Falcon Oil & Gas Ltd. - Beetaloo Sub-basin - Completion of the three well batch drilling 2025 campaign

Summary by AI BETAClose X

Falcon Oil & Gas announced the successful completion of its three-well batch drilling campaign in the Beetaloo Sub-basin. The drilling program included the Shenandoah South SS2-1H, SS2-3H, and SS2-5H wells, each featuring a 3,000-metre horizontal section. The average drilling time to target depth was 26.7 days, staying within the 35-day forecast. A 60-stage stimulation is planned for the SS2-5H well in Q4 2025, with a 30-day flow test expected before shut-in. Gas sales are projected to commence in mid-2026, with all wells in the Shenandoah South Pilot Project expected to deliver the contracted 40 MMcf/d volume. Falcon Australia reduced its participating interest in the three wells to 0%, incurring no cost exposure.

Disclaimer*

UK 100

Latest directors dealings