Phase III Diamond Drilling Underway at Cerro Negro

Summary by AI BETAClose X

Great Southern Copper PLC has commenced Phase III diamond drilling at Cerro Negro, part of the Especularita project, with approximately 2,000m planned. The drilling aims to extend high-grade copper-silver results from Phases I and II, particularly targeting extensions to discovery hole DD007, which previously intersected 3.85m of 5.21% copper and 318g/t silver from 88m, and 5.00m of 5.59% copper and 99.2g/t silver from 115m, within a broader 33.0m interval of 1.96% copper and 60.6g/t silver from 87m. Drilling will also target beneath shallow, leached intercepts, including a 22.5m leached intercept in hole DD012 which terminated in 3m @ 3.43% copper and 164.7 g/t silver from 24m. Subsequent drilling will target geochemical and geophysical targets along trend to the south.

Disclaimer*

UK 100

Latest directors dealings