Obonga Project: Wishbone Drill Programme Update

AI SummaryClose X

Panther Metals Plc has provided an update on its Phase 1 diamond drill programme at the Wishbone volcanogenic hosted massive sulphide prospect on the Obonga Project in Ontario, Canada, with a second diamond core drill rig being commissioned to accelerate exploration beyond the initial 2,000-metre budget. The first drill hole intersected nine distinct zones of sulphide mineralisation, including 3.45m of pyrrhotite-dominated massive sulphide and 9.9m of semi-massive sulphide, while the second hole also intersected alternating massive and semi-massive sulphide intervals. This visual logging of significant sulphide mineralisation, which aligns with geophysical models, follows previous assay results at Wishbone that returned 3.6 metres grading 3.9% zinc, including 2.0 metres at 6.8% zinc and 4.3 g/t silver.

Disclaimer*

UK 100

Latest directors dealings