Drilling Results

AI SummaryClose X

Critical Mineral Resources reported assays from 15 infill diamond holes at Agadir Melloul, highlighted by BH189 which returned 2.2 m at 2.5% Cu and 77 g/t Ag (including 0.6 m at 3.8% Cu and 90 g/t Ag) and BHF03 with 8.0 m at 1.0% Cu; other intercepts include 1.6 m at 1.7% Cu and 4.9 m at 0.60% Cu. The programme reduced section spacing from 100 m to 50 m to support an impending maiden Mineral Resource Estimate, adds to a database of 219 diamond holes (9,244.30 m) plus 28 RC holes (880 m) totalling 10,124.30 m, and the company plans 2027 drilling to test a NNW silver‑rich structure while pursuing a fast‑track, low‑capex development route.

Disclaimer*

UK 100

Latest directors dealings