Operational Update Exploration Footprint Expanding

Summary by AI BETAClose X

Orosur Mining Inc. announced an operational update with positive assay results from the Pepas MRE infill and metallurgical program, including PEP065 with 33.3m @ 2.84g/t Au, PEP065B with 33.8m @ 2.79g/t Au, and PEP066 with 112m @ 5.25g/t Au from the surface. Resource consultants are scheduled to initiate the MRE process next week. Soil geochemistry at El Cedro confirmed high-grade potential, and a second porphyry was identified for future examination, with drilling planned for early 2026. An airborne magnetic/radiometric survey is planned for the area. A drill rig has arrived at the El Pantano Project in Argentina to commence the first drill program, with a planned 3000m diamond drilling campaign.

Disclaimer*

UK 100

Latest directors dealings