Beehive Drilling Returns Multiple 30m Intercepts

Summary by AI BETAClose X

Blencowe Resources Plc has announced promising assay results from shallow drilling at its Beehive deposit in Uganda, with multiple holes returning over 30-metre intercepts from surface and graphite grades up to 10.78% TGC. Specifically, hole BHDD-L209 intersected 30.09 metres at 10.78% TGC, and BHDD-L207 yielded 31.4 metres at 9.46% TGC. These findings support the potential for bulk-mineable near-surface graphite and are expected to contribute to a maiden JORC Mineral Resource estimate for Beehive, further strengthening the Orom-Cross project's overall resource of 43.0 million tonnes. Additional results are anticipated shortly as JORC modelling advances.

Disclaimer*

UK 100

Latest directors dealings