EG-08 PSC Phase 1 Extension

Summary by AI BETAClose X

Europa Oil & Gas has received a 12-month extension from Equatorial Guinea's Minister of Hydrocarbons and Mining Development for the initial two-year period of the EG-08 production sharing contract (PSC). This extension means the first sub-period of Phase 1 of the PSC will now expire on 4 October 2026. Europa holds a 42.9% equity interest in Antler Global Limited, which possesses an 80% working interest in the EG-08 PSC. The EG-08 block is estimated to contain 2.196 TCF (Pmean), with the Barracuda prospect estimated at 878 BCF (Pmean). The company aims to finalize the farm out process for EG-08 and is working on engineering plans to potentially drill the Barracuda prospect in 2026.

Disclaimer*

UK 100

Latest directors dealings