Hussar EP513 Pre-Drill Site Works Update

Summary by AI BETAClose X

Georgina Energy PLC has announced that contractors have completed significant pre-drill site works for the Q3 Hussar drilling program, including clearing and grading the drill pad, site pad, accommodation pad, and camp site, as well as repairing and widening the airstrip. Seismic line access tracks and the Gunbarrel Highway have also been graded and repaired to facilitate the mobilisation of the Ensign 970 drill rig, with an anticipated spud date in September 2026. The Hussar prospect, one of Australia's largest onshore subsalt Helium, Hydrogen, and Hydrocarbon prospects with 300 km² of areal closure, targets primary subsalt reservoir formations. Independent consultants estimate net attributable 2U Prospective Resources of 155 BCFG Helium and 173 BCFG hydrogen with a potential combined in-situ value of US$55 billion, alongside 1.73 TCFG of Natural Gas with a potential in-situ value of US$5.24 billion.

Disclaimer*

UK 100

Latest directors dealings