Database integrity
|
-
Measures taken to ensure that data has not been corrupted by, for example, transcription or keying errors, between its initial collection and its use for Mineral Resource estimation purposes.
-
Data validation procedures used.
|
-
Data integrity:
-
No information exists regarding the nature, quality, or appropriateness of the historical data validation by IGME (Rockfire 2022).
-
Rockfire checked historical raw drill hole collar and sample assay data in 2022. Where possible they checked and made minor corrections to collar coordinates, hole depths, hole orientation, assay data overlaps and assay duplicates.
-
The use of an Italian government laboratory (ITMI) based in Rome for the historical results was validated by the Rockfire’s re-sampling program which utilized Australian Laboratory Services (ALS).
-
New topography data was cross-checked against historical geological and topography mapping and found to match closely.
-
Drill hole data was supplied in computerised MS Excel spreadsheet form.
-
Historical collar location data was spot-checked against plotted plans matched closely.
-
Hole collars (where visible) were checked against new aerial photography and matched closely.
-
A representative number of historical and (all) new hole collar locations were found and confirmed during the 2024 site visit.
-
No independent reporting of historical assays was available to allow checking. However Rockfire’s re-sampling of core retained at HSGME correlated well and provided confidence about the accuracy of past assaying.
-
Data validation:
-
The Consultant databased all data into Minex geological software.
-
Topography data: New topography data was contoured and compared again historical topography contours and found to match closely.
-
Drill hole data: Gross software error data checking occurred with all drill holes during its databasing. This caught a very minor number of collar, survey, sample depth and assay value inconsistencies. All data issues were satisfactorily resolved and corrected by reference to logs and through common sense. Drill holes were plotted in plan and cross-section and compared well with plots in old reports.
|
|
Site visits
|
-
Comment on any site visits undertaken by the Competent Person and the outcome of those visits.
-
If no site visits have been undertaken indicate why this is the case.
|
-
Site visits:
-
The Consultant (CP for the Resource estimation and this Report) visited the site in late April 2024 in the company of Rockfire’s CEO and various Hellenic (Rockfire’s Greek subsidiary) personnel.
-
The visit formed a specific and comprehensive Due Diligence on the Project – all of which confirmed the Project’s setting, geology, mineralisation and exploration.
-
The visit confirmed all geographical and (limited) geological features and presumptions of the Project area necessary for the Resource estimation.
-
Geographically the Consultant gained impressions of the Project general location, its access from the sealed road running the length of the Project area, the mineral lease, and the valley topography bounded by hills. The Consultant traversed much of the southern part of the tenement on foot.
-
Geological impressions were gained of the steeply east-dipping basement volcanics and overlying limestones.
-
A number of surface gossanous mineralisation outcrops were visited.
-
The Consultant confirmed the precise location of a broad selection of historical drill hole collar locations and almost all recent drill hole collar locations.
|
|
Geological interpretation
|
-
Confidence in (or conversely, the uncertainty of ) the geological interpretation of the mineral deposit.
-
Nature of the data used and of any assumptions made.
-
The effect, if any, of alternative interpretations on Mineral Resource estimation.
-
The use of geology in guiding and controlling Mineral Resource estimation.
-
The factors affecting continuity both of grade and geology.
|
-
Geological layered mineralisation interpretation and correlation:
-
Historically Molaoi was geologically interpreted as a VMS type base metal deposit.
-
Molaoi’ s zinc mineralisation (with coincident lead, copper and silver) occurs in a sequence of thin sub-parallel layers striking ~N/S and dipping steeply eastward hosted within volcanic rocks overlain by limestones.
-
2024 interpretation (for 2024 zinc MRE):
-
Geological interpretation for the 2024 zinc MRE involved interpreting mineralised intercepts in ALL of the holes drilled to that date (see “Drill hole information’ above).
-
Those intercepts were chosen largely based on contiguous aggregates of samples with anomalous zinc grades (>0.15%). Intercept intervals (from and to depths down-hole) were sharp boundaries at the edge of whole sample intervals.
-
Intercepts were also interpreted with agreement with geological logs and with confirmation from pXRF readings taken over full hole lengths.
-
Invariably the other metal minerals assayed (lead, copper and silver), as well as Arsenic and Sulphur, exhibited almost contemporaneous grade anomalism.
-
Intercepts could contain lower grade internal waste where the full interval clearly represented the mineralised porting of a layer.
-
Once all intercepts were interpreted in all holes they were correlated from hole-to-hole into named layers – first on vertical E/W cross-sections and then graphically in 3D. This was a highly iterative process to best “line-up” intervals with similar characteristics and attitude.
-
2026 interpretation (for this 2026 germanium MRE):
-
Geological interpretation for this 2026 germanium MRE involved re-interpreting mineralised intercepts in ALL of the holes drilled to 2024 AND interpreting new mineralised intercepts in the new holes in 2025 and 2026. All 2026 intercepts are illustrated in Figure 4 below.
-
As before intercepts were based on the anomalous zinc (lead, copper and silver) anomalism in concert with agreement with geological logging and pXRF readings.
-
However that zinc-based interpretation is also fundamental to germanium mineralisation interpretation as anomalous germanium is observed at Molaoi to virtually always occur within anomalous zinc zones, usually in the same samples. Hence the Molaoi zinc mineralisation interpretation is also the germanium mineralisation interpretation.
-
Germanium at Molaoi has been assayed in all of Hellenic’s drill holes. It was NOT assayed in IGME’s historical drill holes.
-
Figure 4 illustrates Molaoi’s drill holes in 3D, viewed looking horizontally towards due north. Surface topography at the top is solid-shaded yellow. Drill hole traces are white. Layer intercepts interpreted in 2026 are shown as colour-coded thicker straws along the hole traces (see ‘layers’ below for the list of 25 layers). Those colours (e.g. the central green straws marking layer L3) are seen to be approximately sub-parallel and to dip down to the right (east) at ~50°. The grey coordinate grid lines are spaced 200 m apart E/W and 50 m apart vertically.
-

 Confidence in the geological interpretation:
-
The Consultant became highly confident in the VMS mineralised layer interpretation after the 2024 site inspection, data familiarization and 2024 layer interpretation.
-
This confidence was increased in 2026 after the incorporation of the new 2025 and 2026 drilling and re-interpretation/refinement of the layers. The new drilling largely confirmed previous layer interpretations and allow correction of some.
-
Data nature, assumptions & geological controls:
-
Interpretation was based on historical descriptions and interpretations; field outcrop inspections; and interpretation of assay data.
-
The basic assumptions and geological controls were:
-
High grade primary base metal mineralisation on flat sea floors typical of other VMS deposits – interspersed by barren sediments in the geological column.
-
Occurrence of narrow sharp (distinct contacts) high-grade drill hole intercepts correlated between holes into layers.
-
Alternative interpretations:
-
The data overwhelmingly supports the current layered geology and mineralisation style interpretation and the Consultant cannot envisage an alternative one.
-
If the current interpretation was not implemented a simple semi-layered 3D grade modelling method would produce a similar Resource but with much less sharp grade boundaries.
-
Use of geology and grade continuity:
-
The geological layered VMS model appreciated early in the Project history directed most drill hole orientation to be steeply west across strike and across dip of the perceived attitude of east-dipping layers.
-
Geological grade continuity was tightly controlled by obvious hole-to-hole correlation of mineralised intercepts in the drill holes.
-
Grade estimation was controlled within the plane of the mineralisation layering by the use of an un-folding block model – which forced continuity in the plane of the layers.
-
Grades in each layer were segregated with a unique data population domain number.
-
Block grade estimation also employed a strong vertical direction distance weighting factor (1.5) to minimise vertical continuity and emphasise continuity within the layer.
|
|
Dimensions
|
-
The extent and variability of the Mineral Resource expressed as length (along strike or otherwise), plan width, and depth below surface to the upper and lower limits of the Mineral Resource.
|
-
 Deposit dimensions:
-
Coordinates of the area encompassing the Lease:
-
Long polygon oriented NW/SE.
-
Lease ~7 km long NW/SE
-
 Lease ~1.5 km wide SW/NE
-
Lease area ~9.4 km2.
-
Resource model area:
-
Area in the SE of the tenement formed the area of all recent exploration:
-
 Layer model area (of all combined layers):
-
N/S strike ~2.2 km
-
E/W width ~900 m
-
Depth ~500 m
|
|
Estimation and modelling techniques
|
-
The nature and appropriateness of the estimation technique(s) applied and key assumptions, including treatment of extreme grade values, domaining, interpolation parameters and maximum distance of extrapolation from data points. If a computer assisted estimation method was chosen include a description of computer software and parameters used.
-
The availability of check estimates, previous estimates and/or mine production records and whether the Mineral Resource estimate takes appropriate account of such data.
-
The assumptions made regarding recovery of by-products.
-
Estimation of deleterious elements or other non-grade variables of economic significance (eg sulphur for acid mine drainage characterisation).
-
In the case of block model interpolation, the block size in relation to the average sample spacing and the search employed.
-
Any assumptions behind modelling of selective mining units.
-
Any assumptions about correlation between variables.
-
Description of how the geological interpretation was used to control the resource estimates.
-
Discussion of basis for using or not using grade cutting or capping.
-
The process of validation, the checking process used, the comparison of model data to drill hole data, and use of reconciliation data if available.
|
-
ESTIMATION TECHNIQUES
-
Software: Computer modelling and estimation was done with Minex Genesis software.
-
Estimation combined several techniques:
-
Mineralised layer structures – gridded DTM surfaces.
-
Grades – “un-folding” block modelling for grade interpolation and regular block modelling for reporting.
-
Mineralised layer structure surface modelling:
-
“Layer” deposit type:
-
Mineralisation was interpreted as a strongly “layered” VMS deposit consisting of multiple sub-parallel east-dipping layers.
-
Drill hole intercepts were interpreted for each layer.
-
In 2024 the deposit was interpreted with 23 individually named sub-parallel layers – of which 19 possessed sufficient data to model. Each layer was assigned a population domain number for assay segregation during grade estimation.
-
 In 2026 that list was amended into 28 layers (with the addition of 3 more layers at the base) – of which 25 possessed sufficient data to model. Several layers at the top were re-organised and re-assigned. The 2026 layers are listed with their domain numbers in the adjacent Table. Data for the 3 lowest layers (shaded light blue in the Table) was too scarce to allow surface modelling.
-
Estimation methods:
-
Geological structural layer modelling employed computerised gridded DTM surface interpolation.
-
Interpolated layers were built into an “un-folding” block model to guide block grade interpolation along layering.
-
Appropriateness of estimation methods:
-
Combination of surface interpolation followed by “un-folding” grade estimation along the layers was considered best suited to the deposit type.
-
The surface DTM method’s appropriateness stems from its 3D computational capability and rigor when applied to thin “layer” deposits where manual interpretation between relatively widely spaced drill hole data points cannot match interpolation in 3D.
-
Gridded surfaces based on the same parameters in plan-view (all mesh points are coincident in plan-view) allow simple mathematical operations within and between surfaces, including preventing over-laps.
-
“Un-folding” block model trending grade estimation as continuity in the plane of the layers considered to most closely achieve the strong observed grade trends within and along the layers.
-
Coordinates and grid mesh size:
-
 All DTM surfaces were interpolated over the same plan XY area to encompass all drill holes and to allow a perimeter around the edge. and with the same mesh size. Parameters given in adjacent Table.
-
The 10*10 m mesh size used was chosen to be ~20% of the average drill hole spacing (minimum ~50 m E/W, ~100-200 m N/S). Longer would have been too wide and not given a smooth surface. Much shorter would have implied more accuracy than was reflected by the drill holes.
-
Layer extents:
-
Layer surfaces were interpolated from all intercepts interpreted for the layer. Thus actual plan-view extent of layers would differ depending on the spread of interpreted intervals (somewhat influenced by the varying inclinations of the holes, depth of holes, and easting of holes).
-
Due to the distribution and depth of available drilling (and probably simply
 coincidentally) uppermost most eastern  layers were interpreted in the southern part of the project area; intermediate depth layers were interpreted in the central part of the project area (around the densest drilling); and lowest most western layers were interpreted in the northern part of the project area.
-
Figure 5 illustrates in 3D plan-view (looking vertically downwards) the varying lateral extents of a selection of modelled layer floor surfaces (see ‘modelling’ below). Grey solid-shaded topography is semi-transparent to allow the layer surface below to show through. Layer surfaces are colour-coded. Layers shown downwards are LM8 (brown, in the SE), LM2 (red), L3 (green, in the centre), L7 (yellow) and L12 (red, in the NW). Grey coordinate grid lines are at 200 m spacing.
-
Layer strike direction:
-
All layers were interpreted with a virtually N/S strike direction.
-
This N/S strike is illustrated in Figure 5 where the layers are particularly elongated N/S with their western (nearest surface) edges sub-parallel N/S.
-
Western strike swing in north:
-
Historically the IGME layer surface outcrop interpretations (effectively the strike) swung westward in the northern part of the project area north of Vigla.
-
However the CP saw no evidence of this swing in the interpreted mineralised intercepts. Shallow intercepts in the more western northern holes appear to correlate well with the deepest intercepts in deep holes in the centre of the project area. For this see the deepest and western intercepts in Figure 4 and in Figure 6. In Figure 6 the shallow western green (L13) and blue (L14) intercepts below the lowest layer are located in the NW of the project area whilst the deep ones in the centre of the Figure are located in the central part of the project area.
-
Layer dip:
-
All layer surfaces were effectively sub-parallel and dipped ~50° to the east.
-
This steep easterly dip is illustrated in an E/W section through floor surfaces in Figure 6 below.
-
Modelling could have used an inclined reference plane dipping parallel to the layers. However to avoid rotational complications during subsequent 3D block modelling, and because of the generally ‘well-behaved’ planar nature of the layers, all layers were modelled with respect to an (assumed) horizontal reference plane (at 0 RL).
-
Modelled surface outer boundary:
-
No limiting boundary polygons were used to curtail the lateral extent of surfaces.
-
Surfaces were interpolated to 80 m outside peripheral drill hole intercepts by layer.
-
This distance was less than the typical drill hole spacing (~50-100*100-200 m).
-
Although surfaces were modelled above topography in places those parts of layers were trimmed off during the block modelling and all Resources were reported below surface topography.
-
Layer roof/floor/thickness modelling process:
-
Initially layers were modelled individually. Upper roof (SR), lower floor (SF) and thickness (ST) gridded DTM surfaces were interpolated for each layer from down-hole layer intercepts in each layer.
-
To ensure no surface cross-overs this interpolation was done using a process of computing one layer surface (the floor was chosen), then computing the layer thickness, and then combining them arithmetically (through simple addition) to compute the other layer surface (the roof).
-
The floor was interpolated first as it possibly appeared smoother than the roof and therefore more reliably interpolated. Floor surfaces were interpolated from layer lower drill hole intercept depths.
-
Thicknesses were interpolated from the down-hole lengths of layer intercepts.
-
Roof surfaces were computed by addition of thicknesses to floor surfaces.
-
Finally the individual layer models were ‘built’ into a coherent stratigraphic sequence of surfaces. This process removed potential overlaps between layers.
-
Floor interpolation algorithm:
-
 Floor surface modelling used a trending growth algorithm to interpolate smooth natural surfaces (as opposed to straight line methods). Through extrapolation this method honours local inflections away from the reference plane mean orientation. Mesh point interpolations grow out from data points until all mesh points are estimated. Parameters are given in the adjacent Table.
-
A long default scan distance of 1,000 m was used to produce a smooth regional surface for the method.
-
An expansion distance of 80 m was set to define the surface perimeter outside the edge holes. This was ~50% greater than the ~50 m E/W hole spacing.
-

 Figure 6 illustrates Molaoi’s drill holes in 3D, viewed looking horizontally towards due north. Surface topography at the top is solid-shaded yellow. Drill hole traces are white, down-hole layer intercepts are thicker colour-coded straws. Several typical (significant ones from a Resource perspective) layer floor surface models are shown solid-coloured in the same colour as their drill hole intercepts. Layers shown going downwards are LM2 (red), L3 (green) and L7 (yellow). As the view is directly along strike the layers appear thin and particularly planar. No attempt was made at this point to trim the surfaces off above topography. The grey coordinate grid lines are spaced 200 m apart E/W and 50 m apart vertically.
-
Thickness interpolation algorithm:
-
Thickness surface modelling used an inverse distance squared algorithm (ID2). This conservative method was to ensure interpolated values were all within data limits (preventing lower or higher extrapolation between holes). Parameters are given in the adjacent Table.
-
A long scan distance of 500 m was used to avoid holes in surfaces caused where distances were great between drill holes.
-
A maximum of 3 data points were allowed per search sector – potentially giving 24 data points from the 8 sectors. A search sector is 45° wide.
-
 An expansion distance of 80 m was set to define the surface perimeter outside the edge holes. This was the same as for the floor surfaces to ensure approxmately the same areas were interpolated.
-
Output interpolated values were lower limited to zero but not upper limited.
-
 Output models were not smoothed.
-
Layer thickness statistics are given in the adjacent Table.
-
Surface MODEL naming:
-
File for built surfaces: ..V42_MODEL_20261110.GRD.
-
Bounding surfaces: Layer name + suffix SR and SF.
-
Thickness surfaces: Layer name + suffix ST.
-
Stratigraphic model build:
-
After independent interpolation of each layer’s roof, floor and thickness the suite of surfaces was ‘built’ into a valid model using processes to correct potential cross-overs between and within layers.
-
For Molaoi the build process used a ‘stack’ option to prevent any layer volume loss.
-
 Final stratigraphic cross-section: Figure 7 illustrates a typical final stratigraphic sequence of layer models – across the middle of the project area on vertical E/W cross-section 4077600N.
-
 Data population domains:
-
Samples and blocks (see below) in layers were uniquely identified and segregated by domain number for assay analysis and block grade estimation.
-
Domains were set in the drill hole database and in the block models.
-
Domain numbers are given above in the layer list (Table above).
-
Drill hole sample analysis:
-
Brief statistical analysis was performed for zinc (the principal base metal) in the layers with most intercepts. Analysis clearly showed the mineralised intercepts to be sharply anomalous against waste between layers.
-
 Grade continuity control ‘un-folding’ block model:
-
 An ‘un-folding’ 3D block model (MOL42_D/Z.GR3) was built within the geological layer surface models to provide domain control within layers and to control grade trending continuity within and along the layers (the ‘Z’ direction in a Minex ‘Z-grid’ block model). Parameters given in adjacent Table.
-
Extent: The un-folding block model could be given a tighter plan extent (1,100*2,200 m) than the default potential extent used for interpolating the layers. The maximum vertical extent (525 m) was set to cover all 25 layers modelled.
-
Rotation: As all layers were essentially sub-parallel in a ~50°E dipping plane the Z-grid required no rotation.
-
Plan block size: XY block size was set at 10*40 m to be roughly 25% (1/4) of the minimum drill hole spacing (~50*100/200 m). Some wider hole spacing was 100*200 m.
-
Vertical Z block size and number:
-
The number of blocks in the Z direction (150) was set according to layer average vertical thicknesses in combination with software block definition limits.
-
At Molaoi in 2026 the aim of apportioning block numbers within layers was to achieve an average Z block size of all blocks in each layer of 0.8 m. This was considered a reasonable size given the trypical sample length of ~1 m. The 0.8 m was greater than the 0.5 m used in 2024 but was necessary given the greater number of layers.
-
Average layer thicknesses and numbers of blocks assigned are given in adjacent Table.
-
Grade block estimation:
-
3D block grades were estimated into individual grade block models for each element (zinc, lead, copper, silver and germanium). Block grade models had the same coordinate parameters as the un-folding model (see above). Estimation parameters in adjacent Table.
-
Continuity: Data search directions within the layers were controlled by the un-folding block model, and layer data was segregated by domain number. A vertical (Z) distance weighting of 1.5 was used to further enhance continuity in the plane (XY) of the layering.
-
Compositing: Down-hole drill hole sample compositing done to 0.5 m + residuals +50%.
-
Algorithm: Inverse distance squared (ID2) was used in a single pass. Interpolation of grades in two passes (to overcome issues of very localised highly anomalous grades) was considered but was not undertaken because of the limited numbers of high grade samples
 in particular. In a two-pass estimation an initial 1st pass uses all samples whilst a 2nd pass uses only high grade samples with severely restricted scan distances to over-write blocks close to high grades.
-
Scan distance:
-
A scan of 250 m was used to ensure grades were estimated in all blocks.
-
Distance was ~25% longer than generally longest N/S distances between drill holes.
-
In practice the boundary limit around the layer surfaces (and hence block model) limited actual scans to <80 m.
-
Data limits:
-
No lower cut or clip limits were applied or required as the layer intercept interpretation process had effectively applied a lower 0.2 % zinc cut-off already.
-
 No upper cut of clip was applied because of 1) the limited number of anomalous high grades, 2) their short intervals, and 3) the positive desire to allow the few high grades to register higher grades in some blocks.
-
Estimation stats given in adjacent Table.
-
Grade reporting block model:
-
 A normal “orthogonal-shaped” block model (MOL42.G3*, simply called a block model or block database) was built from the un-folding block model. Parameters in adjacent Table.
-
Block sizes/numbers were set to cover the same coordinates as the un-folding block model.
-
Primary plan XY block sizes were based on the un-folding block model (10*40 m). Vertical Z block size was assigned a fixed 10 m to be the same as X for the ~45° east dipping layers (so square in E/W cross-section). So primary block sizes were 10*40*10 m.
-
Primary blocks were sub-blocked 5*2*5 to increase resolution across strike along layer surfaces. So minimum sub-block size was potentially 2*20*2 m.
-
Block grades were loaded from the individual grade block models (see above).
-
Other variables, such as zinc equivalent grade and JORC classification variables, were computed using SQL macros (see below).
-
Grade block manipulation:
-
 A zinc equivalent (ZnEq) grade was calculated (using an SQL) from the individual zinc, lead and silver block grades.
-
Elements were factorised on their 3 month average metals prices up to the end of October 2026 and on their historical Molaoi metallurgical recoveries. Values in adjacent Table.
-
Check estimates:
-
November 2026 germanium MRE:
-
No previous JORC germanium Resource estimates exist at Molaoi for this November 2026 germanium MRE to be checked against.
-
A JORC unclassified preliminary germanium ‘quantity’ was reported in the 2024 MRE (4.8 Mt @ 21.9 g/t germanium) hosted within the zinc Resource.
-
However that quantity CANNOT be compared with this 2026 germanium Resource as they relate to greatly different data.
-
The September 2024 zinc MRE was checked against all available past estimates, particularly Rockfire’s own in 2022 and SRK’s in 2023. Details were given in the 2024 Zinc MRE Report.
-
The 2024 MRE was found to relate reasonably closely for particular mineralised layers (particularly L3) which could be identified as broadly similar.
-
By-product recovery:
-
Elements other than base metals and germanium were effectively not considered in this Resource estimate. Hence other potential by-products were not considered.
-
However the germanium reported is typically considered and commonly extracted as a by-product of some zinc deposits.
-
The significant tonnage and reasonable grade of germanium reported here would position Molaoi’s germanium as a definite potential by-product of Molaoi’s zinc Resource.
-
That by-product status would rely on germanium’s amenability to extraction from residues of Molaoi’s zinc beneficiation – something that would be presumed highly likely as Molaoi’s zinc mineralisation appears geologically and mineralogically similar to other zinc ores which successfully support germanium extraction.
-
Deleterious elements:
-
No deleterious elements have been considered or are known of
-
Block size – sample size relationship:
-
Situation:
-
Block sizes: Major block sizes were moderate at 10*40*10 m – and not considered too small for the typical data spacing. Sub-blocking (5*2*5) reduces those sizes along the edges of layers in a proportionate way.
-
Sample spacing:
-
Down-hole sampling was typically of the order of 1 m.
-
Drill N/S section spacing was typically 100 m, sporadically 200 m.
-
Hole E/W spacing on section was ~50 to 100 m.
-
Data search distances: Maximum ~250 m.
-
Distance relationships:
-
Plan block sizes were considered well-proportioned to drill hole spacing (20-25% in X and Y).
-
Vertical block sizes were considered very well-proportioned to down-hole sampling intervals (100% bigger in Z).
-
Model – SMU relationship:
-
No specific focus on selective mining units (SMU) occurred.
-
However The primary 10*40*10 m block size, with potential sub-blocking down to 2*20*2 m, would be similar in size to an underground mining SMU – given that the Consultant considers that mining by underground would be probable.
-
IGME’s past underground mining was done in drives of those dimensions.
-
Correlation between variables:
-
No specific work on variable correlation was done.
-
However it is very clear that the base metals and related elements are typically closely corelated within the mineralised layers, a feature used extensively through the mineralised layer intercept interpretation.
-
Although not specifically studied the germanium also closely correlates in its elevated concentration in concert with the base metals.
-
Germanium’s correlation with zinc was the subject of an independent June 2026 study by SLR Consultants for Rockfire.
-
SLR found a positive correlation between zinc and germanium.
-
SLR stated that “existing mineral domains would be acceptable for estimating germanium”.
-
Geological interpretation control of estimate:
-
Described in detail above in ‘estimation’. Mineralised layer intercept interpretation by layer in each drill hole sub-parallel to volcanic layering.
-
Summary: Block grade estimates was fundamentally geologically controlled by the geological interpretation of strong layered mineralization. Layers were specifically modelled to match layered geology and mineralisation. Grade estimates were confined by domain control and with ‘un-folding’ modelling trend grade continuity along layers.
-
Grade cutting/capping use:
-
No grade cutting of clipping was used.
-
Justification for this was
-
Layer interpretations effectively already clipped out low grades (below ~0.15% zinc).
-
Highly anomalous grades were relatively uncommon and where they existed the CP considered that they should be incorporated to realistically allow the known high grade shutes to be represented.
-
Highly anomalous grades were frequently over short intervals surrounded by multiple more moderate grades. This pattern was expected of the vein-like mineralisation.
-
The CP considers that individual anomalously high grades could potentially be clipped in future estimation, after consideration hole-by-hole, if they were found to be completely isolated.
-
Estimate validation:
-
Block geology validation:
-
Volume report: Initial checks compared volumes reported within geological layer model surfaces with volumes reported from the blocks built from them. Expect almost exact match. Checks all considered acceptable.
-
Plots: Visual cross-sectional plot comparison of block boundaries with geological model surface intersections. Particular focus was on validity of the blocks in each layer (possibly corrupt if the raw surfaces overlapped). Check also made of correct block domain assignments. Comparisons all considered good.
-
Block grade estimate validation:
-
Estimate stats: Initial basic checks to compare overall (not on a lode/domain basis) stats given during the block estimation – simple input drill sample stats with output estimated grade stats. Expect reasonable but not exact match. Particular focus was on closeness of maximums and raw averages. Results all considered acceptable.
-
Plots: Methodical visual cross-sectional plot comparison of colour-coded block grades with annotated drill hole samples. Comparisons all considered acceptable.
-
Estimate reconciliation:
-
2024 zinc estimate reconciliation: Described above under “Check estimates” for the L3 layer. Reconciliation considered good. Reconciliation was not possible for other layers as they were not previously interpreted.
-
2026 germanium estimate reconciliation:
-
Effectively no previous germanium estimates exist to be reconciled against.
-
The germanium quantity estimate in 2024, within the zinc model, does not represent a fair reconciliation estimate as it was within a far smaller volume (4.8 Mt vs 13.6 Mt here); its average grade (21.9 g/t germanium vs 14.0 g/t here) was highly focussed within a few layers; and the layers in 2026 were re-interpreted from those in 2026 (probably influencing the grade distribution between the primary germanium-bearing layers).
-
The CP’s overall view now is that the considerably increased quantum and of this 2026 germanium Resource, over the quantity estimated in 2024, is as would be expected from a refined and improved geological layer interpretation and the inclusion of considerably more germanium drill hole data with its more even spread.
|
|
Moisture
|
-
Whether the tonnages are estimated on a dry basis or with natural moisture, and the method of determination of the moisture content.
|
-
Moisture in tonnage estimation:
-
Tonnage was calculated using dry density.
|
|
Cut-off parameters
|
-
The basis of the adopted cut-off grade(s) or quality parameters applied.
|
-
Resource grade cut-off:
-
A lower cut-off of 4% zinc was used in reporting germanium Resources.
-
No germanium cut-off was used in reporting germanium Resources.
-
Basis:
-
The Molaoi germanium Resource mineralisation and grade anomalism is virtually coincident with the Molaoi zinc Resource (for reasons of intimate mineralogical association and mineralisation emplacement mechanisms).
-
Economics of germanium extraction would normally be expected to hinge on the economics of the zinc extraction – and the germanium would be contained within the zinc ore.
-
Therefore, the available germanium Resource would be fully contained within whatever zinc ore was extracted at the chosen mining zinc cut-off grade.
-
The zinc ore would contain all grades of germanium. It would seem very unlikely that it would be sorted on germanium grade (although higher grade germanium layers could be selectively mined).
-
Available from the tailings of the processed (and thereby homogenized) zinc ore the eventual germanium grade would also be homogenized and probably elevated above the average Resource grade reported here (14 g/t here).
-
Zinc is the predominant base metal in the deposit – making its cut-off grade most significant.
-
A 4% zinc cut-off was seen as reasonable and conservative when compared to a wide range of similar VMS deposits.
-
The value was also seen to be appropriate to envisaged underground mining.
-
A 4% cut-off lies approximately mid-way down the left-hand linear portion of the grade/tonnage curve and well away from smaller tonnages associated with the high grade tail produced by higher cut-offs.
-
The CP agrees with SRK’s 2023 comment that an alternative cut-off method could be based on a Net Smelter Return (NSR) value where each metal’s value contributes. However the CP did not go into that deeper level of refinement considering that the deposit is open in all directions and that further exploration could be expected to alter parameters to the good.
|
|
Mining factors or assumptions
|
-
Assumptions made regarding possible mining methods, minimum mining dimensions and internal (or, if applicable, external) mining dilution. It is always necessary as part of the process of determining reasonable prospects for eventual economic extraction to consider potential mining methods, but the assumptions made regarding mining methods and parameters when estimating Mineral Resources may not always be rigorous. Where this is the case, this should be reported with an explanation of the basis of the mining assumptions made.
|
-
Mining factors & assumptionS:
-
The CP assumed future extraction by underground “narrow vein” type mining.
-
Underground mining was undertaken successfully at Molaoi (within the current Lease) by IGME in the 1980s. That mining involved a 700 m decline and then drives on two levels.
-
Narrow vein type mining would be highly applicable to the deposit’s layers, in scale and geological form. It would also minimize dilution by being highly selective.
-
Envisaged mineral processing would be concentration by flotation on site. Underground bulk sampling and metallurgical test-work in the 1980s produced high recoveries (>90%).
-
Exports of concentrates would presumably be highly feasible through trucking on local sealed roads to local ports.
-
RPEEE:
-
The CP considers that the Molaoi zinc and germanium Project broadly has good RPEEE (Reasonable Prospects for Eventual Economic Extraction). That position rests on many aspects to the Project, including at least:
-
The quantum and grade of the 2024 reported zinc Resource is comparable internationally to other VMS deposits being economically mined.
-
Geology of VMS deposits is well understood.
-
Mining of underground VMS deposits occurs successfully. In deed this was proved by IGME’s test mining at Molaoi.
-
Underground mining at Molaoi would ameliorate environmental concerns.
-
Ore processing off-site would further ameliorate environmental concerns.
-
Molaoi’s metallurgical test work to date appears to support successful extraction.
-
Extraction of germanium from zinc ores is proven and practical.
-
The Molaoi Project is said to have broad community support locally.
-
Immediate local landowners support the Project and current exploration.
-
The Greek Government strongly supports the Project.
-
The location of the Project, in relation to road, port and services all appear to support the Project.
|
|
Metallurgical factors or assumptions
|
-
The basis for assumptions or predictions regarding metallurgical amenability. It is always necessary as part of the process of determining reasonable prospects for eventual economic extraction to consider potential metallurgical methods, but the assumptions regarding metallurgical treatment processes and parameters made when reporting Mineral Resources may not always be rigorous. Where this is the case, this should be reported with an explanation of the basis of the metallurgical assumptions made.
|
-
Metallurgical assumptions:
-
Past metallurgical test work on bulk samples from IGME’s 1980’s underground mining showed Molaoi’s (fresh) sulphide ore to be amenable to simple flotation separation, with high recoveries reported (95.8 % for Zn, 91.8 % for Pb, and 91 % for Ag).
-
Test-work on oxidized material proved inconclusive.
-
Results of that test work was used in various historical process flow studies.
-
The possibility of germanium extraction as a by-product was apparently not studied in the past – but would be suggested by the good quantities indicated in this estimate.
|
|
Environmen-tal factors or assumptions
|
-
Assumptions made regarding possible waste and process residue disposal options. It is always necessary as part of the process of determining reasonable prospects for eventual economic extraction to consider the potential environmental impacts of the mining and processing operation. While at this stage the determination of potential environmental impacts, particularly for a greenfields project, may not always be well advanced, the status of early consideration of these potential environmental impacts should be reported. Where these aspects have not been considered this should be reported with an explanation of the environmental assumptions made.
|
-
Environmental factors/assumptions:
-
The CP is aware of the agricultural nature of the Project area and of the probable sensitivities which could be associated with a ming project.
-
The CP is generally unaware of any potentially negative impacts of the Project environmentally.
-
The CP is generally aware of the good relationships which Rockfire has with local landowners and with Rockfire’s considerable efforts to minimize environmental harm during its exploration and drilling.
-
Envisaged underground mining would minimize environmental impacts in comparison the opencut mining.
-
Underground mining could potentially reduce waste by back-filling stopes.
-
Flotation concentration on site would pose minimal environmental risk.
-
Further concentration and smelting is apparently NOT envisaged on-site and would occur where the flotation concentrated would be shipped to (potentially Northern Greece).
|
|
Bulk density
|
-
Whether assumed or determined. If assumed, the basis for the assumptions. If determined, the method used, whether wet or dry, the frequency of the measurements, the nature, size and representativeness of the samples.
-
The bulk density for bulk material must have been measured by methods that adequately account for void spaces (vugs, porosity, etc), moisture and differences between rock and alteration zones within the deposit.
-
Discuss assumptions for bulk density estimates used in the evaluation process of the different materials.
|
-
Bulk density:
-
A considerable number of density measurements have been undertaken by Rockfire.
-
Measurements were used to produce a regression formula (SG = [2.5481 + (0.0284 * Zn%)]) for density based on zinc content.
-
Density determination using water displacement method: Density was determined from the weight and volume of samples of 10-15 cm long sections of drill core. Volume was determined by wrapping the core in plastic and measuring its displacement of water. Rockfire found this to be reliable with sample weights >700 g.
-
The CP used a default dry density of 2.7 t/m3 for the Resource estimate. This value was seen to be very close (within 2%) when applied to the average zinc grades in the Resource.
-
Density accounting for rock variability:
-
Rockfire’s dry density determinations were consistently made but could not fully account for rock variability due to the varied nature of mineralised intervals, and particularly by the broken and poor quality of parts of the mineralisation.
-
Assumptions behind density estimates:
-
Density determination relied heavily on sample recovery being 100%.
|
|
JORC Classification
|
-
The basis for the classification of the Mineral Resources into varying confidence categories.
-
Whether appropriate account has been taken of all relevant factors (ie relative confidence in tonnage/grade estimations, reliability of input data, confidence in continuity of geology and metal values, quality, quantity and distribution of the data).
-
Whether the result appropriately reflects the Competent Person’s view of the deposit.
|
-
JORC resource classification:.
-
No previous JORC classification: The September 2024 Zinc Resources were classified as Inferred (according to JORC (2012 Edition) by the CP. A tentative germanium ‘quantity’ was reported within those Resources – and was un-classified and not reported according to JORC.
-
2026 germanium Inferred classification: The CP considered here that 100% of these germanium Resources should be classified as Inferred according to JORC (2012 Edition).
-
Basis for Inferred classification:
-
The CP’s opinion was that all data and its modelling strongly implies geological and grade continuity along thinnish layers at Molaoi.
-
However the lack of or incomplete assaying and geological logging for many parts of historical drill holes (from the 1980’s and pre-Hellenic’s drilling since 2023) resulted in layers too frequently being implied from holes either side (over long distances (>200 m) in places) rather than being firmly interpreted. Incomplete assaying and logging of historical drill holes meant that many layers geologically interpreted for this Resource could not be reliably interpreted in historical holes, requiring interpolation of their positions and assignment of zero or minimal thickness.
-
Germanium assays were not available from any historical drilling (all germanium assays were sourced from Hellenic’s drill holes since 2023).
-
The CP accepts that “comprehensive” verification should not imply “complete” verification – but rather mean in a generalised sense that all combined old and new data meets a certain threshold of overall data compatibility. The CP does not believe that threshold has been met yet for a classification higher than Inferred.
-
The extent to which layer positions required interpolation would not “allow the application of Modifying Factors in sufficient detail to support mine planning”.
-
Notwithstanding that this 2026 Resource includes considerable new data from new drilling in 2025 and 2026 to add to the historical IGME and previous Hellenic drilling, the CP’s classification position generally mirrors previous positions by other Consultants (particularly as detailed by SRK). That is to say that the lack of “comprehensive” verification of historical data coupled with the inability to fully correlate it with new data prevents a higher classification.
-
Accounting for relevant factors:
-
The CP considers that appropriate account has been taken of all relevant factors.
-
The most relevant factors influencing the Inferred decision were the incomplete knowledge of historical drill hole logging and the remaining lack of sufficiently close-spaced and uniform drill holes.
-
The CP is fully aware that Rockfire is in the process of addressing the issue of close spaced uniform data through its current and on-going program of drilling.
-
CP’s view of classification:
-
The CP has a very positive opinion of the deposit in scale and grade, and that it remains open in all directions.
-
The CP now has increased confidence (since the 2024 zinc MRE) in the interpretation of the deposit’s mineralised layer geology. This 2026 interpretation is considered as a second phase interpretation, which confirmed and improved on the earlier interpretions.
-
The CP considers data analysis results, drill hole spacing, and Resource estimation methods used fully support the classification given.
-
The CP believes that a reasonable proportion of the current Inferred Resources would be readily upgraded to at least the Indicated class by relatively minimal continued exploration drilling amongst (and beyond) the recent Hellenic 2023 to 2026 drill holes where they were closest and most evenly spaced to achieve an even spacing envisaged as <75 m.
-
Furthermore a more considerable portion of the current Resource could be upgraded by a larger program in-fill drilling between all existing drill holes to halve the current along-strike N/S spacing to 100 m and the cross-strike E/W (cross-sectional) spacing to 50 m.
|
|
Audits or reviews
|
-
The results of any audits or reviews of Mineral Resource estimates.
|
-
Audits:
-
The Project and the previous Rockfire 2022 Resource estimate was reviewed by SRK in 2023.
-
That “high level” review looked at Project data, exploration techniques and previous Resource estimates. It included a site visit and computation of a check estimate.
-
On Rockfire’s MRE SRK comments were positive and noted that:
-
The approach to modelling was the best possible considering the data available.
-
Rockfire’s 2% zinc cut-off for interpreting layer intercepts could have been lower so as to include more lower grade intervals.
-
Block size used was too small relative to data spacing, but considering the Inferred status this was not material.
-
The Inferred classification was appropriate.
-
The reporting 4% zinc cut-off should be replaced by an NSR value.
-
Metal price assumptions should be long-term forecasts rather than spot prices.
-
SRK’s check estimate returned figure very close to Rockfire’s, thus validating it and proving Rockfire’s estimation approach to be reasonable.
-
SRK noted the potential for additional Resources in the model area as additional lenses in both the hanging wall and the footwall and along strike. They noted “The mineralisation drilled and modelled to date is quite continuous and suggests that it is likely that extensions to existing modelled zones, as well as additional zones of mineralisation, will be located with additional exploration”. They added that “There are additional significant intersections on the project that have not been modelled to date and suggest even further potential”.
-
The Consultant strongly agrees with comments in the last paragraph, and included those additional intersections and more in this 2024 Resource.
-
SLR Consultants performed aspects of a Project Review for Rockfire in June 2026. That work included positively reviewing data and drilling results, updating geological models and making drilling recommendations. Apart from comments on specific drill hole SLR’s conclusions and recommendations included:
-
Comments that “the drill hole files were error-free and in good shape”.
-
Notes on refining the overlying oxide layer definition.
-
Comments and notes on the dip of the layers and the possibility of faulting being present to offset layers. In general SLR’s comments concerned an increase in dip to that interpreted in 2024 by the CP – which the CP agrees with and implemented in many places in this 2026 re-interpretation.
-
Comments that “Planned infill drilling will provide further close-spaced data and either support the current interpretation or lead to a renewed interpretation of mineralised zone continuity in the north of the current deposit extent”.
-
A very encouraging comment that “SLR completed a statistical analysis of pXRF data against assay data. Overall, pXRF data is efficient at highlighting mineralisation through spot checks of the core”.
-
Specifically dealing with germanium comments that “A review of Ge mineralisation showed that there is a moderate positive correlation with Zn mineralisation and that the current Zn domains seem appropriate for Ge estimation during an updated Mineral resource estimate”. The CP here would comment that SLR appeared to analyse all zinc/germanium samples together without domaining them by layer (and excluding ‘waste’ samples between zinc-mineralised layers). Doing so would have produced a considerably higher positive correlation.
-
SLR recommended “If possible, re-assay the historic core where pXRF has identified mineralisation”. The CP strongly supports this.
-
SLR also recommended Rockfire to “collect structural data such as veins, bedding and foliation. This will support the modelling of mineralised zones”. The CP strongly supports this.
|
|
Discussion of relative accuracy/ confidence
|
-
Where appropriate a statement of the relative accuracy and confidence level in the Mineral Resource estimate using an approach or procedure deemed appropriate by the Competent Person. For example, the application of statistical or geostatistical procedures to quantify the relative accuracy of the resource within stated confidence limits, or, if such an approach is not deemed appropriate, a qualitative discussion of the factors that could affect the relative accuracy and confidence of the estimate.
-
The statement should specify whether it relates to global or local estimates, and, if local, state the relevant tonnages, which should be relevant to technical and economic evaluation. Documentation should include assumptions made and the procedures used.
-
These statements of relative accuracy and confidence of the estimate should be compared with production data, where available.
|
-
Accuracy & confidence in the estimate:
-
Statement: The CP is confident in the accuracy of the estimate.
-
Reasons include:
-
The careful geological mineralised intercept interpretation and layer surface modelling are considered the most appropriate to the style of mineralisation.
-
The clear continuity of grades between virtually all of the drill holes (particularly the closer-spaced ones) gives the CP confidence in the interpretation.
-
The historical underground mine convincingly proved the dipping layer mineralisation style and attitude as well as the practicality of extraction.
-
Historical metallurgical test-work proved good extractability of metal.
-
Parts of these interpretations and estimates may be considered as at least second generation studies.
-
Zinc Resource estimation for layer L3 closely reconciles with previous estimates.
-
Risks to the Resources:
-
The CP considers potential risks to the general scale of the estimate to be minimal (with qualifications below) and that further exploraiton should increase the Resources.
-
Further drilling within the current densely drilled area would be more likely than not to increase the Resource.
-
That statement considers that some recent drilling has been generally poor (in fact and apparently in comparison to some historical drilling), with low recovery in some mineralised zones (thereby under-calling them). Improved drilling techniques should improve recovery and hence Resources.
-
Most, if not all, mineralised layers remain open to depth and along strike – implying that further drilling will increase the Resources.
-
Potential risks identified, all considered moderate to very low, were:
-
Miss-interpretation (particularly correlation) of layers was possible due to some wide hole spacings and due to missing data from historical drill holes.
-
Down-hole survey data – missing for historical holes and apparently all straight for recent holes. Risk of mis-aligning hole traces.
-
Sample accuracy – due to low quality/recovery of some sampling of broken mineralisation. Risk of under-estimating grade.
-
Base of limestone has not yet been modelled. Impact unknown.
-
Use of default density. Very slight possibility of under-estimating tonnage.
-
Lack of assay cutting. Anomalously high grades were very few in number, were generally from very short sample intervals, were probably under-called anyway, and down-hole compositing almost completely removed their effect.
-
Global or local estimate: This is a global estimate.
-
Comparisons with production data: No production data yet exists for the Project.
|