China Yangtze Power Co., Ltd.
Announcement on Electricity Generation in Q1 of 2026
This Announcement has been prepared in Chinese and English respectively. In the event of any discrepancy or conflict between the Chinese and English versions, the Chinese version shall prevail. The Company shall not be liable for any loss arising from misunderstanding of the English version.
Based on the Company's preliminary statistics, for the first quarter of 2026, the total inflow to the Wudongde Reservoir was approximately 15.475 billion cubic meters, representing a decrease of 7.36% compared with the same period last year, and the total inflow to the Three Gorges Reservoir was approximately 58.568 billion cubic meters, representing an increase of 5.49% compared with the same period last year.
In the first quarter of 2026, the total power generation of the six cascade hydropower stations owned by the Company within China reached approximately 61.825 billion kWh, an increase of 7.19% compared to the same period last year. Details of each station's generation are as follows:
|
Hydropower Station |
Total Generation (100 million kWh) |
YoY Change (%) |
|
Wudongde Hydropower Station |
63.7553 |
-2.5976 |
|
Baihetan Hydropower Station |
130.8012 |
4.0238 |
|
Xiluodu Hydropower Station |
144.8316 |
9.7064 |
|
Xiangjiaba Hydropower Station |
78.0586 |
10.8759 |
|
Three Gorges Hydropower Station |
163.4802 |
10.5136 |
|
Gezhouba Hydropower Station |
37.3216 |
5.9021 |
|
Total |
618.2485 |
7.1886 |
It is hereby announced.
Board of Directors of China Yangtze Power Co., Ltd.
April 14, 2026