Bonanza Gold Finds Extend Mbe Mineral System

Summary by AI BETAClose X

Oriole Resources PLC announced further significant results from its Phase 1 drilling program at the 90% owned Mbe gold project in Cameroon. Holes MBDD018 to MBDD020 returned 31 gold mineralized intersections at the MB01-S target, bringing the total to 285, a rate of more than one intersection every 21m. Key intersections include MBDD019 with 6.15m at 19.67g/t Au from 113.50m, including 1.00m at 119.10g/t Au, and MBDD018 with 3.00m at 17.66g/t Au from 141.70m, including 2.00m at 26.31g/t Au. Five rock chip samples from artisanal pits returned grades up to 13.10g/t Au. The drilling results have extended the sub-surface mineralized system, which remains open, and the maiden Mineral Resource Estimate is expected in Q4-2025.

Disclaimer*

UK 100

Latest directors dealings