Site visits to Kirkland Lake tailings projects

Summary by AI BETAClose X

Fulcrum Metals plc is advancing its Kirkland Lake tailings projects, Teck Hughes and Sylvanite, with site visits planned between October 19th and 23rd, 2025. The company is conducting an auger drill program at Teck Hughes, with best assay results of 1.62g/t over 0.8 metres and best hole results of 1.02g/t over 4.75 metres from surface reported from 94 augur drill holes. The deepest hole measured is 12.4 metres. Historical data estimates Teck Hughes contains 6,531,300 tonnes of material at 0.66g/tonne Au for 138,460 ounces of gold, while Sylvanite has an estimated 4.14 million tonnes grading 0.47g/t Au containing 67,051 ounces of gold; these estimates remain to be verified by Fulcrum. Phase 3 testing is underway with results expected around December 2025.

Disclaimer*

UK 100

Latest directors dealings