Positive Feasibility Study Results

AI SummaryClose X

Ferro-Alloy Resources announced positive results from its feasibility study on the Balasausqandiq vanadium deposit, highlighting compelling economics with a net present value of US$748 million and an internal rate of return of 22%. The project requires US$520 million to enter production and is projected to produce 8,500 tonnes of V2O5 and 247,000 tonnes of carbon black substitute annually over a 20-year mine life. The project anticipates low cash operating costs of US$4.35 per pound of V2O5, reducing to US$0.36 per pound net of by-product credits. Vanadium pentoxide prices are forecast to increase from US$8.67/lb in 2029 to US$10.59/lb in 2037. The company is in discussions with financial institutions for debt and equity financing.

Disclaimer*

UK 100

Latest directors dealings