Successful Inez #1 flow test and gas results

Summary by AI BETAClose X

Helix Exploration PLC announced successful flow testing and gas analysis results at the Inez #1 well in the Rudyard Field Project, Montana. The Inez #1 well was perforated at a 55ft interval from 5,175ft-5,230ft, assaying high-grade helium at 1.2%, with the balance primarily nitrogen. Flow rates were established with Absolute Open Flow estimated at 1,157 thousand cubic feet per day (Mcf/d) and a maximum surface pressure of the zone tested at 1,541 psi. The Inez #1 well brings the number of producing wells at the Rudyard project to four. The company will look to perforate additional zones in the upper Souris River formation which has the potential to add to current flow rates.

Disclaimer*

UK 100

Latest directors dealings