Beehive Delivers 2 Standout +90 metre Intercepts

Summary by AI BETAClose X

Blencowe Resources Plc has announced further positive assay results from its Beehive deposit in Uganda, with deep holes L237B and L239B reporting significant graphite intercepts of 93.98 metres at 6.03% TGC and 95.45 metres at 5.62% TGC respectively, reinforcing the deposit's scale and potential for multi-decade production. These results, alongside previous findings from Hole L238B (92.55m @ 6.83% TGC), indicate a thick, continuous graphite system that remains open at depth, supporting the Orom-Cross project's capacity for long-life operations and attractiveness to institutional funding. Assay results from 108 shallow holes at Beehive and 72 at Iyan are pending, with the company progressing funding discussions.

Disclaimer*

UK 100

Latest directors dealings