Northern Syncline Drilling Results

Summary by AI BETAClose X

Blencowe Resources Plc announced the final assay results from its Stage 7 drilling program at the Orom-Cross graphite project. The drilling program, totaling 7,750 metres, combined infill and geotechnical drilling across Camp Lode and Northern Syncline with step-out exploration at Lyan, Beehive and the deep holes. The infill drilling confirms broad, consistent mineralization throughout the oxide zone. Selected drill results from the Northern Syncline include Hole L2301 with 20.57m @ 6.52% TGC and Hole L2302 with 25.08m @ 4.98% TGC, including 4.9m @ 7.90% TGC and 4.1m @ 9.30%TGC. The JORC Resource update is expected within approximately two weeks, feeding into the Definitive Feasibility Study due by December 2025.

Disclaimer*

UK 100

Latest directors dealings