TVL FEED Study

AI SummaryClose X

Alkemy Capital Investments Plc's subsidiary, Tees Valley Lithium, has completed a Front-End Engineering Design study for its lithium hydroxide refinery, confirming a projected capital expenditure of $243.6 million and annual EBITDA of $65.9 million. The study indicates the project's capital intensity is at the lower end of the global cost curve and significantly below comparable European projects, with an updated annual operating cost estimate of $33.2 million. The refinery is designed to produce 25,000 tonnes per annum of battery-grade lithium hydroxide monohydrate, supporting the growing European electric vehicle and battery supply chain. The company has also purchased the industrial plot for the facility, which will support future expansion phases.

Disclaimer*

UK 100

Latest directors dealings