Mobilizes Drill Rig and Ancillary Equipment Topaz

AI SummaryClose X

Pulsar Helium Inc. has mobilized a drill rig and equipment to its Topaz Project in Minnesota, with drilling of the first well, Jetstream #3, expected to begin this week. The program includes drilling up to ten wells targeting helium-bearing zones at depths between 1,500 to 3,900 feet. This campaign aims to define the geometry, extent, and productivity of the helium reservoir previously identified. The Jetstream #1 well previously delivered a peak gas flow rate of approximately 1.3 million cubic feet per day with a sustained flow of 7-8% helium. The data collected will be analyzed in real time to refine the reservoir model and identify optimal sites for future production infrastructure.

Disclaimer*

UK 100

Latest directors dealings