Redmoor Critical Minerals Project Updates

Summary by AI BETAClose X

Strategic Minerals PLC announced updates on its Redmoor Critical Minerals Project, stating that three drill holes, CRD033, CRD034b, and CRD035, at Pad 1 have been completed, all intersecting the full thickness of the sheeted vein system. Geological logging indicates the presence of wolframite and chalcopyrite, consistent with previous mineralization. Drill hole CRD033 intersected the system from 428.00 m to 562.00 m downhole, while CRD034b intersected it from 438.50 m to 582.70 m. CRD035 intersected the system from 444.35 m to 487.40 m. A second drilling rig has been mobilized to the site. The company anticipates an updated Redmoor Mineral Resource Estimate in Q1 2026; the current MRE, reported in 2019, is 11.7 Mt at 1.17% tin equivalent.

Disclaimer*

UK 100

Latest directors dealings