Molly Gold Project Sampling Results

Summary by AI BETAClose X

Jangada reported multiple bonanza-grade grab samples at the Molly Gold Project, including 306.23 g/t Au (166.00 g/t Ag, 2.19% Pb, 1.12% Zn), 151.23 g/t Au, 370.41 g/t Au (148.00 g/t Ag) and 241.30 g/t Au (57.50 g/t Ag); Vivi produced three samples >100 g/t, four >40 g/t, 10 >10 g/t and 19 >1.0 g/t and mapping identified a cluster of at least seven mineralised veins across ~1 km²; Jane and Esmeril returned up to 26.56 g/t Au; the system is polymetallic (Ag, Cu, Pb, Zn), Phase 2 drilling is fully funded and nearing completion, and significant assay work remains pending (78 channel samples with 54 assays pending plus 26 additional grab assays).

Disclaimer*

UK 100