Fifth Batch of Drill Results from Lithium Ridge

Summary by AI BETAClose X

Andrada Mining Limited has announced significant high-grade lithium intersections from the fifth batch of exploration drill results at its Lithium Ridge Project, confirming down-dip continuity and structural thickening of pegmatite swarms. Notable results include 34.90m at 1.02% Li₂O in LRD045, with an included interval of 6.22m at 1.67% Li₂O, and 10.66m at 1.13% Li₂O in LRD060, including 4.79m at 2.04% Li₂O. The project is being advanced in partnership with SQM, and the results also indicate pervasive tin and tantalum mineralization, potentially enhancing project economics.

Disclaimer*

Andrada Mining Limited
06 October 2026
 


6 October 2026                                                                               


The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR) as in force in the United Kingdom pursuant to the European Union (Withdrawal) Act 2018. Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information will be in the public domain.

Andrada Mining Limited

("Andrada" or the "Company")

Fifth Batch of Drill Results from Lithium Ridge

Significant High Grade Lithium Intersections from Multiple Pegmatites

Andrada Mining Limited (AIM: ATM, OTCQB: ATMTF), a tin producer with a portfolio of critical minerals mining and exploration assets in Namibia, is pleased to announce assay results for the fifth batch of exploration Diamond Drill (“DD”) holes from the Lithium Ridge Project ("LR" or the "Project"). This latest batch of data confirms substantial down-dip continuity and structural thickening of the targeted pegmatite swarms. The results demonstrate high-grade lithium alongside pervasive tin (Sn) and tantalum (Ta) mineralisation within the sub-intervals reported as ‘including’. The potential production of multiple revenue-generating commodities will enhance overall project economics and improve the effective cost position of the operation, albeit subject to further metallurgical testwork and economic evaluation. The Project is being advanced under a strategic earn-in partnership with SQM International ("SQM"), one of the world’s leading lithium producers.

HIGHLIGHTS

     Significant lithium mineralisation within multiple drill holes, including:

−     Drill hole LRD045: 34.90m @ 1.02% Li2O from 184.42m to 219.32m.

      Including 6.22m @ 1.67% Li2O from 192.62m to 198.84m.

−     Drill hole LRD060: 10.66m @ 1.13% Li2O from 0.90m to 11.56m.

      Including 4.79m @ 2.04% Li2O from 4.81m to 9.60m.

−     Drill hole LRD042: 9.03m @ 1.64% Li2O from 63.83m to 72.86m.

      Including 5.44m @ 1.84% Li2O from 67.13m to 72.57m.

−     Drill hole LRD066: 11.35m @ 1.16% Li2O from 34.16m to 45.51m.

      Including 4.64m @ 1.79% Li₂O from 37.18m to 41.82m.

      Polymetallic mineralisation: Associated tin and tantalum mineralisation remains pervasive across the pegmatite bodies, with localised zones such as 0.25 m at 1.03% Sn and 227ppm Ta in hole LRD061, 0.95 m at 0.57% Sn in LRD074, and 0.36 m at 604 ppm Ta in LRD045.

      Additional mineralisation confirmed within the license area: Multiple drill holes (LRD064, LRD066, and LRD072) confirm consistent high-grade mineralisation within a newly identified pegmatite that occurs outside the LR trendline.  

Anthony Viljoen, Chief Executive Officer, commented:

“This fifth batch of results demonstrates the presence of high-grade intersections confirming that we are still uncovering the full potential of the Lithium Ridge licence. Multiple pegmatites in this batch have returned intersections exceeding 1.5% Li₂O. These results also confirm that newly identified pegmatites beyond the main mineralised trend at Lithium Ridge also contain substantial lithium mineralisation. This highlights the upside potential that remains to be explored across the licence.”

RESULTS Overview

These results represent the fifth batch of drill samples completed under the Stage 1 Earn-In Agreement with SQM. Table 1 below contains the results of 23 drill holes that successfully intersected mineralisation, demonstrating that mineralisation occurs both near surface and extending to depths of up to 275 metres. The results also confirm the presence of lithium mineralisation beyond the main Lithium Ridge trendline. While the grab sampling programme provided an initial indication of the lithium potential of these additional targets, the drill results confirm that the pegmatites continue at depth and retain significant lithium grades. The potential of these additional targets will be further investigated during the next stage of development.

Geologically, defining the extent of mineralised pegmatites within the swarm provides critical data for future exploration planning. Six drill holes, namely, LRD058, LRD065, LRD076, LRD082, LRD095, and LRD101, either did not intersect significant pegmatite lithologies or intersected intervals that did not meet the minimum reporting economic cut-off threshold. Each reported pegmatite interval is required to meet at least one of the following metal content thresholds: >0.25% Li₂O, >0.1% Sn or >99 ppm Ta. These specific holes will be utilised to delineate the spatial limits of the mineralised units and to refine the 3D geological model, thereby increasing geological confidence for future resource delineation.

Reporting Methodology

The holes were drilled at inclined angles to the horizontal and, accordingly, the reported intersections are considered to represent apparent widths rather than true thicknesses. Downhole orientation surveys were conducted using a magnetic deviation probe, with readings collected at two metre intervals as drilling progressed. Each hole was also surveyed in full following completion of drilling. Drill collar locations were surveyed using a handheld GPS.

The holes are reported as ‘Whole Intersections’ in Table 1, representing the pegmatite intersection from the upper to the lower contact. Where these intersections contain schistose xenoliths, the reported grades reflect the metal content of the pegmatite only and exclude the schistose intervals. Intersections reported as ‘Including’ represent selected higher-grade zones within the total pegmatite intersection. Consistent with previous batches of Lithium Ridge drill results, spodumene is the primary lithium-bearing mineral identified within these intersections. The associated presence of coincident tin and tantalum mineralisation further demonstrates the polymetallic nature of the LR pegmatites, enabling the Company to leverage its existing metallurgical processing expertise to maximise resource extraction.

Sampling and Analysis

Drill holes were collared at inclined angles ranging from -45 to -75 degrees to intersect the pegmatite bodies as close to perpendicular as practicable. Drill core was geologically and structurally logged, cut into quarter core samples and dispatched to certified independent preparation and analytical laboratories.

Sample preparation was undertaken by SA Labs Ithuba, with chemical analyses performed by UIS Analytical Services. Lithium and major elements were analysed using sodium peroxide fusion followed by an ICP-OES finish, while tin, tantalum, and trace elements were analysed using lithium borate fusion followed by an ICP-MS finish. Comprehensive QA/QC protocols were maintained throughout the drilling, sampling and analytical programmes. No top cut was applied when calculating the reported weighted average grades for mineralised intersections within the pegmatites.

Table 1: Results for intersected mineralised pegmatites with the intersection depths, lengths and grades reported. Intersections described as 'Including' refer to a portion of the whole pegmatite intersection with significant metal values. The reported intersections are indicative of apparent thickness, which is greater than true thickness.

Hole ID

Dip Angle (Degrees)

Intersection Type

From - To (metres)

Length (metres)

Grade

Li₂O (%)

Sn (%)

Ta (ppm)

LRD042

-50

Whole Intersection

48.82 - 49.07

0.25

0.12

0.08

214

Whole Intersection

54.93 - 55.18

0.25

0.06

0.04

129

Whole Intersection

61.46 - 62.67

1.21

0.52

0.21

136

Whole Intersection

63.27 - 63.52

0.25

0.47

0.08

182

Whole Intersection

63.83 - 72.86

9.03

1.64

0.21

101

Including

67.13 - 72.57

5.44

1.84

0.20

93

Whole Intersection

73.11 - 73.79

0.68

1.41

0.17

181

Whole Intersection

76.04 - 76.29

0.25

0.41

0.10

75

Whole Intersection

76.70 - 79.62

2.92

0.79

0.16

121

Whole Intersection

80.29 - 81.44

1.15

0.43

0.09

222

Whole Intersection

81.83 - 82.47

0.64

0.57

0.11

191

Whole Intersection

88.48 - 92.29

3.81

1.07

0.17

139

Whole Intersection

95.23 - 95.65

0.42

0.06

0.11

199

Whole Intersection

97.08 - 102.10

5.02

0.66

0.12

125

Whole Intersection

102.53 - 103.22

0.69

0.33

0.11

100

Whole Intersection

103.59 - 106.74

3.15

1.05

0.13

56

Whole Intersection

107.44 - 107.81

0.37

0.15

0.10

59

Whole Intersection

114.23 - 117.46

3.23

0.98

0.14

64

Whole Intersection

117.94 - 118.19

0.25

0.10

0.24

50

Whole Intersection

132.02 - 133.12

1.10

0.16

0.11

49

Whole Intersection

134.42 - 144.31

9.89

1.28

0.13

54

Including

134.86 - 136.99

2.13

1.65

0.09

39

Whole Intersection

147.61 - 153.66

6.05

0.61

0.13

41

LRD043

-45

Whole Intersection

17.05 - 17.35

0.30

0.02

0.13

101

Whole Intersection

37.04 - 37.56

0.52

0.02

0.17

56

Whole Intersection

112.53 - 113.19

0.66

0.06

0.11

65

LRD045

-75

Whole Intersection

72.93 - 73.29

0.36

0.01

0.02

604

Whole Intersection

73.96 - 74.82

0.86

0.01

0.01

255

Whole Intersection

76.29 - 76.77

0.48

0.01

0.02

199

Whole Intersection

166.47 - 167.08

0.61

0.07

0.08

139

Whole Intersection

169.86 - 170.86

1.00

0.36

0.04

39

Whole Intersection

171.37 - 174.19

2.82

0.95

0.11

99

Whole Intersection

175.78 - 176.07

0.29

0.31

0.04

38

Whole Intersection

176.68 - 177.00

0.32

0.15

0.05

140

Whole Intersection

177.80 - 178.05

0.25

0.14

0.06

109

Whole Intersection

182.95 - 183.55

0.60

0.66

0.10

153

Whole Intersection

184.42 - 219.32

34.90

1.02

0.13

91

Including

192.62 - 198.84

6.22

1.67

0.19

97

Whole Intersection

219.64 - 220.61

0.97

0.55

0.14

100

Whole Intersection

221.00 - 221.25

0.25

0.35

0.03

66

Whole Intersection

231.17 - 235.43

4.26

0.67

0.17

60

Whole Intersection

243.75 - 259.38

15.63

0.68

0.10

47

Including

245.71 - 247.85

2.14

1.34

0.07

94

Whole Intersection

259.67 - 259.94

0.27

0.11

0.16

46

Whole Intersection

273.21 - 275.13

1.92

0.07

0.11

36

LRD056

-45

Whole Intersection

12.28 - 14.21

1.93

0.02

0.13

74

Whole Intersection

34.75 - 40.16

5.41

1.18

0.16

40

Including

35.60 - 39.91

4.31

1.46

0.15

36

LRD059

-50

Whole Intersection

43.23 - 45.49

2.26

0.05

0.12

77

Whole Intersection

59.77 - 60.02

0.25

0.04

0.03

126

Whole Intersection

66.83 - 68.82

1.99

0.10

0.44

105

LRD060

-45

Whole Intersection

0.90 - 11.56

10.66

1.13

0.09

30

Including

4.81 - 9.60

4.79

2.04

0.10

27

Whole Intersection

37.81 - 40.67

2.86

0.18

0.10

102

Whole Intersection

90.74 - 93.09

2.35

0.12

0.14

29

LRD061

-60

Whole Intersection

4.07 - 4.32

0.25

0.10

0.02

317

Whole Intersection

9.99 - 10.24

0.25

0.03

1.03

227

Whole Intersection

25.47 - 29.46

3.99

2.11

0.14

157

Whole Intersection

32.35 - 33.66

1.31

0.99

0.12

81

Whole Intersection

48.86 - 49.11

0.25

0.08

0.09

106

Whole Intersection

50.90 - 51.41

0.51

0.06

0.03

258

Whole Intersection

64.49 - 67.34

2.85

0.69

0.20

62

Hole ID

Dip Angle (Degrees)

Intersection Type

From - To (metres)

Length (m)

Grade

Li₂O (%)

Sn (%)

Ta (ppm)

LRD063

-60

Whole Intersection

40.19 - 56.62

16.43

1.07

0.14

71

Whole Intersection

61.81 - 62.10

0.29

0.10

0.07

151

Whole Intersection

75.38 - 75.53

0.15

0.08

0.03

194

Whole Intersection

83.38 - 84.17

0.79

0.07

0.13

124

LRD064

-60

Whole Intersection

12.54 - 23.66

11.12

1.11

0.18

39

Including

14.36 - 18.36

4.00

1.73

0.26

42

LRD066

-45

Whole Intersection

34.16 - 45.51

11.35

1.16

0.14

49

Including

37.18 - 41.82

4.64

1.79

0.16

67

LRD067

-45

Whole Intersection

47.00 - 47.29

0.29

0.03

0.02

172

Whole Intersection

59.61 - 61.18

1.57

0.05

0.16

62

Whole Intersection

61.91 - 63.65

8.04

0.08

0.02

13

Whole Intersection

85.79 - 86.66

0.87

0.11

0.15

60

Whole Intersection

86.98 - 87.41

0.43

0.14

0.10

86

Whole Intersection

125.25 - 125.54

0.29

0.07

0.02

106

LRD068

-45

Whole Intersection

5.81 - 6.55

0.74

0.20

0.23

213

Whole Intersection

11.93 - 12.42

0.49

0.10

0.23

116

Whole Intersection

12.72 - 13.78

1.06

0.07

0.39

121

Whole Intersection

33.42 - 33.92

0.50

0.00

0.08

101

LRD069

-45

Whole Intersection

24.26 - 25.10

0.84

0.05

0.10

87

Whole Intersection

66.28 - 71.34

5.06

0.26

0.15

44

LRD070

-45

Whole Intersection

109.97 - 110.48

0.51

0.04

0.02

100

Whole Intersection

116.35 - 116.89

0.54

0.04

0.03

101

LRD072

-60

Whole Intersection

38.95 - 53.20

14.25

1.42

0.17

39

Including

40.09 - 48.32

8.23

1.61

0.23

37

LRD073

-45

Whole Intersection

19.69 - 20.15

0.46

0.02

0.20

68

Whole Intersection

33.86 - 34.11

0.25

0.02

0.08

140

Whole Intersection

49.45 - 49.78

0.33

0.03

0.06

105

Whole Intersection

107.17 - 107.42

0.25

0.02

0.03

101

Whole Intersection

149.24 - 154.58

5.34

0.44

0.05

22

LRD074

-45

Whole Intersection

33.80 - 34.75

0.95

0.10

0.57

117

Whole Intersection

35.80 - 36.85

1.05

0.03

0.18

44

Whole Intersection

40.47 - 42.02

1.55

0.06

0.05

100

LRD077

-50

Whole Intersection

14.50 - 22.10

7.60

0.56

0.07

59

Including

17.20 - 18.54

1.34

1.18

0.21

67

LRD080

-60

Whole Intersection

16.90 - 29.48

12.58

0.41

0.03

56

Including

27.09 - 29.09

2.00

1.41

0.02

94

LRD083

-60

Whole Intersection

9.03 - 9.61

0.58

0.01

0.01

219

Whole Intersection

71.83 - 76.85

5.02

0.37

0.02

18

Whole Intersection

77.58 - 77.83

0.25

0.32

0.02

59

Whole Intersection

78.35 - 81.50

3.15

0.25

0.03

30

Whole Intersection

103.84 - 104.24

0.40

0.02

0.02

124

LRD084

-60

Whole Intersection

6.19 - 6.44

0.25

0.02

0.38

117

Whole Intersection

35.06 - 39.54

4.48

0.11

0.10

35

LRD099

-50

Whole Intersection

35.04 - 35.52

0.48

0.02

0.02

112

LRD102

-45

Whole Intersection

10.33 - 10.80

0.47

0.03

0.02

208

Whole Intersection

25.05 - 25.91

0.86

0.12

0.12

98

Whole Intersection

30.18 - 31.29

1.11

1.24

0.16

107

Whole Intersection

31.69 - 32.16

0.47

0.95

0.23

116

Whole Intersection

32.47 - 32.96

0.49

0.81

0.12

58

Whole Intersection

33.32 - 34.11

0.79

0.70

0.21

99

Whole Intersection

36.38 - 43.64

7.26

0.39

0.12

44

Including

40.89 - 41.87

0.98

1.07

0.07

18

Whole Intersection

43.98 - 44.26

0.28

0.99

0.12

28

Whole Intersection

44.59 - 45.42

0.83

0.26

0.17

37

Whole Intersection

46.12 - 48.37

2.25

0.28

0.12

32

Whole Intersection

55.15 - 57.93

2.78

0.06

0.17

79

Whole Intersection

85.07 - 85.32

0.25

0.09

0.03

122

Whole Intersection

88.06 - 88.84

0.78

0.02

0.10

133

Whole Intersection

110.11 - 110.36

0.25

0.05

0.03

205












 



 


Figure 1: Locations of the current and historically completed programmes. The diamond drill holes are from this campaign and the reverse circulation drill holes (green triangles) were completed during the 2023 campaign. The line A-A’ represents the cross section in Figure 2 below.





Figure 2: Section line A-A' displaying a projection of the diamond drill holes, LRD035, LRD042 and LRD045, for which results are reported in this announcement. Selected mineralised intersections from LRD042 and LRD045 are reported in Table 1, with the intersections for LRD035 having been reported previously.



CompetenT Person

The technical data in this announcement has been reviewed by Professor Laurence Robb ("Prof. Robb"). Prof. Robb has over 30 years industry-related exploration and economic geology experience and is a Competent Person for the reporting of exploration results. He has reviewed both the technical disclosures in this release and QA/QC protocols and results for this programme. As previously announced, the Company will continue to provide regular updates as significant results are received and milestones achieved.

Glossary of abbreviations

%

Symbol for percentage

DD

Diamond Drill

ICP-MS

Inductively Coupled Plasma-Mass Spectrometry

ICP-OES

Inductively Coupled Plasma-Optical Emission Spectrometry

Li

Symbol for lithium

Li → Li₂O

Metal to metal-oxide conversion factor of 2.153

Li₂O

Lithium oxide

PPM

Parts Per Million

QA/QC

Quality Assurance / Quality Control

Sn

Symbol for tin

Ta

Symbol for tantalum

Glossary of technical Terms

Apparent thickness

The relationship between apparent width and true thickness is based on the formula by Addie (1968 Economic Geology, vol 63, pp 188-189).

Dip angle

The angle of inclination measured downward from horizontal.

Geological model

The interpretation of mineralisation and geology that controls the shape of the mineralised unit. This is usually generated in a three-dimensional computer environment.

Pegmatite

An igneous rock typically of granitic composition, which is distinguished from other igneous rocks by the extremely coarse size of its crystals, or by an abundance of crystals with skeletal, graphic, or other strongly directional growth habits, or by a prominent spatial zonation of mineral assemblages.

Xenolith

A foreign rock fragment (e.g., schist) within an intrusive body (e.g., pegmatite) that is unrelated to the igneous body.

 

CONTACTS

Andrada Mining Limited

Anthony Viljoen, CEO

Sakhile Ndlovu, Head of Investor Relations

+27 (11) 268 6555

NOMINATED ADVISOR & BROKER

 

Zeus Capital Limited

Katy Mitchell

Andrew de Andrade

Harry Ansell

+44 (0) 20 2382 9500

CORPORATE BROKER & ADVISOR

 

H&P Advisory Limited

Andrew Chubb

Matt Hasson

+44 (0) 20 7907 8500

VSA Capital

  Andrew Monk

  Brian Wong

 

+44 (0) 20 3005 5000

FINANCIAL PUBLIC RELATIONS

 

Tavistock

Emily Moss

Abigail Gilchrist

 

+44 (0) 207 920 3150

andrada@tavistock.co.uk

 

 

About Andrada Mining Limited

Andrada Mining Limited, listed on the London Stock Exchange's AIM market, is a tin producer with a portfolio of critical metal mining and exploration assets in Namibia, a premier investment destination in Africa. The Company's strategy focuses on unlocking Namibia's abundant mineral resources through best-in-class strategic partnerships across its resource base. Andrada has evolved from a tin producer into a diversified critical minerals company with three distinct but complementary value centres, namely Uis, the producing foundation of the Company, Lithium Ridge, an increasingly significant lithium opportunity being advanced with SQM, and Brandberg West, a historically producing tin and tungsten asset with significant tungsten, tin and copper potential being developed in partnership with BWCAM. Across the portfolio, Andrada has exposure to tin, lithium, tungsten, copper and tantalum, metals that are becoming increasingly important to global energy security, advanced technology, artificial intelligence infrastructure, electrification and defence

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UK 100

Latest directors dealings