Molly Gold Project Drilling & Exploration Update

Summary by AI BETAClose X

Jangada Mines plc has completed Phase 1 drilling at its Molly Gold Project, confirming historical data and extending mineralisation, with an existing inferred resource of 130,000 ounces of gold. Significant high-grade gold intercepts were reported, including 0.50m at 21.81 g/t Au in Hole 13A, and a new style of disseminated mineralisation in Hole 4A, which could allow for low-cost open-pit mining. The Vivi target has emerged as a highly prospective new discovery, with rock-chip samples yielding exceptional grades up to 306.2 g/t Au, alongside strong silver, copper, lead, and zinc. The company also confirmed a structurally controlled mineralised system at Molly 2, with promising lead and gold intercepts. Ongoing geophysical surveys are expected to refine targets for future drilling, and Jangada remains well-financed with over £1 million in cash.

Disclaimer*

UK 100

Latest directors dealings