Operations Update: Bonanza Vein

Summary by AI BETAClose X

Nativo Resources Plc has provided an operations update for its Bonanza Gold Mine, reporting the early intersection of gold-bearing vein material within the first six meters of a newly advanced development heading, enhancing near-term recovery potential. Underground operations restarted on February 13, 2026, with mining contractors Kuboc and Frasser SAC. Approximately six tonnes of mineralised material have been recovered during development, with preliminary Poruña sampling indicating grades between 0.5 to 6 g/t Au, though high-grade zones were not specifically targeted. The company achieved a 100% Half-Cast Factor, demonstrating high drilling accuracy and effective blast control with minimal dilution. A comprehensive sampling program is in progress, with 54% of samples above 1 g/t, 22% above 3 g/t, and 2.8% exceeding 5 g/t, indicating a moderately skewed distribution toward higher grades.

Disclaimer*

UK 100

Latest directors dealings