Commercial-Scale Expansion at Mojimoto & Kabete

AI SummaryClose X

Amigo Resources PLC is advancing its Tanzanian operations, with both Mojimoto and Kabete transitioning to commercial-scale processing, aiming for a combined capacity of 600 tonnes per day. All major processing equipment has arrived and is being installed, with full commissioning expected in early Q4 2026. The facilities will treat both fresh ore and historical tailings, with the capability to co-recover a Platinum Group Metals (PGM) bearing concentrate alongside gold, which will be evaluated for a copper-matte treatment route. Monthly production reporting will resume after plant installation, commissioning, and operational stabilization.

Disclaimer*

UK 100

Latest directors dealings