Commencement of Drilling at Kabwe

Summary by AI BETAClose X

Shuka Minerals Plc has commenced Phase 1 drilling at the No.2 ore body of the Kabwe Zinc Mine, aiming to increase the existing resource by 50% based on the Behre Dolbear 2023 NI 43-101 report which indicates 3.1 million tonnes of ore at 11.4% zinc and 1.7% lead, plus silver and vanadium oxide. The initial 2,000-metre drilling program, overseen by the CEO and conducted by Ox Drilling Limited, will explore the ore body below current workings and investigate the potential of silver, vanadium, gallium, and germanium, commodities not previously a focus.

Disclaimer*

UK 100

Latest directors dealings