MCB metallurgical testing results

AI SummaryClose X

Celsius Resources Limited has announced positive metallurgical test results for its MCB Copper-Gold Project, indicating high copper recoveries of 95% and gold recoveries of 77% over the first ten years of mine life. These results, based on a conventional flotation circuit, are expected to produce a high-quality copper-gold concentrate averaging 25.5% copper and 5.5 g/t gold with low impurities. These findings support the updated Feasibility Study and Front-End Engineering Design, which are scheduled for completion by December 2025, and are consistent with previous test work, reinforcing the project's economic viability.

Disclaimer*

UK 100

Latest directors dealings