Whistlejacket Lithium Project Update

AI SummaryClose X

Bradda Head Lithium Ltd has announced significant intersections of visible spodumene mineralization in the first three diamond drill holes at its Whistlejacket Lithium Project in Arizona. Hole WSTL0020 intersected 31.8 meters of mineralization, WSTL0021 showed intervals of 6.41 meters and 19.23 meters, and WSTL0022 encountered a broad 46-meter zone. Samples from WSTL0020 have been sent for laboratory analysis, with results expected soon, and drilling continues to further define the mineralized body.

Disclaimer*

UK 100

Latest directors dealings