Anzá Operational Update

Summary by AI BETAClose X

Orosur reports APTA drill results of MAP109: 15.35m @ 0.97 g/t Au and MAP110: 43.55m @ 1.53 g/t Au (including 14.2m @ 3.1 g/t), will transition APTA to a formal resource drill-out planned to commence early next year; Pepas PTO draft completed and a PEA will be commissioned on a conceptual 500 t/day (~175,000 t/yr) case targeting ~25,000 oz/year for 10 years; three rigs are active with one rig redeployed from APTA to Pepas; El Cedro redrill CED001A has progressed past 267m with core recovered from 200m and a second rig is being evaluated; El Yarumo returns surface samples up to 10.67 g/t Au and is targeted for Q1 2027 drilling.

Disclaimer*

UK 100

Latest directors dealings