Operational Update

Summary by AI BETAClose X

Buccaneer Energy Plc announced an operational update for its Fouke area in the Pine Mills field, detailing plans for a secondary recovery waterflood scheme using the Turner #1 and Daniel #1 wells as injection points. This initiative aims to increase reservoir pressure and improve oil recovery, with expected additional waterflood volumes ranging between 667,000 and 1,002,000 barrels, significantly enhancing the 333,851 barrels of oil recovered through primary recovery as of September 2025. The company anticipates a six-month period for regulatory approvals and facility construction, during which Turner #1 will resume production, contributing incrementally to output.

Disclaimer*

UK 100

Latest directors dealings