has been intersected in RC drilled material. The company expects to send the first batch of samples for assay analysis within the next week, with results anticipated in four to six weeks. This early intersection of copper mineralization is considered a satisfying start to the campaign, with drilling pace set to accelerate.

Disclaimer*

UK 100

Latest directors dealings