ACG Metals Limited reported a strong finish to 2025, exceeding production guidance with 39.2 koz AuEq produced and 39.5 koz AuEq sold, while C1 cash costs decreased by 18% to US$499/oz AuEq. All-in Sustaining Costs (AISC) rose to US$1,244/oz AuEq due to higher metal prices. The company provided 2026 guidance of 20-22 ktpa CuEq production with expected AISC of US$2.40-US$2.60/lb CuEq, benefiting from a reduced royalty rate. The Gediktepe Sulphide Expansion Project is on track for commercial production by the end of H1 2026, and an Enriched Ore Treatment Project is targeting an additional c.57kt CuEq over four years. Net debt stood at US$65 million as of December 31, 2025.

Disclaimer*

ACG Metals Limited
19 January 2026
 

19 January 2026

ACG METALS LIMITED

("ACG" or the "Company")

FY and Q4 2025 Operations Update

 

ACG Metals Exceeds Guidance with Sulphide Project on track

ACG Metals Limited is pleased to announce its operations update for the fourth quarter of 2025 ("Q4 2025") and the full 2025 financial year ("FY 2025"). 

Artem Volynets (Chairman and CEO) and Patrick Henze (CFO) will provide a live presentation via Investor Meet Company on 26 Jan 2026, 12:00 GMT. To attend, investors can join via this link: https://www.investormeetcompany.com/acg-metals-limited/register-investor

The Company finished the year with an LTIF of 0.66 including 1.6 M man-hours worked LTI free.

ACG delivered a strong finish to 2025, exceeding production guidance with 39.2 koz AuEq produced (3% over the top end) and 39.5 koz AuEq sold during the Gediktepe mine's first full year under ACG's ownership. Operational efficiency and cost controls drove a 18% reduction in C1 cash costs to US$499/oz AuEq. AISC increased to US$1,244/oz AuEq from US$1,139 year‑on‑year, driven by the increases in gold and silver prices, resulting in higher royalty payments.

The Company is pleased to announce its 2026 production and AISC guidance at 20 - 22 ktpa CuEq production, including the 17.5 koz AuEq of oxide production stacked and presently under leach. AISC are expected to be at approximately US$2.40 - US$2.60/lb CuEq in this transformational year for ACG Metals. The oxide production cost will significantly benefit from the reduced royalty rate with EMX Royalty Corporation (2.25% this year vs 10% last year).

The Gediktepe Sulphide Expansion Project advanced significantly during the year and is on time and on budget for commercial production by the end of H1 2026, transitioning ACG into a copper producer.

The Enriched Ore Treatment Project at Gediktepe mine is targeting an additional c.57kt CuEq from enriched ore and stockpiles on site over a four-year period. In Q4 2025 the Company completed a scoping study and basic engineering.  Permitting, metallurgical test works, and detailed engineering will commence in Q1 2026.

ACG's net debt as of December 31, 2025 was US$65 million.

Artem Volynets, Chairman and CEO of ACG, said:

""We are proud of our consistent outperformance last year, demonstrating the exceptional operating capabilities of our team.

ACG is well positioned to complete the transition to a copper producer this year, with Sulphide Project construction on budget and on time, while continuing to benefit strongly from the production of gold and silver from the residual oxide ore.

We are making great progress on our strategy to establish ACG Metals as a leading growth copper company on the LSE."

FY 2025 Operating Summary

 



2025

vs 2024


Total Ore Mined

t

351,723

-51%

Mining

Au Grade

g/t

2.26

4%

Ag Grade

g/t

75.4

21%





 

Total Ore Processed

t

354,472

-56%

Process

Au Grade

g/t

2.56

1%

Ag Grade

g/t

94.0

31%





 

Au

oz

32,516

-31%

Production

Ag

oz

587,947

-17%

AuEq

oz

39,188

-29%





 

Au

oz

32,884

-33%

Sales

Ag

oz

570,870

-15%

AuEq

oz

39,416

-31%





 

Au

$/oz

3,321

39%

Realised Price

Ag

$/oz

37.69

32%





 

C1 Cash Costs (produced)

$/oz

499

-18%

Cost

AISC (sold)

$/oz

1,244

9%

                                                 

Safety And Sustainability 

Safety culture continued to strengthen in 2025.  The Company finished the year with an LTIF of 0.66.  This included one lost-time incident sustained by a contract employee for a total of 1.6 M man-hours worked.  Efforts remain focused on improving contractor workplace safety as the construction workforce peaks in H1 2026.

Progress continued to position ACG for superior ESG performance. The inaugural annual

Sustainability Report nears completion and will be published with the annual report in April. The Company also anticipates completing a comprehensive compliance review in Q1 2026, including updating existing and introducing certain new compliance policies, consistent with its commitment to ensure the highest standards of corporate governance.

Oxide Operation 

•     FY2025 total ore mined was 351,723 tonnes, down 51% from 2024, reflecting natural sequencing of the mine and production plan 

•     Average grades improved, with gold at 2.26 g/t (+4%) and silver at 75.4 g/t (+21%), supporting higher-value ore delivery.

•     Ore processed totalled 354,472 tonnes, a 56% decrease year-on-year, as oxide stockpiles were drawn down ahead of sulphide expansion.

•     Processing grades strengthened further, with gold at 2.56 g/t (+1%) and silver at 94.0 g/t (+31%).

•     Operational efficiency throughout 2025 delivered a 25% reduction in C1 cash costs, decreasing from US$606/oz AuEq to US$455/oz AuEq.

•     FY2025 AISC remained broadly stable at US$1,133/oz AuEq, down 1% year-on-year, as higher price-linked royalties offset the benefits of lower operating costs during a period of stronger metal prices.

Gediktepe Sulphide Expansion Advancing at Pace

The Gediktepe Sulphide Expansion Project delivered significant progress in Q4 2025, achieving key construction and equipment milestones while remaining firmly aligned with its development schedule.

•     Primary crusher foundations completed, structural steel erected, and major components installed including the jaw crusher, ROM feed bin and feeders.

•     Ball and SAG mill foundations finalised, with structural steel erection for the mill building underway.

•     Flotation and filter building foundations completed, and earthworks for the tailings storage facility progressing on schedule.

•     All flotation tanks, scavenger cells and cleaner cells delivered to site, alongside 1,300 tonnes of structural steel out of the planned 1,700 tonnes.

•     SAG and ball mills completed and ready for factory testing by year-end 2025, with rubber lining and delivery scheduled for January 2026.

As of 31 December 2025, the project remained firmly on schedule with engineering 68% complete, procurement 66%, construction 37%, concrete poured 86%, and 80% of long-lead items delivered. The Gediktepe Sulphide Expansion Project remains on track for commercial production by the end of H1 2026.

Enriched Ore Treatment  

ACG successfully delivered on its commitment to identify a method of unlocking potential value from enriched ore and stockpiles at Gediktepe. The company completed a scoping study and basic engineering in 2025.  Commissioning for Phase 1 gold and silver recovery is planned for Q4 2026.   In 2028, Phase 2 will commence recovering copper and zinc in addition to precious metals. The project is expected to unlock an additional c.57kt CuEq over 4 years.   

Capital Structure Highlights

ACG's net debt as of December 31, 2025 was US$65 million and a cash balance of $144 million (including a restricted balance of $46 million, and $43 million sulphide cash balance).

Post 2025 year-end, the January 2026 coupon in respect of the US$200 million Nordic bonds issued by ACG Holdco 1 Limited has been paid in full, and the group is in full compliance with its bond terms. 

- ENDS -

Inside information

The information contained within this announcement is considered by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No.596/2014 (as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018). On the publication of this announcement via a Regulatory Information Service, such information is now considered to be in the public domain.

Forward looking statements

This announcement may contain certain "forward-looking information" and "forward-looking statements" (collectively, "forward-looking statements").  Forward-looking statements are identified by their use of terms and phrases such as "believe", "targets", "expects", "aim", "anticipate", "project", "would", "could", "envisage", "estimate", "intend", "may", "plan", "will" or the negative of those, variations or comparable expressions, including references to assumptions. The forward-looking statements in this announcement are based on current expectations and are subject to known and unknown risks and uncertainties that could cause actual results, performance and achievements to differ materially from any results, performance or achievements expressed or implied by such forward-looking statements. Factors that may cause actual results to differ materially from those expressed or implied by such forward looking statements. These forward-looking statements are based on numerous assumptions regarding the present and future business strategies of the Group and the environment in which it is and will operate in the future. All subsequent oral or written forward-looking statements attributed to the Company or any persons acting on its behalf are expressly qualified in their entirety by the cautionary statement above. Each forward-looking statement speaks only as of the date of this announcement. Except as required by applicable law, regulatory requirement, the UK Listing Rules and the Disclosure Guidance and Transparency Rules, neither the Company nor any other party intends to update or revise these forward-looking statements, whether as a result of new information, future events or otherwise.

The person responsible for the release of this information on behalf of the Company is Artem Volynets, Chief Executive Officer.

 

For further information please contact:

 

Palatine      

Communications Advisor

Conal Walsh / James Gilheany/ Kelsey Traynor/ Joshua Wolff acg@palatine-media.com

 

Berenberg 

Research Analysts

Richard Hatch +44 (0) 20 3753 3070

 

Joint Broker

Jennifer Lee

+44 (0) 20 3207 7800

 

Canaccord

Research Analysts

Tim Huff +44 (0) 20 7523 8374                       

 

Joint Broker

James Asensio / Charlie Hammond

+ 44 (0) 20 7523 80

 

Stifel

Joint Broker

Ashton Clanfield / Varun Talwar

+44 (0) 20 7710 7600

 

Cantor Fitzgerald

Research Analysts

Puneet Singh +1 (416) 350-8153

 

 

About the Company  

 

ACG Metals is a company with a vision to consolidate the copper industry through a series of roll-up acquisitions, with best-in-class ESG and carbon footprint characteristics. 

 

In September 2024, ACG successfully completed the acquisition of the Gediktepe Mine which is expected to transition to primary copper and zinc production from 2026 and will target annual steady-state copper equivalent production of 20-25 kt. Gediktepe sold 57koz of AuEq in 2024.

 

ACG's team has extensive M&A experience built through decades spent at blue-chip multinationals in the sector. The team brings a significant network as well as a commitment to ESG principles and strong corporate governance. 

 

LON: ACG  |  OTCQX: ACGAF  |  LON:ACGW  |  Xetra: ACG  |  Bond ISIN: NO0013414565

For more information about ACG, please visit: www.acgmetals.com

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UK 100

Latest directors dealings