Final Stage 1 Drill Results from Lithium Ridge

AI SummaryClose X

Andrada completed the SQM-funded Stage 1 diamond drilling programme of 143 holes totalling 16,525 metres (an 18% expansion from the planned 14,000 m) with SQM funding US$7.0m to earn an initial 30% interest; results confirm multiple stacked lithium-bearing pegmatites to ~300 m including LRD049: 15.94 m @ 2.20% Li2O (incl. 2.96 m @ 3.07% Li2O), LRD124: 32.07 m @ 1.02% Li2O and LRD126: 24.17 m @ 1.30% Li2O, together with pervasive tin (up to 1.41% Sn) and tantalum (up to 768 ppm Ta), supporting bulk open-pit potential and improved multi-commodity project economics pending metallurgical and economic studies.

Disclaimer*

UK 100