Havieron Project – Feasibility Study

Summary by AI BETAClose X

Greatland Resources Limited has released a Feasibility Study for its Havieron Project, confirming its potential as a world-class, low-cost Australian gold-copper mine. The study projects pre-tax free cash flow of $739 million annually from steady-state operations, with an updated Ore Reserve of 38.5 million tonnes grading 2.63g/t gold and 0.33% copper, totaling 3.3 million ounces of gold and 128,000 tonnes of copper. The pre-production capital expenditure is estimated at $1,065 million, expected to be fully funded by existing cash reserves of $750 million, ongoing Telfer cash flows, and a $500 million debt commitment. The base case post-tax Net Present Value is $2.9 billion with a 22.5% Internal Rate of Return, with potential for significant cost savings if Telfer mine life is extended and ore is co-processed.

Disclaimer*

UK 100

Latest directors dealings