Clogau Sampling, Shaft 2 Processing & Mineralogy

Summary by AI BETAClose X

Arkadian reports promising early recovery and sampling at Clogau: a 100kg Shaft 2 sighter yielded 0.81 grams of gold (equivalent to 8.1 g/t), approximately 1.7 tonnes of Shaft 2 floor material are being processed with visible gold in every fraction, and up to ~50 tonnes of additional floor material is estimated available. The company has renewed its waste-tip lease and collected ~2 tonnes of tip material with initial panning showing gold particles (previous <1mm trench sampling averaged 9.2 g/t). Concentrates and thin sections are being submitted for independent laboratory assay and SEM to confirm grades and recovery potential.

Disclaimer*

UK 100

Latest directors dealings