Further Drilling Results - Camp Lode

Summary by AI BETAClose X

Blencowe Resources Plc announced assay results from its Stage 7 drilling program at the Orom-Cross graphite project. Infill drilling at Camp Lode delivered high-grade, near-surface graphite hits, including Hole L1602 with 27.49m @ 8.18% TGC, Hole L1703 with 25.39m @ 7.34% TGC, and Hole L1803 with 27.75m @ 5.41% TGC. Hole L1502 showed 16.26m @ 7.37% TGC, and Hole L1601 showed 13.63m @ 6.18% TGC. These results confirm high-grade extensions near the planned pit area, expected to strengthen early-stage project economics. The Definitive Feasibility Study remains on track for completion in Q4 2025.

Disclaimer*

UK 100

Latest directors dealings