PANTHER METALS PLC
("Panther" or the "Company")
(Incorporated in the Isle of Man with company number 009753V)
Panther Metals plc
Half Yearly Financial Report
For the six months ended 30 June 2026
Chairman's Statement
I am pleased to update shareholders and stakeholders on the significant progress achieved across Panther's project portfolio during the six-month period ended 30 June 2026 and subsequent developments through to 25 September 2026.
Obonga Project
The Obonga Project remains the Company's flagship exploration asset and continues to deliver encouraging results as Panther advances its understanding of the district-scale Obonga Greenstone Belt in Ontario. Covering approximately 291 km², the project has evolved from a regional exploration concept into an emerging mining camp with demonstrated base metal, precious metal and critical mineral potential.
The primary focus during the period has been the Wishbone Prospect, where previous drilling confirmed the presence of a significant volcanogenic massive sulphide ("VMS") system. Following detailed geophysical modelling and interpretation of drone-based magnetic survey data completed in 2025, the Company commenced the 2026 Phase 1 Diamond drilling programme to test multiple high-priority targets. Drilling successfully intersected numerous zones of massive and semi-massive sulphide mineralisation, including broad intervals of sulphide-rich horizons and alteration consistent with the Company's geological model of a fertile VMS system. These results further enhance the prospectivity of the wider Obonga Greenstone Belt and support the potential for additional discoveries within the district.
At the Awkward Conduit Target, exploration focused on a prospective nickel-copper-platinum group element magmatic sulphide system. During the period the Company completed its first drill hole targeting the interpreted feeder conduit and successfully intersected the targeted intrusive sequence. Together with the ongoing reinterpretation of historical core and previous geophysical work, these activities have advanced Panther's understanding of what could represent a significant critical minerals exploration opportunity.
Although project activities were temporarily disrupted by this summer's regional wildfires, the drill core is now in processing and preparations are underway to continue exploration activities with step-out drilling in 2027 and the completion of the 70km access trail to facilitate year-round access. We hugely appreciate the support of Broken Rock Resources on this project in 2026, with our option agreement now extended to 31 August 2027 facilitating drill permit renewals to allow for future infill drilling based on the anticipated results of the Phase 1 Diamond Drilling Programme.
Winston Tailings Project
The Winston Tailings Project continues to advance towards the important milestone of a maiden Mineral Resource estimate. Located at the historic Winston Lake Mine, the project has the potential to recover valuable metals from historical tailings while simultaneously supporting environmental rehabilitation objectives.
During the reporting period, Panther completed a substantial vibracore sampling programme across the tailings storage facility. A total of 109 sampling locations were successfully completed, with results demonstrating good consistency both vertically and laterally throughout the deposit. The programme exceeded expectations in several areas, including tailings thickness, and has generated an extensive database to support the resource estimation work currently being undertaken by SRK Exploration.
In parallel, metallurgical testing commenced through Extrakt Process Solutions to evaluate the recovery of gold, silver, zinc, copper, cobalt, gallium, indium, and other contained metals. The metallurgical programme forms a key component of both the resource estimation and permitting pathways. In addition, the Company signed a non-binding Letter of Intent with Traxys Europe SA, providing early validation from a globally recognised commodity trading group as work progresses towards project development.
Dotted Lake Project
At Dotted Lake, Panther continues to evaluate a highly prospective land package situated within the Schreiber-Hemlo Greenstone Belt. Previous exploration successfully identified multiple mineralisation styles, including gold, base metals, and magnesium-bearing ultramafic rocks.
During 2026, the Company's focus shifted towards assessing the commercial potential of recovering magnesium from the extensive serpentinite-hosted mineralisation identified during the 2024 drilling programme. Metallurgical investigations completed by TDI Solutions confirmed the suitability of the Dotted Lake ultramafic intrusive as a magnesium-rich feedstock and demonstrated encouraging preliminary results using Extrakt's proprietary extraction technology. Importantly, the work also highlighted the presence of potentially valuable by-products, including chromium, nickel and cobalt, which may warrant further evaluation in future development studies.
Following a review of the Phase 1 magnesium study outcomes and assessing opportunities for further technical work aimed at advancing the project, the Company is defining the potential scope of a Phase 2 programme.
Stakeholder Relations
Panther continues to nurture our important relationships with First Nation stakeholders, local community and governmental relations and key project suppliers, to maintain the Company's standing as an active explorer dedicated to make a positive impact for all concerned.
Corporate Activities
In corporate activities to 30 June 2026, Panther raised £1,190,000 in February and £2,500,000 in June through placings, and £90,000 in warrant conversions. The support from new and existing shareholders in the period is hugely valued. This was further demonstrated post period end by the conversion of 440,000 75p warrants raising £330,000 for the Company.
Outlook
The Board is focussed on continuing to execute our strategy and to strengthen our position as we advance three distinct opportunities which each benefit from Ontario's established mining jurisdiction with good infrastructure access, proximity to Thunder Bay, and qualification for Canadian critical minerals support programmes.
• Winston Tailings: Near development potential with existing infrastructure and scheduled MRE.
• Obonga: Early-stage exploration with multiple VMS discoveries and PGE potential- further drilling to take place in 2027.
• Dotted Lake: Advanced exploration confirming widespread base metal and gold mineralisation with current focus on magnesium.
Overall, the Board is pleased with the progress achieved across the portfolio in 2026 to date and I would like to thank everyone involved for their hard work and dedication. Exploration activity at Obonga has further strengthened confidence in the emerging district-scale opportunity, Winston continues to move closer to a maiden Mineral Resource estimate and development pathway, and Dotted Lake has delivered encouraging indications of its potential as a critical minerals project.
We look forward to updating shareholders on further developments as work progresses across all three projects.
Nicholas O'Reilly
Executive Chairman
25 September 2026
INTERIM MANAGEMENT REPORT FOR THE SIX MONTHS ENDED 30 JUNE 2026
Operational Highlights
Key operational milestones achieved during the six-month reporting period to 30 June 2026 and from the period end to 25 September 2026.
Obonga Project Background
· Total Area: 291 km2
· Prospective for: Base Metals (Copper, Zinc, Lead, Nickel) and Precious Metals (Gold, Silver and Platinum Group Metals) with Energy Mineral (Lithium, Graphite) potential.
· Primary Prospect Areas: Wishbone, Awkward
· Secondary Prospect Areas: Survey, Ottertooth and Silver Rim.
· Significant Neighbours: Mattabi Mine (Glencore) and Sturgeon Lake VMS Camp to west, Lac des Iles Mine (Impala Canada) to south.
· Option with Broken Rock Resources until 31 August 2027 (RNS 10 September 2026)
· Current focus: Core processing and step-out drilling in 2027.
The Obonga Project is Panther's flagship project, which has advanced from a greenfield regional data-based target area, through proof of concept to drilling success and base metal VMS and graphite discoveries. The project covers 90% (291 km2) of the district scale Obonga Greenstone Belt in northwest Ontario.
The Obonga Greenstone Belt, with its emerging VMS Camp status, is strategically positioned close to national railroad transport links and the industrial port city of Thunder Bay. Moreover, it is approximately 75km east of the former Mattabi/Sturgeon Lake Mining Camp on the Wabigoon Greenstone Belt, underlining its advantageous geological and logistical position.
The presence of significant gold occurrences, base metals, and promising exploration results in the Obonga Greenstone Belt contribute to its appeal as a potential mining district. This strategic positioning makes it an attractive prospect for future resource development and exploration.
Panther has achieved significant milestones through successful drilling campaigns at Obonga's Wishbone prospect, revealing a substantial Volcanogenic Massive Sulphide system. The Wishbone discovery, a first of its kind on the Obonga Greenstone Belt, is characterised by impressive drill hole intercepts, including 27.3m of massive sulphide and 51m of sulphide-dominated mineralisation.
The Wishbone 2026/27 drill programme follows on from the 2025 drone magnetic survey work and the results of the 2022 drill programme to target multiple high priority electromagnetic ("EM") and magnetic geophysical anomalies prospective for volcanogenic massive sulphide ("VMS") hosted copper / base metal mineralisation. Panther's two-hole 600m drilling programme in autumn 2021 had previously confirmed Wishbone as a VMS base metals target. Further drilling in late 2022 reaffirmed the potential, with intersections such as 3.6m @ 3.9% Zn, including 2m @ 6.8% Zn & 4.3 g/t Ag, indicating proximity to metal-fertile fluid flow. The discovery of the Wishbone VMS system is pivotal, boding well for the existence of additional VMS bodies in the vicinity, given their tendency to occur in clusters.
The Wishbone VMS system is covered by Exploration Permit PR-24-000022 which is valid through 20 June 2027. This permit authorises a comprehensive exploration programme, including up to 39 diamond core drill holes and down-hole electromagnetic geophysics.
The Survey and Awkward targets have also benefitted from preliminary drilling, confirming VMS style mineralisation at Survey with a 29m wide intercept of cyclical semi-massive and disseminated sulphide, with graphite discovered at Awkward.
The Awkward magmatic feeder conduit target at Obonga is focused on a nickel-copper-platinum-palladium discovery, the significant pathfinders in the Awkward area continue to gain traction within the industry.
Awkward is a PGE, Ni and Cu magmatic sulphide prospective conduit and layered mafic intrusive target. The target comprises a highly anomalous geophysical target comprising a coincident magnetic remnant low and electromagnetic conductor. Historical surface sampling in the target area returned anomalous palladium (Pd) and platinum (Pt) up to a reported 1.23 g/t Pd+Pt and historical drilling on the periphery of the target intersected un-assayed massive and disseminated sulphide and chalcopyrite in course gabbro and 'marble cake' textured gabbro which matches the description of the varitexture gabbro ore zone within Impala's Lac des Iles Platinum Mine located due south of Obonga.
As part of the ongoing assessment of the Awkward Target Panther sourced and acquired the historical drill core from three drill holes (PL-13-01, PL-13-02 and PL-13-03) drilled by Navigator Minerals during 2013 for further investigation and reanalysis.
This, coupled with the Wishbone discovery, solidifies the Obonga Greenstone Belt's status as a new emerging VMS Camp.
On 9 February 2026 Panther announced plans for an approximately 2,000-metre diamond drilling programme at the Wishbone Prospect. The work is covered by Exploration Permit PR-24-000022, which is valid through to 20 June 2027, and which covers up to 39 diamond drill pads and down-hole electromagnetic geophysics.
On 27 February 2026 the Company provided an update for the Wishbone Prospect stating that following the completion of the 2025 high resolution drone based airborne magnetic geophysics survey at the Wishbone Prospect, the geophysical data has been subjected to combined three-dimensional inversion and geological modelling with a view to refining the parameters of the permitted drill holes ahead of a diamond drilling programme (see Figures 1, 2 & 3).
|
|
|
|
Figure 1: Plan view of modelled Wishbone VMS Target showing magnetic inversion model, geological contacts and location of Panther diamond drillholes (based on magnetic inversion model shells). Notes: Scale bar and north arrow in bottom left corner of figure. Coordinates stated in UTM Zone 16N NAD 83 datum. Image highlights the size of the modelled magnetic body at depth. Dark blue dots signify permitted drill pad locations. The figure is overlain by a semi-transparent surface rendering of the topographical map, from which the trace of the Wishbone Lake can be discerned (light blue). The green block model below the topography reflects the greenstone volcanic geology, the beige block model to the north is granitoid. The granitoid/volcanic contacts are interpreted to be faulted. A series of three concave fault/contacts are currently interpreted to dissect the magnetic inversion model. The down-hole traces of Panther's 2021 and 2022 drilling are shown in plan view. The working model is dynamic and will be updated as the 2026 work programme develops. |
|
|
Looking south (180° / 45°) |
Looking north (000° / 45°) |
|
Looking north-westerly (340° / 45°) |
Looking north-easterly (060° / 45°) |
|
Figure 2: Series of oblique three-dimensional views of modelled of modelled Wishbone VMS Target showing location of Panther diamond drillholes (based on magnetic inversion model shells). Notes: Image highlights the size of the modelled magnetic body at depth. Blue dots signify permitted drill pads. For relative scale and description of other features please see the notes below Figure 1. |
|
On 6 May 2026, the Company announced that drill pad preparations had commenced at the Wishbone VMS Prospect and at the Awkward Conduit Prospect.
On 26 May 2026 the Company announced the commencement of the discovery focussed diamond drilling programme at the Awkward Conduit Target, targeting the interpreted base of a potentially tube-like magma conduit system, or chonolith, modelled as the magmatic feeder to the Awkward Intrusion, which hosts anomalous levels of Ni, Cu and PGE. The initial phase of drilling consisted of a single near-vertical diamond drill hole to a planned depth of approximately 400 metres. The objective was to validate the Company's exploration theory and improve geological understanding of the target area.
On 11 June 2026, the Company announced the completion of the Awkward drill hole BR26-AW-P1-1 attaining a vertical depth of 401m and intersecting the targeted intrusive.
The Company further announced the commencement of drilling at the Wishbone Prospect, with hole BR26-WBP1-1 planned as a 300m deep inclined hole designed to test the VMS mineralisation strike extension approximately 500m to the north of previous wide VMS intersections. Based on the results of previous studies, Wishbone is interpreted to be a sub-seafloor VMS system. The current drill programme which is informed by the Company's previous drilling, geophysics survey data and three-dimensional inversion model (Figure 1) is designed to test for the expected temperature related copper and zinc metal depositional zonation.

Figure 3: Wishbone Exploration Permit Planned Drill Pads and Access
On 6 July 2026, the Company announced the extension of the option agreement with Broken Rock Resources to 30 April 2027, with that date subsequently amended to 31 August 2027 (announced 14 September - see below).
On 10 July 2026, the Company provided an update on the Phase 1 diamond drill programme. The first diamond core drill hole (BR26-WB-P1-1) at Wishbone, successfully attained the planned downhole depth of 300m, it intersected nine distinct zones of massive, semi-massive and iron-silicate dominated sulphide mineralisation commencing at a downhole depth of 77.75m to a downhole depth of 245m. These intersections included 3.45m of pyrrhotite dominated massive sulphide and 9.9m of semi-massive sulphide from 77.75m downhole depth. Between 98m to 105m downhole depth, visual core logging has identified sulphide rich metasediments interpreted as greenalite exhalite rocks which may have formed when iron and silica rich hydrothermal fluids mixed with seawater in proximity to the ancient seafloor hydrothermal vents associated with VMS and precious metal mineralisation. These greenalites continued alternating in sulphide tenor from 112.5m to 119m with further pyrrhotite massive sulphide (137m to 139m) and semi-massive sulphide intervals (162m to 172m, 187.5m to 188m and 237m to 240m).
The second diamond core drill hole (BR26-WB-P1-2) at Wishbone, intersected the target VMS horizons along strike to the south with a projected end of hole depth horizontal spacing between the inclined holes of circa 170m. In BR26-WB-P1-2 alternating massive and semi-massive sulphide was intersected between 63.5m and 78.4m downhole and between 107m and 120m downhole. Alternating sulphide rich metasediments interpreted as greenalite exhalite rocks and semi-massive sulphides continue from 120m to the then currently logged core depth of 158m downhole.
In addition, the Company announced the commissioning of a second diamond core drill rig by its drilling contractor in advance of it mobilising to the Obonga site from Manitoba. The additional drilling capacity was planned to accelerate exploration past the originally planned 2,000 metre drilling budget.
On 14 September 2026 the Company provided an update that the drilling and access trail construction activities at Obonga were paused for a period during Canadian Government wildfire restrictions which impacted much of Northwestern Ontario, with trail building resuming in the second half of August.
At the end of August, the Wishbone access trail was nearing completion having successfully connected old logging trails via the Obonga West Road to the main road network to Thunder Bay (Figure 4). There is a short section of new trail still required to connect to the drill permit area in addition to further upgrading of the existing logging trails to facilitate year-round access.
In line with the Exploration Permit conditions the drilling activities were paused to accommodate the autumn hunting season and will resume as accommodated by the Obonga extension agreements.

Figure 4: Section of Panther's new drill access trail linking the logging trails west of the Obonga West Road with logging trails in the Uneven Lake Area
The Company also reported that the drill core from the summer drilling has been logged and photographed, with magnetic susceptibility readings and pXRF assays undertaken for the entire drill strings, with laboratory assays expected in due course. Whilst the point-data pXRF readings cannot be considered representative of core intervals as grades can only be reliably determined through the chemical analysis of crushed core samples, they do provide a useful supplement to the identification of specific minerals observed in the drill core, as well as providing a guide to sample selection for laboratory assays and subsequent drill hole planning.
The pXRF readings at Wishbone have confirmed the visual identification of discrete chalcopyrite mineralisation containing up to 8.34% copper (see Figure 5), within a much wider intersection of pyrrhotite dominated massive sulphide and semi-massive sulphide mineralisation (as reported 10 July 2026).
This copper mineralisation is particularly significant as it is the first seen at this tenor in the Obonga drilling and provides compelling geological support for the existence of the expected much more extensive copper mineralisation that could be the source of the significant copper anomalies identified in the lake-sediment samples taken from Wishbone lake and the streams which drain off the Wishbone area both to the north and to the south (Figure 6).
An important characteristic of VMS deposits is that they typically display a zonation of metals within the massive sulphide body from Fe+Cu at the base to Zn+Fe±Pb±Ba at the top and margins, related to differing temperature and chemical conditions at mineral deposition. The major observed mineral component of the Wishbone massive sulphide mineralisation is pyrrhotite with less common pyrite and minor sphalerite and chalcopyrite in distinct zones.
|
|
|
Figure 5: Photograph of drill core with chalcopyrite mineralisation (gold coloured) which yielded pXRF readings of 8.34% Cu at 146.5m downhole depth in drill hole BR26-WB-P1-1. With the measurement screenshot from Olympus Vanta M Series pXRF unit
By mutual agreement Panther and Broken Rock Resources agreed to a further extension amendment over Obonga, extending the terms of the original agreement (as announced 2 August 2021 and amended 6 July 2026), from the previous expiry date of 30 April 2027 to 31 August 2027, in light of the very positive preliminary drill findings at the Wishbone VMS prospect and the Awkward Conduit Target. The extension was agreed to facilitate drill permit renewals to allow for future infill drilling based on the anticipated results of the Phase 1 Diamond Drilling Programme. In consideration for the extension the Company issued share options to subscribe for 25,000 ordinary shares of no-par value in the capital of the Company, at an exercise price of £1.70, over a three-year term expiring 31 August 2029. The share options issued under the 2021 sale and purchase agreement expired without exercise.
|
. |
|
Figure 6: Lake Sediment Sample Assays Show Very Strong Copper Anomalism Downstream of the Wishbone VMS system |
Winston Tailings Project
· Historical polymetallic mine near Schreiber Ontario
· Total Area: 60.41km2
· Prospective for: Base Metals (Zinc, Copper, Cobalt, Gallium and Indium) and Precious Metals (Gold and Silver)
· Option Agreement with First Quantum Minerals in place until 15 June 2027 (extendable in 12-month instalments thereafter to 15 June 2029 for CAD$50,000 every 12 months)
· Non-binding LOI signed with Traxys Europe SA, a global commodity trading and marketing leader.
· Current focus: Maiden NI 43-101 Mineral Resource estimate underway with SRK
The Winston Tailings Project entails a series of workstreams to quantify, evaluate and permit the contained high-grade gold (Au), gallium (Ga), silver (Ag), zinc (Zn), copper (Cu) and cobalt (Co) and other recoverable minerals located within the historic Winston Lake Mine tailings storage facility (Figure 7). Based on historic processing recoveries it is believed that a significant quantity of valuable material was not captured and remains in the tailing storage facility. Reprocessing the mine tailings, potentially offers Panther the opportunity to unlock residual metal value and contribute to the long-term environmental rehabilitation of the Winston Project site.
The Winston Lake Mine was operational from 1988 to 1998, producing approximately 3.3 million tonnes of ore and yielding zinc, copper, silver, and gold. Based on historic recoveries from mining activities in the 1980s and 1990s. The previous mining operation closed in February 1999 due to very low zinc prices at the time. In total, 3.4 million tonnes grading 1.0% copper and 16% zinc was mined and processed.
The Winston Project is located only 20 km from the trans-Canada highway and rail transport links (Figure 7). Onsite infrastructure includes a 115kv power line, plant site, tailings and freshwater facilities, transport links and underground development (Figure 8).

Figure 7: Location of the Winston Project

Figure 8: Winston Project infrastructure including plant site, tailings and water storage facilities
In Q1 2026, the Company conducted a winter vibracore drilling programme on the frozen Winston tailings lake. The programme used working methods which the Company developed in conjunction with its principal drilling contractor under the geological supervision of independent geological contractors with whom the Company had worked several times before. The aim of the work was to advance the workstreams to quantify, evaluate, and permit the recovery of the contained high-grade gold (Au), gallium (Ga), silver (Ag), zinc (Zn), indium (In), copper (Cu) and cobalt (Co) and other recoverable minerals located within the historic tailings storage facility ("TSF").
On 7 January 2026, the Company announced the appointment of Extrakt Process Solutions LLC ("Extrakt") to conduct phased metallurgical testwork for the recovery of metals from the project. With the testwork to be conducted in association with TDI Solutions LLC, an independent laboratory authorised and equipped to implement the Extrakt innovative hydrometallurgical extraction technology. This work and associated studies are inputs into the Application for Recovery of Minerals Permit (the "Recovery Permit") process as announced 1 September 2025.
The Phase 1 metallurgical characterisation and testwork was to be conducted on representative composite samples of tailings material obtained from the vibracore sampling programme. The Phase 1 work was designed to generate baseline data on metal extraction performance, which will guide and support the design of subsequent testwork phases to determine the recoveries for gold (Au), gallium (Ga), indium (In), silver (Ag), zinc (Zn), copper (Cu) and cobalt (Co) and/or other recoverable metals contained within the historic Winston Lake Mine tailings storage facility.
The Phase 1 metallurgical results will also support the Reasonable Prospects of Eventual Economic Extraction requirement for the Mineral Resource estimate ("MRE") being conducted by the SRK Group.
The MRE and the Extrakt metallurgical testwork are integral workstreams to advance the Winston Tailings Project through permitting towards a cashflow proposition.
On 10 February 2026, the Company provided an update on the Winston Tailings Project as follows:
· Tailings sampling work is underway onsite under the geological supervision of independent geological contractors Bayside Geoscience Ltd ("Bayside") using the Platinum vibracore sampler mounted on a purpose-built ice barge, situated upon the frozen tailings pond. The vibracore sampler retrieves a representative cylinder of tailings material through the vertical profile of the tailings, from points at regular grid spacings across the TSF.
· The first batch of tailings samples are now undergoing logging and sampling by Bayside in the city of Thunder Bay. Once prepared the tailings will be sent for geochemical analysis in support of the Mineral Resource estimate.
· The Mineral Resource estimate is being undertaken by independent consultants SRK Exploration Ltd ("SRK EX"). The MRE will be reported in compliance with the standards and best practices set out by the Canadian Institute of Mining, Metallurgy and Petroleum's ("CIM") for reporting Mineral Resources, Ore Reserves, and related exploration information. This will also facilitate future NI 43-101 reporting, as required.
· The MRE is an integral part of the process to advance the Winston Tailing Project towards a cashflow proposition and will be based upon the resource sampling programme, mineralogical and metallurgical testwork and associated studies. The MRE work will also provide inputs into the Application for Recovery of Minerals Permit (the "Recovery Permit") process as announced 1 September 2025.
· Upon receipt of the geochemical assay results a bulk composite sample of the Winston tailings will be sent to Extrakt Process Solutions, LLC. who will conduct phased metallurgical testwork for the recovery of metals. The testwork will be conducted in association with TDI Solutions LLC. Extrakt has developed a proprietary environmentally friendly cyanide-free technology for enhanced leaching and recovery of gold and other metals from all types of ores and solid-liquid separation that significantly improves dewatering and consolidation of mine tailings.
On 19 February 2026, the Company announced that it has signed a letter of interest ("LOI") with Traxys Europe SA, a division of Traxys Group ("Traxys"), a global commodity trading and marketing market leader.
The non-binding LOI concerns Panther's Winston Tailings Project and is a formal recognition of an ongoing engagement between both parties as Panther progresses work to declare a Mineral Resource estimate, as part of series of ongoing workstreams to quantify, evaluate and permit the contained high-grade Au, Ga, Ag, Zn, Cu, In and Co and other recoverable minerals located within the historic Winston TSF.
On 16 March 2026 the Company announced the vibracore sample collection work phase at the Winston Tailings Project has successfully completed and that the thickness of the tailings exceeded expectation reaching a maximum vertical thickness of tailings (below ice and water) of 16.8m and with an average vertical thickness of 8.7m. Laterally and vertically representative tailings core samples successfully retrieved from across the extent of the frozen tailing pond, with representative HQ core (63.5mm) diameter cylinders of tailings material through the vertical profile of the tailings, from 109 locations at regular grid spacings across the TSF (see Figure 10).

Figure 9: Photograph of the Platinum Vibracore Sampling Ice Barge on the Frozen Winston Tailings Pond, 3 February 2026
The Vibracore sampling grid comprises a total of 109 collar locations, staggered at a nominal spacing of 50m along east-west fence lines spaced at 25m north-south, for an effective horizontal sample spacing averaging either 25m or 35m between fences. Duplicate 'twin' core material was retrieved at 3 locations, whilst vertical profiles were restarted at 6 of the locations. The completed sample grid measures up to 904m along the long axis and up to 230m perpendicular to the TSF long axis.

Figure 10: Winston Tailings 2026 Vibracore Sampling Collar Locations
The assay results from the drilling were announced in 6 batches on 17 March 2026, 19 March 2026, 14 April 2026, 28 April 2026 and 13 May 2026. All results showed good grade consistency across the vertical depth-profile and laterally between Vibracore hole collar locations and supported or exceeded the 2025 preliminary assay results announced on 30 July 2025.
On completion of the programme, a bulk composite sample of the Winston tailings was provided to Extrakt who are conducting phased metallurgical test work for the recovery of metals. The results of this test work will be used by SRK EX in support of the MRE.
Dotted Lake Project Background: Critical Mineral Potential
· Total Area: 36.9 km2
· On the north limb of the Schreiber-Hemlo Greenstone Belt, 16 km from the Hemlo Mine and next door to GT Resources' Tyko discoveries.
· Prospective for: Magnesium, Base Metals (Nickel, Cobalt, Copper, Zinc) and Precious Metals (Gold, Silver, and Platinum Group Metals)
· Significant Neighbours: Barrick Gold (Hemlo Mine) to south, GT Resources (TSXV: GT) (Glencore 16.7% stake) to east.
· 100% owned project, not under option
· Core current focus: recovery of magnesium from serpentinite
The Dotted Lake Project encompasses a substantial 36.9 km² (Figure 11) within the North Limb of the Schreiber-Helmo Greenstone Belt, situated 16 km north of Barrick Gold's Hemlo Gold Mine which has produced over 22 Moz of gold over 30 years to date and 9 km from GT Resources recent discovery at West Pickle Lake on their Tyko One Belt. The area is considered very prospective for ultramafic intrusive related magnesium, nickel and base metal mineralisation as well as gold.
Panther acquired 100% of the Dotted Lake Project in July 2020. An airborne magnetic and electromagnetic geophysical survey was flown in December 2020 followed by an extensive soil programmes conducted in 2021 and 2024 which identified numerous gold and base metal targets, all within the same geological footprint as Hemlo. Following the reopening of a historical trail providing direct access to the target location, an initial drilling programme in the autumn of 2021 confirmed the presence of gold mineralisation within this system with anomalous gold continuing along strike and present within the surrounding area. Dotted Lake sits upon 2.7-billion-year-old, Archaean age, rocks that form the north-eastern 'Dotted Lake Arm' of the Schreiber-Hemlo Greenstone Belt. Geology consists sequences of foliated, fine grained, dark green, amphibole rich metavolcanic rocks situated within an east-northeast trending isoclinal syncline. The metavolcanics have been intruded by granitoid rocks of the Dotted Lake Batholith in the southeast of the property whilst in the northeast an ultramafic intrusive complex flanks the two.

Figure 11: Location of the Dotted Lake Project, East of Thunder Bay, Ontario, Canada
The 2024 five-hole (1,559m) Phase 1 Diamond Drilling Programme returned 94.4 m up to 20.6% Mg in DL24-004 and 129 m at 14.4% Mg in DL24-003, extending the ultramafic intrusion over 2.8 km. DL24-002 gave 214.7 m open ended, up to 21.7% Mg, mineralised with Pt, Pd, Ni, Cr and Ag. The first hole confirmed a 1.2 km open-ended gold trend and high-grade zinc and gold VMS-style mineralisation.
On 23 February 2026, the Company announced an update for the project. The 2024 drilling confirmed the Dotted Lake ultramafic magmatic intrusive to be a magnesium (Mg) bearing serpentinised peridotite (serpentinite). As part of a series of investigations to evaluate the potential of the Dotted Lake Project, Panther reported it was to evaluate opportunities to recover magnesium from serpentine and is particularly interested in alternative extraction technologies capable of improving upon conventional leaching recoveries.
Panther submitted 134kg of crushed serpentinite drill core, selected from drillholes DL24-002 and DL24-004, for magnesium investigatory test work by Test Design Implement Solutions LLC ("TDI") one of the approved laboratories for testing of the Extrakt Process Solutions LLC ("Extrakt") technologies. The initial phase of work focussed on a high-level assessment of Mg recovery from serpentine using Extrakt's proprietary extraction technology. The objective is to generate baseline metal recovery and process performance data that will inform and support the design and optimisation of subsequent test phases.
The Company provided an update to the market on 17 August 2026 announcing that TDI had completed a preliminary (Phase 1) metallurgical investigation on serpentine-rich ultramafic material supplied by Panther to evaluate the applicability of the Extrakt leaching technology for magnesium extraction and to identify operating conditions capable of supporting future process development.
The Phase 1 recovery testwork successfully confirmed the Dotted Lake ultramafic intrusive as a magnesium-rich serpentine feedstock with elevated concentrations of chromium, nickel, cobalt, and other critical elements that will warrant further evaluation as potential by-products in future studies.
Phase 1 recovery tests reached approximately 38 weight % (wt.%) magnesium, significantly exceeding the silica passivation related recovery ceiling of 19-25 wt.% observed during conventional single-stage leaching. The work successfully generated a baseline metal recovery and process performance data that will inform and support the design and optimisation of subsequent test phases including a Reagent Management System ("RMS"). Recent TDI RMS testwork conducted on similar material demonstrated a magnesium concentration factor of at least 2×, providing an indication of the potential reduction in downstream processing requirements. Although the results are highly encouraging, they remain preliminary and require confirmation through additional metallurgical testing, mass balance verification, reproducibility studies, and techno-economic evaluation, including reagent management system optimisation.
The Company is currently working with TDI and Extrakt on further evaluation of the Phase 1 work which may lead into scoping Phase 2 of the project.
Corporate and Financial Highlights
Placings
On 9 February 2026, the Company announced that it has raised gross proceeds of £1,190,000 (before expenses) through a placing of 1,700,000 ordinary shares of no-par value at a price of 70 pence. The shares were admitted on 16 February 2026.
On 18 June 2026, the Company announced that it has raised gross proceeds of £2,500,000 through a placing of 1,851,852 ordinary shares of no-par value at a price of 135 pence. The shares were admitted on 24 June 2026.
Warrant Issues
During the course of June 2026, the Company was notified of the conversion of a total of 120,000 75p warrants raising £90,000. The warrants were issued as part of the January 2025 placing.
Post period end the Company was further notified of the conversion of a total of 440,000 75p warrants raising £330,000. The warrants were issued as part of the January 2025 placing.
Director Changes
On 1 April 2026, the Company announced the appointment of Donna Belen Humphries as Non-Executive Director of the Company and the resignation of Tracy Hughes as Non-Executive Director of the Company. Donna is the Chair of the Company's Remuneration Committee.
GM and AGM
On 31 March 2026, the Company announced that at its General Meeting of the Company, all resolutions were duly passed. On 23 June 2026, the Company announced the results of its AGM in which all of the resolutions were passed successfully.
Filing of Preliminary Non-Offering Prospectus
On 13 February 2026 the Company announced that it has filed a preliminary non-offering prospectus (the "Prospectus") with the Ontario Securities Commission (the "Commission") and has applied to the Canadian Securities Exchange (the "CSE") for a secondary listing of its ordinary shares on the CSE in Canada (the "Listing"). The Company's ordinary shares will continue to be listed on the official list of the UK Financial Conduct Authority and traded on the main market for listed securities of the London Stock Exchange PLC.
Final acceptance of the Prospectus and the Listing are subject to the review and approval of the Commission and the CSE, respectively. The Prospectus contains important information relating to the Company and its currently issued share capital and is subject to amendment as may be required by the Commission. The Prospectus will be available for review under Panther's profile on the Canadian System for Electronic Document Analysis and Retrieval ("SEDAR+") at www.sedarplus.ca. The Company currently anticipates that the Listing will take place in October 2026, but this is subject to the final acceptance process referred to above.
Option Agreements
Obonga Amendment with Broken Rock Resources
On 6 July 2026, the Company announced the extension of the agreement with Broken Rock Resources in relation to its option on Obonga. The extension moves the option expiry date from 31 August 2026 to 30 April 2027. The Company agreed to issue 30,000 new ordinary shares to Broken Rock Resources as consideration for extending the existing option agreement over the Obonga Greenstone Belt project.
On 14 September 2026, the Company announced the further extension of the agreement with Broken Rock Resources in relation to its option on Obonga. The extension moves the option expiry date from 30 April 2027 to 31 August 2027, providing the Company with additional time and flexibility to complete its exploration programme and satisfy the remaining terms of the agreement. The payment date of the CAD$250,000 (£135,825) due under the agreement is amended to no later than 31 August 2027. No further cash or shares consideration was issued to Broken Rock Resources in relation to this subsequent extension, but it was agreed that 25,000 share options with an exercise price of £1.70 and an expiry date of 31 August 2029 would be issued to Broken Rock.
Due Diligence Option Extension with First Quantum Minerals
On 26 June 2026, the Company made a payment of CAD$50,000 to continue the due diligence on the Winston Tailings Project until 15 June 2027. The Company may extend the Winston Due Diligence Period for a further 12 months twice (for a total maximum Winston Due Diligence Period of 48 months to 15 June 2029) by making payments of $50,000 (£27,090) per extension.
Siltamaki Option Agreement on Obonga
On 15 January 2026, the Company announced the signing of a three-year term purchase option agreement (the "Purchase Option") over three multicell mining claims (the "Properties" or "Claims") which comprise the Otter Gold, Z2 Gold and Wig properties at Obonga. The Purchase Option signed with Mrs Karen Siltamaki is a partial replacement for the purchase option agreement announced 22 November 2021 signed with her late spouse Mr Aki Siltamaki and secures Panther options over the Properties through to January 2029. The Purchase Option allows Panther the option to purchase the Claims for a total cash consideration of CAN$200,000 (£116,000) and the award of a 1.5% net smelter return ("NSR") royalty (with a provision for Panther to reduce the royalty to 1.0% NSR through a CAD$1,000,000 (£538,100) buy-back). The Purchase Option price was CAD$10,000 (£5,550) with further payments of CAD$10,000 (£5,550) due on each anniversary of the date of signing, for three consecutive years.
Financial Review
The Group has reported an unaudited comprehensive loss for the six months ended 30 June 2026 of £992,720 (six months ended 30 June 2025 - loss £926,545). The basic and diluted loss per share for the period was -10.6 pence (six months ended 30 June 2025 - basic and diluted loss of - 16.34 pence).
The key performance indicators are set out below:
|
|
At 30-Jun-26 |
At 30-Jun-25 |
At 31-Dec-25 |
|
|
(unaudited) |
(unaudited) |
(audited) |
|
|
£ |
£ |
£ |
|
|
|
|
|
|
Net asset value |
4,730,037 |
2,074,738 |
2,234,684 |
|
|
|
|
|
The Directors are required to provide an Interim Management Report in accordance with the Financial Conduct Authorities ("FCA") Disclosure Guidance and Transparency Rules ("DTR"). The Directors consider the Interim Management Report of this Half Yearly Financial Report provides details of the important events which have occurred during the period and their impact on the financial statements as well as the outlook for the Company for the remaining six months of the year ended 31 December 2025.
The following statement of the Principal Risks and Uncertainties, the Related Party Transactions, the Statement of Directors' Responsibilities and the Operational and Financial Review constitute the Interim Management Report of the Company for the six months ended 30 June 2026.
Principal Risks and Uncertainties
The principal risks and uncertainties of the Company are detailed on page 41 of the Company's most recent Annual Report for the year ended 31 December 2025 which can be found on the Company's website at www.panthermetals.co.uk. The principal risks and uncertainties facing the Company remain unchanged from those disclosed in the Annual Report for the year ended 31 December 2025, and the Board are of the opinion that they will continue to remain unchanged for the forthcoming six-month period.
The principal risks and uncertainties facing the Company are as follows:
• adverse foreign exchange fluctuations;
• if the Group is unable to raise additional capital when needed or on suitable terms it could force a delay, reduce or eliminate its exploration development and production plans and efforts; and
• there are significant risks associated with any discovery and the ability of the Company to then generate any operational cashflows.
Related Party Transactions
There have been no material changes to the related party transactions described in the Annual Report that could influence the financial position or performance of the Company.
Going Concern
As at 30 June 2026, the Group had total cash reserves of £1,384,083 (31 December 2025: £71,085). The Directors are aware of the reliance on fundraising within the next 12 months having reviewed the Group's working capital forecasts. Directors believe that the Group is well placed to manage its business risks successfully, providing future fundraisings are successful. The interim financial statements have been prepared on a going concern basis and do not include adjustments that would result if the Group was unable to continue in operation. As a junior exploration company, the Directors are aware that the Company must go to the marketplace to raise funds in the next 12 months to meet its investment and exploration plans and to maintain its listing status.
For and on behalf of the Board of Directors
Darren Hazelwood
Chief Executive Officer
25 September 2026
STATEMENT OF DIRECTORS' RESPONSIBILITY FOR THE HALF YEARLY REPORT FOR THE SIX MONTHS ENDED 30 JUNE 2026
The Directors confirm to the best of their knowledge:
· the interim financial statements have been prepared in accordance with International Accounting Standard 34, Interim Financial Reporting, as adopted by the EU;
· the interim financial statements give a true and fair view of the assets and liabilities, financial position and the loss of the Group;
· the interim report includes a fair review of the information required by DTR 4.2.7R of the Disclosure and Transparency Rules, being an indication of important events that have occurred during the first six months of the financial year and their impact on the interim financial information, and a fair description of the principal risks and uncertainties for the remaining six months of the year; and
· the interim financial information includes a fair review of the information required by DTR 4.2.8R of the Disclosure and Transparency Rules, being information required on related party transactions.
For and on behalf of the Board of Directors
Darren Hazelwood
Chief Executive Officer
25 September 2026
CONSOLIDATED CONDENSED STATEMENT OF COMPREHENSIVE INCOME FOR THE SIX MONTHS ENDED 30 JUNE 2026 AND 2025
|
|
Notes |
|
Six months ended 30 June 2026 £ |
Six months ended 30 June 2025 £ |
|
|
|
|
(unaudited) |
(unaudited) |
|
Revenue |
|
|
- |
- |
|
Cost of sales |
|
|
- |
- |
|
|
|
|
|
|
|
|
|
|
|
|
|
Gross profit |
|
|
- |
- |
|
|
|
|
|
|
|
Administrative expenses |
|
|
(835,506) |
(408,643) |
|
Share-based payment charge |
8 |
|
(54,951) |
(47,597) |
|
Realised and unrealised loss on financial assets held at fair value through profit or loss |
|
|
- |
(365,738) |
|
|
|
|
|
|
|
Operating loss |
|
|
(890,457) |
(821,978) |
|
|
|
|
|
|
|
Finance costs |
|
|
- |
(9,190) |
|
|
|
|
, |
, |
|
Loss before taxation |
|
|
(890.457) |
(831,168) |
|
|
|
|
|
|
|
Taxation |
|
|
- |
- |
|
|
|
|
|
|
|
Loss for the period |
|
|
(890,457) |
(831,168) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Other comprehensive loss |
|
|
|
|
|
Loss for the period |
|
|
(890,457) |
(831,168) |
|
Items which may be reclassified to profit or loss: |
|
|
|
|
|
Exchange difference on currency translations |
|
|
(102,263) |
(85,377) |
|
|
|
|
|
|
|
Total comprehensive loss for the period |
|
|
(992,720) |
(916,545) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Loss for the period attributable to: |
|
|
|
|
|
Equity holders of the Company |
|
|
(992,720) |
(916,545) |
|
Non-controlling interest |
|
|
- |
- |
|
Total comprehensive loss for the period attributable to: |
|
|
|
|
|
Equity holders of the Company |
|
|
(992,720) |
(916,545) |
|
Non-controlling interest |
|
|
- |
- |
|
|
|
|
|
|
|
Earnings per share attributable to owners of the Company |
|
|
|
|
|
Basic loss per share (pence) |
2 |
|
(10.60)p |
(16.34)p |
|
Diluted loss per share (pence) |
2 |
|
(10.60)p |
(16.34)p |
|
|
|
|
|
|
All operations relate to continuing activities.
CONSOLIDATED CONDENSED STATEMENT OF FINANCIAL POSITION AS AT 30 JUNE 2026 AND 31 DECEMBER 2025
|
|
Notes |
|
As at 30 June 2026 £
|
As at 31 December 2025 £
|
|
|
|
|
(unaudited) |
(audited) |
|
Non-current assets |
|
|
|
|
|
Exploration and evaluation assets |
4 |
|
3,627,950 |
2,405,435 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total non-current assets |
|
|
3,627,950 |
2,405,435 |
|
|
|
|
|
|
|
Current assets |
|
|
|
|
|
Receivables |
5 |
|
558,767 |
151,026 |
|
Cash at bank and in hand |
|
|
1,384,083 |
71,085 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total current assets |
|
|
1,942,850 |
222,111 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total assets |
|
|
5,570,800 |
2,627,546 |
|
|
|
|
|
|
|
Current liabilities |
|
|
|
|
|
Trade and other payables |
6 |
|
(831,233) |
(392,862) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Current Liabilities |
|
|
(831,233) |
(392,862) |
|
|
|
|
|
|
|
Net current assets/(liabilities) |
|
|
1,111,617 |
(170,751) |
|
|
|
|
|
|
|
Non-current liabilities |
|
|
|
|
|
Deferred consideration payable |
7 |
|
(9,530) |
- |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total liabilities |
|
|
(840,763) |
(392,862) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Net assets |
|
|
4,730,037 |
2,234,684 |
|
|
|
|
|
|
|
Capital and reserves |
|
|
|
|
|
Called up share capital |
8 |
|
11,786,340 |
8,353,218 |
|
Share-based payment reserve |
9 |
|
342,456 |
287,505 |
|
Foreign Exchange reserve |
|
|
(313,907) |
(211,644) |
|
Retained losses |
|
|
(7,084,852) |
(6,194,395) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Total equity |
|
|
4,730,037 |
2,234,684 |
|
|
|
|
|
|
CONSOLIDATED CONDENSED STATEMENT OF CASH FLOWS FOR THE SIX MONTHS ENDED 30 JUNE 2026 AND 30 JUNE 2025
|
|
Notes |
|
Six months ended 30 June 2026 £ |
Six months ended 30 June 2025 £ |
|
|
|
|
(unaudited) |
(unaudited) |
|
Cash flows from operating activities |
|
|
|
|
|
Operating Loss |
|
|
(890,457) |
(821,978) |
|
Adjusted for: |
|
|
|
|
|
Share-based payment charge |
9 |
|
54,951 |
47,597 |
|
Realised and unrealised loss on financial assets held at fair value through profit and loss |
|
|
- |
365,738 |
|
Foreign exchange |
|
|
(285) |
(5,518) |
|
(Increase)/ Decrease in receivables |
5 |
|
(407,741) |
63,094 |
|
Increase/ (Decrease) in payables |
6 |
|
403,627 |
(296,587) |
|
|
|
|
|
|
|
Net cash used in operating activities |
|
|
(839,905) |
(647,654) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Investing activities |
|
|
|
|
|
Cash spent on exploration activities |
4 |
|
(1,270,220) |
(223,767) |
|
Proceeds from the sale of financial assets held at fair value through profit and loss |
|
|
- |
266,879 |
|
Purchase of Bitcoin |
|
|
- |
(52,010) |
|
|
|
|
|
|
|
Net cash used in investing activities |
|
|
(1,270,220) |
(8,898) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Financing activities |
|
|
|
|
|
Grant received from Ontario Junior Exploration Programme |
4 |
|
- |
31,159 |
|
Proceeds from issuing shares (net of issue costs) |
8 |
|
3,333,123 |
555,150 |
|
Proceeds from exercise of warrants |
8 |
|
90,000 |
80,000 |
|
|
|
|
|
|
|
Net cash generated from financing activities |
|
|
3,423,123 |
666,309 |
|
|
|
|
|
|
|
Net increase in cash and cash equivalents |
|
|
1,312,998 |
9,757 |
|
|
|
|
|
|
|
Cash and cash equivalents at beginning of period |
|
|
71,085 |
17,536 |
|
|
|
|
|
|
|
Cash and cash equivalents at end of period |
|
|
1,384,083 |
27,293 |
|
|
|
|
|
|
CONSOLIDATED CONDENSED STATEMENT OF CHANGES IN EQUITY FOR THE SIX MONTHS ENDED 30 JUNE 2026 AND 30 JUNE 2025
|
|
Note |
Share capital £ |
Share based payment reserve £ |
FX reserve £ |
Retained losses £ |
Total Equity attributable to the owners of the Company £ |
|
Balance at 1 January 2025 (restated) |
|
6,914,491 |
469,975 |
(144,274) |
(5,128,996) |
2,111,196 |
|
|
|
|
|
|
|
|
|
Loss for the period |
|
- |
- |
- |
(831,168) |
(831,167) |
|
Unrealised foreign exchange losses from retranslation of foreign operations |
|
- |
- |
(85,377) |
- |
(85,377) |
|
|
|
|
|
|
|
|
|
Total comprehensive loss for the period |
|
- |
- |
(85,377) |
(831,168) |
(916,545) |
|
|
|
|
|
|
|
|
|
Equity Transactions with owners |
|
|
|
|
|
|
|
Issue of equity via placing |
8 |
455,000 |
- |
- |
- |
455,000 |
|
Share issue costs |
8 |
(31,850) |
- |
- |
- |
(31,850) |
|
Conversion of convertible loan notes |
8 |
181,124 |
- |
- |
- |
181,124 |
|
Issue of equity to option holder |
8 |
16,216 |
- |
- |
- |
16,216 |
|
Director subscriptions |
8 |
132,000 |
- |
- |
- |
132,000 |
|
Exercise of warrants |
8 |
80,000 |
- |
- |
- |
80,000 |
|
Options issued |
9 |
- |
47,597 |
- |
- |
47,597 |
|
|
|
|
|
|
|
|
|
Total transactions with owners |
|
832,490 |
47,597 |
-
|
- |
880,087 |
|
|
|
|
|
|
|
|
|
Balance at 30 June 2025 |
|
7,746,981 |
517,572 |
(229,652) |
(5,960,163) |
2,074,738 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Balance at 1 January 2026 |
|
8,353,218 |
287,505 |
(211,644) |
(6,194,395) |
2,234,684 |
|
|
|
|
|
|
|
|
|
Loss for the period |
|
- |
- |
- |
(890,457) |
(890,457) |
|
Unrealised foreign exchange losses on retranslation of foreign operations |
|
- |
- |
(102,263) |
- |
(102,263) |
|
|
|
|
|
|
|
|
|
Total comprehensive loss for the period |
|
- |
- |
(102,263) |
(890,457) |
(992,720) |
|
|
|
|
|
|
|
|
|
Equity Transactions with owners |
|
|
|
|
|
|
|
Issues of equity via placing |
8 |
3,690,000 |
- |
- |
- |
3,690,000 |
|
Share issue costs |
8 |
(356,878) |
- |
- |
- |
(356,878) |
|
Exercise of warrants |
8 |
90,000 |
- |
- |
- |
90,000 |
|
Issue of shares to a consultant |
8 |
10,000 |
- |
- |
- |
10,000 |
|
Options issued |
9 |
- |
54,951 |
- |
- |
54,951 |
|
|
|
|
|
|
|
|
|
Total transactions with owners |
|
3,433,122 |
54,951 |
- |
- |
3,488,073 |
|
|
|
|
|
|
|
|
|
Balance at 30 June 2026 |
|
11,786,340 |
342,456 |
(313,907) |
(7,084,852) |
4,730,037 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 Accounting policies
1.1. Interim report
This interim financial information for the six months ended 30 June 2026 and 30 June 2025 is unaudited and does not constitute statutory financial statements within the meaning of the Companies Act 2006 (Isle of Man). The interim financial information was approved by the Board of Directors on 21 September 2026. The condensed interim financial statements have been reviewed by the Company's auditor.
1.2. Basis of accounting
The condensed interim financial information has been prepared in accordance with the requirements of IAS 34 "Interim Financial Reporting".
The interim financial information does not include all notes of the type normally included in the annual financial report and therefore cannot be expected to provide as full an understanding of the financial performance, financial position and financing and investing activities of the group as the full financial report.
The financial information has been prepared on the historical cost basis. The accounting policies and methods of computation adopted in the Company's preparation of the condensed interim financial information are consistent with those adopted and disclosed in the audited financial statements for the year ended 31 December 2025 and those expected to be used for the year ending 31 December 2026. The Company will report again in full for the year ending 31 December 2026.
1.3. Accounting policies
The accounting policies are unchanged from those used in the last published annual financial statements for the year ended 31 December 2025, which are prepared in accordance with UK-adopted International Accounting Standards. Critical accounting judgements and key sources of estimation uncertainty are consistent with those disclosed in the audited financial statements for the year ended 31 December 2025 which can be found in the Financial Reports section of the Company's website. Refer to note 18 of those financial statements for the year ended 31 December 2025 for the restatement of the financial statements for the year ended 31 December 2024 which has been reflected in the opening position as at 1 January 2025 and in the income statement for the period ended 30 June 2025.
1.4. Going concern
The Company successfully issued equity of £1,110,570, converted warrants of £80,000 and received director subscriptions of £132,000 in the year ended 31 December 2025.
On 9 February 2026, the Company announced that it had raised gross proceeds of £1,190,000 (before expenses) through a placing of 1,700,000 ordinary shares of no-par value at a price of 70 pence (the "Placing Price"). The Placing, which received substantial backing from new and existing institutional investors and existing shareholders of the Company, was significantly oversubscribed and subject to scale back. The shares were admitted on 16 February 2026.
On 18 June 2026, the Company announced that it has raised gross proceeds of £2,500,000 (before expenses) through a placing of 1,851,852 ordinary shares of no-par value at a price of 135 pence. The shares were admitted on 24 June 2026.
As at the period-end date the Group had total cash reserves of £1,384,043 (31 December 2025: £71,085).
As a junior exploration company, the Directors are aware that the Company must seek funds from the market in the next 12 months to meet its investment and exploration plans and to maintain its listing status. The requirement for a successful fundraising presents a material uncertainty that may cast doubt on the Group's ability to continue to operate as planned and to pay its liabilities as they fall due for a period not less than twelve months from the date of this report.
The Directors are aware of the reliance on fundraising within the next 12 months and therefore consider that a material uncertainty exists as to the Company's ability to continue as a going concern. Having reviewed the Group's working capital forecasts, they believe the Group is well placed to manage its business risks successfully providing the fundraising is successful. The financial statements have been prepared on a going concern basis and do not include adjustments that would result if the Group were unable to continue in operation.
2 Loss per share
The basic loss per ordinary share in the table below has been calculated by dividing the loss for the period by the weighted average number of ordinary shares in issue. There are potentially issuable shares in the table below, all of which relate to share options issued to Directors, options issued as part of acquisitions and warrants issued as part of placings.
Based on the losses made in the period, the diluted loss per share is anti-dilutive and therefore has been kept the same as the basic loss per share.
|
|
Six months ended 30 June 2026
|
Six months ended 30 June 2025
|
Year ended 31 December 2025
|
|
|
|
|
|
|
Weighted average number of ordinary shares in issue |
8,395,243 |
5,087,019 |
5,676,718 |
|
Potentially issuable shares |
4,990,917 |
4,826,492 |
3,990,917 |
|
Total weighted average number of potential ordinary shares in issue |
13,386,160 |
9,913,511 |
9,667,635 |
|
Loss attributable to the equity holders of the parent company |
£(890,457) |
£(831,168) |
£(1,343,063) |
|
|
|
|
|
|
Basic (loss) per share (pence) |
(10.60)p |
(16.34)p |
(23.66)p |
|
Diluted (loss) per share (pence) |
(10.60)p |
(16.34)p |
(23.66)p |
|
|
|
|
|
3 Segmental information
Geographical segments
The Group's assets and liabilities and losses are split by geographic location in the table below.
|
As at 30 June 2026 |
|
|||||
|
|
|
|
Canada |
Isle of Man |
Group |
|
|
|
|
|
£ |
£ |
£ |
|
|
Total assets |
|
|
4,232,270 |
5,704,266 |
5,570,800 |
|
|
|
|
|
|
|
|
|
|
Total liabilities |
|
|
(4,611,890) |
(519,512) |
(840,763) |
|
|
|
|
|
|
|
|
|
|
Net (liabilities)/assets |
|
|
(379,620) |
5,184,754 |
4,730,037 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Loss before tax from continuing operations |
|
|
(34,470) |
(849,185) |
(890,457) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
As at 31 December 2025 |
|
|||||
|
|
|
|
Canada |
Isle of Man |
Group |
|
|
|
|
|
£ |
£ |
£ |
|
|
Total assets |
|
|
2,489,122 |
2,940,347 |
2,627,546 |
|
|
|
|
|
|
|
|
|
|
Total liabilities |
|
|
(2,841,097) |
(389,185) |
(392,862) |
|
|
|
|
|
|
|
|
|
|
Net (liabilities)/assets |
|
|
(351,975) |
2,551,162 |
2,234,684 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Loss before tax from continuing operations |
|
|
(127,435) |
(1,215,628) |
(1,343,063) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The Chief Operating Decision Maker is Darren Hazelwood, the CEO. The Group identifies its reportable segments based on the activity undertaken, exploration in Canada and PLC management in the Isle of Man. The reportable segments are identical to the entity financial statements with no reconciling items. The Group is comprised of Panther Metals PLC which is registered in the Isle of Man but is managed and controlled in the UK from its Hitchin office. Panther Metals PLC has two subsidiary companies which are both wholly owned:
· Panther Metals (Canada) Limited an exploration company with registered address of Suite 530, 355 Burrard Street, Vancouver, V6C 2G8, Canada. This company made a loss of £34,470 in the period ended 30 June 2026 (31 December 2025- loss of £127,435); and
· Lonnus (m) Sdn Bhd a dormant company registered in Malaysia which makes no profit or loss.
4 Exploration and evaluation assets
|
Group |
Panther Canada |
Panther PLC |
Total |
|
|
£ |
£ |
£ |
|
Net book value |
|
|
|
|
|
|
|
|
|
At 1 January 2025 |
2,262,286 |
19,440 |
2,281,726 |
|
|
|
|
|
|
Additions |
336,915 |
- |
336,915 |
|
Grant received from Ontario Junior Exploration Programme |
(30,985) |
|
(30,985) |
|
Termination of Frontier Energy Agreement- Winston |
(106,516) |
- |
(106,516) |
|
Foreign exchange |
(56,265) |
- |
(56,265) |
|
Write off of PLC exploration assets and equipment |
- |
(19,440) |
(19,440) |
|
|
|
|
|
|
At 31 December 2025 and 1 January 2026 |
2,405,435 |
- |
2,405,435 |
|
|
|
|
|
|
Additions |
1,270,220 |
- |
1,270,220 |
|
Foreign exchange |
(47,705) |
- |
(47,705) |
|
|
|
|
|
|
At 30 June 2026 |
3,627,950 |
- |
3,627,950 |
|
|
|
|
|
Canada- Winston Project
On June 16, 2025, the Company entered into an option agreement with First Quantum for the option to purchase all right, title and interest in, the Winston Lake Mine and patented land leases. The agreement includes an initial 12-month due diligence period during which the Company has the legal right to conduct agreed exploration work at the Winston Lake Mine in return for a $100,000 (£54,180) payment to First Quantum. The Company may extend the Winston Due Diligence Period for a further 12 months up to three times (for a total maximum Winston Due Diligence Period of 48 months) by making payments of $50,000 (£27,090) per extension.
The Company also entered a Sale and Purchase Agreement with Frontier Energy for the Pick Lake Mining Ltd Property with an Option Period running to 15 October 2025. An initial payment of 100,000 Australian dollars (A$) (£56,200) was made in relation to the option with payments of A$30,000 (£16,860) per month payable on the first business day in each month thereafter and ending on 15th October 2025. On 30 October 2025, the Company announced that it had terminated the agreement with Frontier Energy in relation to the option on Pick Lake and these payments amounting to £106,516 were written off.
During the year ended 31 December 2025, expenditure on the project amounted to £172,416 (prior to the write off of the £106,516 in relation to Frontier Energy noted above) and related to the agreements above and geological consultancy.
During the period ended 30 June 2026, Panther primarily focussed on the Winston Project and conducted a winter drilling programme on the tailings lake, incurring drilling costs of £361,581 and geological services costs of £137,287. The core which was extracted as part of the programme was sent for processing the costs of which amounted to £42,914 in the period.
The assay results from the drilling at the Winston Tailings Project were announced in batches on 17 March 2026, 19 March 2026, 14 April 2026, 28 April 2026, 11 May 2026 and 13 May 2026. All results showed good grade consistency across the vertical depth-profile and laterally between Vibracore hole collar locations, and support or exceed the 2025 preliminary assay results announced on 31 July 2025.
Canada- Obonga Greenstone Belt Project
During the year ended 31 December 2025, expenditure on the project amounted to £97,307 and related to the extension of the agreement, helicopter surveys, sampling and sample housing costs and geological consultancy.
In relation to the Obonga project, Panther entered into a license agreement with Karen Siltamaki in the period ended 30 June 2026, details of which are in note 7. In addition, Panther increased its insurance coverage on the project costing £8,235, paid £2,430 for trail planning and continued to maintain its warehouse facilities in Thunder Bay at a cost of £16,770.
On 6 May 2026, the Company announced that it has was preparing the drill pads for the drilling at Obonga at the Awkward Conduit Target and Wishbone VMS Prospect.
Drilling commenced at Awkward on 26 May 2026 with the Company announcing on 2 June 2026 that the drilling has intersected broad intervals of disseminated and veined sulphides hosted within a varitextured gabbroic mafic-ultramafic intrusive system, interpreted to be within a potential magma conduit environment. Portable XRF readings from sulphide-rich intervals returned elevated anomalous nickel and cobalt values, with sulphides visually dominated by pyrrhotite. The first drill hole (BR26-AW-P1-1) has successfully completed to plan, attaining a vertical depth of 401m and intersecting the targeted intrusive. The drill core is currently being processed ahead of samples being submitted for laboratory analysis.
The drill was moved to the Wishbone target and drilling commenced on 11 June 2026 with the first of a series of planned holes, the first hole being a 300m deep inclined hole designed to test the VMS mineralisation strike extension approximately 500m to the north of previous wide VMS intersections.
The drill programme for the period to 30 June 2026 amounted to £649,948 which included mobilisation to site, team transportation costs, drilling costs, geological services costs in relation to the programme and accommodation costs for the drilling team and geologists on the project. The drill programme figure also includes £64,127 of trail building costs.
Canada- Dotted Lake Project
During the year ended 31 December 2025, expenditure on the project amounted to £67,162 and related to sampling costs and geological consultancy. A grant of £30,985 was received from the Ontario Junior Exploration Programme in relation to the soil sampling programme which took place in Autumn 2024 and this has been offset against the expenditure in accordance with IAS 20 Accounting for Government Grants and Disclosure of Government Assistance.
In the period ended 30 June 2026 the Company incurred £30,764 on the Dotted Lake project in relation to core analysis costs.
Panther Metals PLC
The Company directly held a small amount of exploration and evaluation assets and equipment in projects in Queensland and Mauritania amounting to £19,440. These costs were written off in December 2025.
5 Receivables
|
|
|
As at 30 June 2026 £ |
As at 31 December 2025 £ |
|
Amounts falling due within one period |
|
|
|
|
Prepayments |
|
33,782 |
41,227 |
|
Other receivables |
|
524,985 |
109,799 |
|
|
|
|
|
|
|
|
|
|
|
|
|
558,767 |
151,026 |
|
|
|
|
|
|
|
|
|
|
Included in other receivables are £244,398 (31 December 2025: £67,725) of deposit payments made to contractors for the Obonga project.
6 Trade and Other Payables
|
|
|
As at 30 June 2026 £ |
As at 31 December 2025 £ |
|
|
|
|
|
|
Trade payables |
|
169,695 |
53,673 |
|
Accruals |
|
512,510 |
62,925 |
|
Deferred consideration (note 7) |
|
143,889 |
135,450 |
|
Amounts due to related parties |
|
- |
134,986 |
|
Other payables |
|
5,139 |
5,828 |
|
|
|
|
|
|
|
|
831,233 |
392,862 |
|
|
|
|
|
|
|
|
|
|
Trade payables increased as at 30 June 2026 due to the timing of exploration projects. At the end of 2025, the Group was between work programmes, whereas as at 30 June 2026 the Group was still conducting work at Obonga. Accruals also increased in the period due to accrued project expenditure at the end of June combined with increased levels of legal and professional fee accruals.
Amounts due to related parties as at 31 December 2025 relates to £100,000 due to Darren Hazelwood, and £34,986 due to Mining Analyst Consulting Limited (the consultancy company of Nicholas O'Reilly and Katherine O'Reilly). These were settled in the period ended 30 June 2026.
7. Deferred Consideration Payable
|
|
|
As at 30 June 2026 £ |
As at 31 December 2025 £ |
|
Current Liabilities payable within 1 year |
|
|
|
|
Amount due to Broken Rock |
|
138,494 |
135,450 |
|
Amount due to Karen Siltamaki |
|
5,395 |
- |
|
|
|
|
|
|
|
|
|
|
|
|
|
143,889 |
135,450 |
|
|
|
|
|
|
|
|
|
|
|
Non-Current Liabilities |
|
|
|
|
Amounts due to Karen Siltamaki |
|
9,530 |
- |
|
|
|
|
|
|
|
|
|
|
|
|
|
153,419 |
135,450 |
|
|
|
|
|
On 3 April 2025, the Company announced the amendment and extension to the purchase agreement allowing for an additional year to meet the exploration commitment at Obonga CAD $250,000 (£138,494) being due to Broken Rock on 29 September 2026. On 6 July 2026, the Company announced the extension of the agreement with Broken Rock Resources in relation to its option on Obonga. The extension moves the option expiry date from 31 August 2026 to 30 April 2027. On 14 September 2026, the Company announced the further extension of the agreement with Broken Rock Resources in relation to its option on Obonga. The extension moves the option expiry date from 30 April 2027 to 31 August 2027.
On 15 January 2026, the Company signed a three-year term purchase option agreement over three multicell mining claims which comprise the Otter Gold, Z2 Gold and Wig properties at Obonga. The Purchase Option signed with Mrs Karen Siltamaki is a partial replacement for the purchase option agreement announced 22 November 2021 signed with her late spouse Mr Aki Siltamaki and secures Panther options over the Properties through to January 2029. The Purchase Option allows Panther the option to purchase the claims for a total cash consideration of CAD$200,000 (£107,900) and the award of a 1.5% net smelter return ("NSR") royalty (with a provision for Panther to reduce the royalty to 1.0% NSR through a CAD$1,000,000 (£539,500) buy-back). The option price was CAD$10,000 (£5,395) with further payments of CAD$10,000 (£5,395) due on each anniversary of the date of signing, for three consecutive years.
A deferred consideration liability has been recognised and there are no conditions attached to these payments. The amounts payable over time have been discounted to present value. Each period the liability is increased by the interest rate used in the discounting calculation with subsequent increases expensed to finance costs.
Payments to Karen Siltamaki of CAD $10,000 (£5,395) have been made in the period to 30 June 2026 (2025: CAD £nil). No payments were made to Broken Rock in the period (period to 31 December 2025: CAD $30,000 (£16,158)).
8 Share capital
|
|
Number of new Ordinary shares |
Share Capital |
Issue Costs |
Share Capital net of issue costs |
|
|
No. |
£ |
£ |
£ |
|
Authorised Share Capital |
|
|
|
|
|
Ordinary Shares |
Unlimited |
|
|
|
|
|
|
|
|
|
|
Allotted, issued and fully paid ordinary shares of £1: |
|
|
|
|
|
|
|
|
|
|
|
As at 1 January 2025 |
4,279,080 |
6,944,340 |
(29,849) |
6,914,491 |
|
|
|
|
|
|
|
Placing- January 2025 |
910,000 |
455,000 |
(31,850) |
423,150 |
|
Capitalisation of debt facility- March 2025 |
362,250 |
181,126 |
- |
181,126 |
|
Obonga extension consideration shares- April 2025 |
42,070 |
16,216 |
- |
16,216 |
|
Warrant Exercise- June 2025 |
106,666 |
80,000 |
- |
80,000 |
|
Director Subscription- June 2025 |
191,304 |
132,000 |
- |
132,000 |
|
Placing- October 2025 |
1,000,000 |
600,000 |
(46,000) |
554,000 |
|
WRAP retail offer- October 2025 |
92,616 |
55,570 |
(3,335) |
52,235 |
|
|
|
|
|
|
|
As at 31 December 2025 and as at 1 January 2026 |
6,983,986 |
8,464,252 |
(111,034) |
8,353,218 |
|
|
|
|
|
|
|
Placing- February 2026 |
1,700,000 |
1,190,000 |
(116,521) |
1,073,479 |
|
Issue of shares to consultant- April 2026 |
16,000 |
10,000 |
- |
10,000 |
|
Warrant Exercise- June 2026 |
120,000 |
90,000 |
- |
90,000 |
|
Placing - June 2026 |
1,851,852 |
2,500,000 |
(240,357) |
2,259,643 |
|
|
|
|
|
|
|
As at 30 June 2026 |
10,671,838 |
12,254,252 |
(467,912) |
11,786,340 |
|
|
|
|
|
|
|
|
|
|
|
|
The Company's Articles of Association approved on 31 March 2026 do not impose any limit on the number of Ordinary Shares that the Company is authorised to issue. All unissued shares are at the disposal of the Board, subject to the provisions of the Articles of Association and any resolution of the Company. The ability of the Directors to allot and issue Ordinary Shares is subject to the terms of any special resolution passed by Shareholders, which may include the disapplication of pre-emption rights pursuant to Article 4.2 of the Articles.
On 20 January 2025, the Company announced the completion of a conditional placing, confirming it has placed 910,000 ordinary shares of no-par value at a price of 50 pence raising gross proceeds of £455,000. Each share was issued with one warrant attached entitling the holder to subscribe for one new ordinary share at a price of 75 pence. The warrants have a life of 36 months from the date of Admission. Admission took place on 28 February 2025. The directly attributable costs associated with the placing amounted to £31,850.
On 12 March 2025, the Company announced it had agreed terms to capitalise its only outstanding debt facilities, comprising the £150,000 of unsecured convertible loan notes announced 20 November 2023, which carry an interest rate of 15%. The Company settled this liability by the issue of new ordinary shares with warrants attached, a combined total of 362,250 shares at an issue price 50p and delivered 362,250 warrants with an exercise price of 75p to the former holders of the loan notes. The warrants have a life of 3 years and be subject to an "accelerator" requiring the warrants to be exercised should the Panther share price exceed £1.50 at any time over a period of 20 trading days following the date of the issue of the warrants.
On 3 April 2025 the Company announced an Amending Agreement on the Obonga project extending the existing agreement for a further 12 months and meaning that the exploration commitment is now spread over five years; whilst the original net smelter return royalty is replaced with a gross revenue royalty equal to 1.5% of the gross value of the sale proceeds actually received by the royalty payer from activity carried out on the Property. In connection with the signing of the Amending Agreement the Company allotted and issued 42,070 new ordinary shares with a value of Canadian $30,000 (£16,158) to Broken Rock based on the mid-market closing price of Panther's ordinary shares on 27 March 2025 and an exchange rate of CAD$1.85 to £1.00.
On 24 June 2025, the Company announced it had received notice of exercise of a total of 106,666 warrants with an exercise price of 75p per share, raising £80,000 for the Company. Admission took place on 30 June 2025.
On 30 June 2025, the Company announced that Executive Chairman, Nicholas O'Reilly, and Chief Executive Officer, Darren Hazelwood, had undertaken a direct share subscription with the Company for a total of £132,000 at the market mid-price of 69p. Mr Hazelwood subscribed for a total of 155,072 new shares for a consideration of £107,000, taking his and Mrs Hazelwood's total holding to 7.32% of the issued share capital in the Company. Mr O'Reilly subscribed for a total of 36,232 new shares for a consideration of £25,000, taking his total holding to 113,305 Ordinary Shares equivalent to 1.92% of the issued share capital in the Company.
On 28 October 2025, the Company announced that it had raised gross proceeds of £600,000 before expenses via a placing of 1,000,000 ordinary shares at a price of 60p per share. Admission took place on 31 October 2025. On 30 October 2025, the Company announced it had raised gross proceeds of £55,570 in a WRAP retail offer of 92,616 ordinary shares at a price of 60p per share. Admission took place on 31 October 2025. The directly attributable placing costs amounted to £49,334.
On 9 February 2026, the Company announced that it had raised gross proceeds of £1,190,000 (before expenses) through a placing of 1,700,000 ordinary shares of no-par value at a price of 70 pence. The shares were admitted on 16 February 2026. The directly attributable costs associated with the placing amounted to £116,521.
On 2 April 2026, the Company announced that it had issued 16,000 ordinary shares of 62.5p to a Bitcoin consultant. The shares were admitted on 10 April 2026.
During the course of June 2026, the Company was notified of the conversion of a total of 120,000 75p warrants raising £90,000. The warrants were issued as part of the January 2025 placing.
On 18 June 2026, the Company announced that it has raised gross proceeds of £2,500,000 (before expenses) through a placing of 1,851,852 ordinary shares of no-par value at a price of 135 pence. The shares were admitted on 24 June 2026. Costs of £240,357 were incurred in connection with the placing.
9 Share based payment transactions- Equity settled share-based payments
Options and warrants issued, cancelled and outstanding at the period end
|
|
At 1 January 2026
|
|
|
|
At 30 June 2026 |
|
|
No of options |
Issued |
Exercised |
Expired |
No of options |
|
Obonga options issued to Broken Rock- August 2021 |
20,000 |
- |
- |
- |
20,000 |
|
Management options- August 2021 |
184,000 |
- |
- |
- |
184,000 |
|
Management Options- November 2023 |
48,000 |
- |
- |
- |
48,000 |
|
Placing warrants- May 2024 |
333,333 |
- |
- |
- |
333,333 |
|
Placing warrants- January 2025 |
803,334 |
- |
(120,000) |
- |
683,334 |
|
Debt capitalisation warrants March 2025 |
362,250 |
- |
- |
- |
362,250 |
|
Growth Reward Scheme- November 2024 |
2,240,000 |
- |
- |
- |
2,240,000 |
|
Growth Reward Scheme- March 2026 |
|
1,120,000 |
- |
- |
1,120,000 |
|
|
|
|
|
|
|
|
|
3,990,917 |
1,120,000 |
(120,000) |
- |
4,990,917 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
During the course of June 2026, the Company was notified of the conversion of a total of 120,000 75p warrants raising £90,000. The warrants were issued as part of the January 2025 placing.
Options and warrants outstanding and exercisable as at 30 June 2026
|
|
Vested and exercisable |
Exercise price (£) |
Weighted average contractual life |
Expiry date |
|
Options under IFRS 2 |
|
|
(years) |
|
|
Obonga options- August 2021 |
20,000 |
3.25 |
0.34 |
2 August 2026 (see note 10) |
|
Management options- August 2021 |
184,000 |
3.75 |
0.39 |
22 August 2026 |
|
Management Options- November 2023 |
48,000 |
1.50 |
2.59 |
1 November 2028 |
|
Growth Reward Scheme- November 2024 |
2,240,000 |
1.375 |
8.59 |
1 November 2034 |
|
Growth Reward Scheme- March 2026 |
1,120,000 |
1.375 |
10.00 |
31 March 2036 |
|
|
|
|
|
|
|
Warrants outside the scope of IFRS 2 |
|
|
|
|
|
Placing warrants- May 2024 |
333,333 |
1.88 |
1.15 |
23 May 2027 |
|
Placing warrants- January 2025 |
683,334 |
0.75 |
1.92 |
28 February 2028 |
|
Debt capitalisation warrants- March 2025 |
362,250 |
0.75 |
2.03 |
12 March 2028 |
|
|
|
|
|
|
Growth Reward Scheme
The Growth Reward Scheme is a long-term incentive scheme put in place in November 2024 for Darren Hazelwood and Nicholas O'Reilly offering options and a cash bonus if certain market capitalisation milestones are reached, such awards requiring to be approved by the Remuneration Committee prior to being exercised. On 31 March 2026 Katherine O'Reilly was invited to participate in the Growth Reward Scheme. The following table sets out the total cumulative options granted to Darren Hazelwood, Nicholas O'Reilly and Katherine O'Reilly collectively.
|
Market Capitalisation (£M) |
Number of £1.375 Options |
Cash Bonus (£M) |
|
30 |
240,000 |
- |
|
50 |
240,000 |
- |
|
100 |
480,000 |
3 |
|
150 |
240,000 |
- |
|
250 |
480,000 |
6 |
|
400 |
240,000 |
- |
|
500 |
480,000 |
30 |
|
650 |
240,000 |
- |
|
800 |
240,000 |
- |
|
1,000 |
480,000 |
75 |
|
Total |
3,360,000 |
114 |
Growth Reward Scheme November 2024
As the vesting conditions for the options granted in November 2024 were based on market conditions, the Monte Carlo valuation model has been used to determine the vesting period and probability of the vesting conditions to provide a fair value based off the results calculated by the model. The fair value recognised at grant date was £143,885 which is to be charged over the three-year vesting period. The options lapse after ten years but the assumed exercise date is 3 May 2031. Other inputs to the Monte Carlo model are the exercise price of £1.375, the risk-free rate of 4.25% and the volatility of 82%.
Growth Reward Scheme March 2026
As the vesting conditions for the options granted in March 2026 were based on market conditions, the Monte Carlo valuation model has been used to determine the vesting period and probability of the vesting conditions to provide a fair value based off the results calculated by the model. The fair value recognised at grant date was £88,241 which is to be charged over the three-year vesting period. The options lapse after ten years but the assumed exercise date is 19 September 2032. Other inputs to the Monte Carlo model are the exercise price of £1.375, the risk-free rate of 4.35% and the volatility of 83%.
Management Options
A Black-Scholes model has been used to determine the fair value of the share options on the date of grant. The model assesses several factors in calculating the fair value. These include the market price on the date of grant, the exercise price of the share options, the expected share price volatility of the Company's share price based on the historical volatility of the share price, the expected life of the options, the risk-free rate of interest and the expected level of dividends in future periods.
|
Date of grant |
Risk free rate |
Share price volatility |
Expected life |
Share price at grant date |
|
|
|
|
|
|
|
Obonga options- August 2021 |
0.66% |
55% |
5 years |
0.1363 |
|
Management options- August 2021 |
0.77% |
55% |
5 years |
0.1175 |
|
Management Options- November 2023 |
5.49% |
43% |
5 years |
0.0340 |
|
|
|
|
|
|
The total charge to the consolidated statement of comprehensive income in relation to share based payment schemes for the period to 30 June 2026 was £54,951 (Period to 30 June 2025: charge of £47,597).
10 Subsequent Events
Broken Rock Extension
On 6 July 2026, the Company announced the extension of the agreement with Broken Rock Resources in relation to its option on Obonga. The extension moves the option expiry date from 31 August 2026 to 30 April 2027. The Company agreed to issue 30,000 new ordinary shares to Broken Rock Resources as consideration for extending the existing option agreement over the Obonga Greenstone Belt project.
On 14 September 2026, the Company announced the further extension of the agreement with Broken Rock Resources in relation to its option on Obonga. The extension moves the option expiry date from 30 April 2027 to 31 August 2027, providing the Company with additional time and flexibility to complete its exploration programme and satisfy the remaining terms of the agreement. The payment date of the CAD$250,000 (£135,825) due under the agreement is amended to no later than 31 August 2027. No further cash or shares consideration was issued to Broken Rock Resources in relation to this subsequent extension, but it was agreed that 25,000 share options with an exercise price of £1.70 and an expiry date of 31 August 2029 would be issued to Broken Rock.
Shares issued to suppliers
At the same time the Company announced the issue of 14,000 new ordinary shares as part settlement of amounts owing to its drilling contractor in respect of work undertaken to advance the Obonga exploration programme and 34,000 new ordinary shares to a service provider in settlement of consultancy fees relating to the Company's proposed listing on the Canadian Securities Exchange (CSE).
Management Option Expiry
On 22 August 2026 184,000 management options expired.
Warrant Conversions
On 11 August 2026, the Company announced the conversion of 40,000 75p warrants raising £30,000 for the Company.
On 21 September 2026, the Company announced the conversion 400,000 75p warrants raising £300,000 for the Company.
END