Results of Allar #1

Summary by AI BETAClose X

Buccaneer Energy Plc announced that the Allar #1 well, in which it holds a 32.5% working interest, was drilled to 5,767 feet but did not encounter a commercial hydrocarbon accumulation in the 2nd sub-Clarksville unit. The well will be plugged and abandoned, and the drilling rig will move to drill the Fouke #4 well. Despite the disappointing results, the company stated that valuable subsurface data was gathered which will inform future drilling plans and de-risk the upcoming Fouke #4 location. Buccaneer Energy continues to generate revenue from existing wells in the Pine Mills Field.

Disclaimer*

UK 100

Latest directors dealings