CCS Pilot Injection

Summary by AI BETAClose X

Block Energy plc announced the successful completion of its initial Carbon Capture Storage (CCS) CO2 pilot injection. A total of 13.6 tonnes of liquid CO2 was injected into the reservoir, along with 300m3 of water and sodium fluorescence tracer, at pressures of 120-130 bar. No CO2 leakage was detected on the surface following the injection. The original study ascribed a total volume of 151.5 Mt in the mid case. The company expects it will take 4-6 months to determine if the CO2 has successfully mineralised in the reservoir.

Disclaimer*

UK 100

Latest directors dealings