Selected for 710 MW of projects in Germany

Summary by AI BETAClose X

ITM Power plc has been selected by Stablegrid Group as the technology partner for two significant energy infrastructure projects in Germany, collectively representing 710 MW of electrolyser capacity. The first project, "Netzbrücke 410" in Rüstringen, will utilize a 30 MW NEPTUNE V containerised electrolyser system, with a final investment decision expected in 2026. The second, larger project involves installing 680 MW of indoor electrolyser capacity, with pre-FEED work commencing in January 2026 and an anticipated final investment decision in 2028. These projects are designed for grid balancing and hydrogen production to stabilize the power system and reduce costly redispatch interventions.

Disclaimer*

Companies

ITM Power (ITM)
UK 100

Latest directors dealings