Higher Grade Results confirmed at Spring Hill Gold

RNS Number : 5826M
Thor Mining PLC
19 September 2012
 

THOR MINING PLC

 

LATEST HIGHER GRADE RESULTS CONFIRM GOLD MINERALISATION EXTENSION  AT SPRING HILL GOLD PROJECT

 

Dated: 19 September 2012

 

The Board of Thor Mining Plc ("Thor") (AIM, ASX: THR), is pleased to advise that further improved grades and extensions of known gold mineralisation have been confirmed in remaining assays from drilling into the main Hong Kong Zone Spring Hill Gold Project south of Darwin in Australia's Northern Territory.

Three holes were drilled into the Hong Kong mineralisation to test possible extensions to the zone, as part of Thor's broader 2012 drilling program across multiple targets at Spring Hill.

 

Latest highlights, in addition to those announced on 17 September 2012, include:

 

• SHDD012     46.7m at 2.4 grams per tonne (g/t) gold (Au) from 300.6m

                        Hong Kong lode

                             including: 9.4m at 2.9 g/t Au from 313m

                                    and:4.0m at 7.6 g/t Au from 337m

 

• SHDD010     30.2 m at 2.7 g/t Au from 145.3m

                        Mineralised zone to east of Hong Kong:

                             including: 2.7m at 17.7 g/t Au from 145.3m

                                    and: 5.0m at 4.9 g/t Au from172m

 

Refer to Table 1 for the full report of significant intersections including estimated true widths for assays received to date

The additional results strengthen the indications of depth extension to the gold mineralising system for the Hong Kong lode (figures 2, 3, and 4), and suggest an improvement in the grade to the south.  The SHDD010 results appear to support strike extension of the new lode identified earlier in SHDD008B, which has not been previously modelled.

Figure 2: Diagrammatic cross section looking north at 9575mN(local) showing SHDD012.

Figure 3: Diagrammatic cross section looking north at 9650mN(local) showing SHDD010.

Figure 4: Diagrammatic cross section looking north at 9700mN(local) showing SHDD008B.

http://www.rns-pdf.londonstockexchange.com/rns/5826M_1-2012-9-18.pdf 

 

It is proposed to undertake resource estimation during the next 3 months, once check-assaying has been completed.

Commenting, Mr Mick Billing, Executive Chairman of Thor Mining, said:

 

"We are delighted to be able to report additional results showing higher average grades and extensions to the known mineralisation at Spring Hill.  While we still have some work to finalise the evaluation, these are very encouraging signs."

 

The three holes into the Hong Kong lode have extended known depth of mineralisation by at least 100 metres over a strike length of at least 125 metres.  Gold grade appears to be increasing toward the south.The newly identified extension to the Hong Kong mineralising system is open down plunge and to the south. Drillhole SHDD012 was stopped in mineralisation therefore leaving the Hong Kong partially open to the west. In addition approximately 30 metres to the east of the Hong Kong a new lode has been identified.

 

Next Steps

Follow up work commencing immediately, and through to the next dry season, is likely to involve the following;

·              Finalise check analyses on low grade assays,

·              Resource estimate update and open cut mine optimisation,

·              Plan and execute follow-up resource extension drilling

·              Plan and implement lease wide exploration program.

 

 

Enquiries:

 

Mick Billing

+61 (8) 7324 1935

 

Thor Mining PLC

Executive Chairman

Allan Burchard

+61 (8) 7324 1935

 

Thor Mining PLC

CFO/Company Secretary

Gerry Beaney/ David Hignell

+44 (0) 207 383 5100

 

Grant Thornton Corporate Finance

 

Nominated Adviser

Nick Emerson/

Renato Rufus

+44 (0) 1483 413500

Simple Investments

Broker

Alex Walters/

Emma Wigan

+44 (0) 7771 713608

+44 (0) 207 839 9260

Cadogan PR

Financial PR

 

Competent Person statement -

 

The information in this report that relates to exploration results is based on information compiled by Richard Bradey, who holds a BSc in applied geology and an MSc in natural resource management and who is a Member of The Australasian Institute of Mining and Metallurgy.  Mr Bradey is an employee of Thor Mining PLC.  He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'.  Richard Bradey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. 

 

The information in this report that relates to the Spring Hill Mineral Resource is based on information compiled by Diederik Speijers who is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Speijers is the principal of consulting firm McDonald Speijers.  He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'.  Diederik Speijers consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

 

Updates on the Company's activities are regularly posted on Thor's website www.thormining.com, which includes a facility to register to receive these updates by email.

 

Table 1: Significant Intersection Summary Report

Hole id

North Local/

GDA

East

Local/

GDA

RL Local/

GDA

Azimuth

 

Dip

Hole Depth

(m)

From

(m)

Interval

(m)

True Width

Au g/t

SHDD008

9700/ 8494010

9871/

794216

1234/

247

245

-65

89

30.0

1.0


0.20

                            

45.0

1.0


0.26


71.0

1.0


0.28

Hole stopped at 89m due to excess hole path deviation
















SHDD008A

9700/ 8494010

9873/ 794218

1234/

247

245

-75

101

2.0

1.0


0.26






45.0

1.0


5.35








52.0

1.0


0.24







65.0

11.0

7.5

5.07






including

66.0

5.0

4

10.22







77.0

1.0


0.23







90.0

1.0


0.42

Hole stopped at 101m due to poor ground conditions
















SHDD008B

9698/

8494009

9873/

794219

1234/

247

245

-70

387.1

39.0

1.0


0.20






45.0

1.0


0.22







54.0

1.0


0.55







61.0

1.0


1.27








68.0

2.0

1.5

0.40








126.0

1.0


0.36








129.0

1.0


0.39








165.0

2.0


1.57







including

165.0

1.0


2.46








169.0

1.0


0.33








178.0

2.0


0.73








189.5

8.4

4.3

1.47







including

189.5

0.5


5.45







and

193.0

0.25


22.73








202.0

1.0


0.48








204.3

1.7


1.4







including

204.3

0.1


20.8








217.8

3.0

1.6

4.7







including

219

0.6


22.1








226.0

2.8

1.5

1.03







including

227.6

0.4


4.20








245.2

1.0


0.25








268.8

1.0


0.2








301.4

8.7

4.4

0.36








315.2

0.6


2.83








326.2

39.7

19.9

0.49







including

351.0

1.0


2.51








372.2

9.8

4.4

0.3








386.0

1.1


0.57












SHDD009

10025/

8494416

10124/

794286

1240/

253

245

-75

920.7

0.0

1.0


0.60






72.0

1.0


0.20








78.0

1.0


0.20







85.0

1.0


0.26







89.0

1.0


0.63







104.0

1.0


0.37







120.0

1.0


0.35







124.0

2.0

1.5

0.58







128.0

1.0


0.21







130.0

1.0


0.32







133.0

5.0

3.5

0.72






including

133.0

1.0

1

2.32







167.0

3.3


0.3







177.0

1.1


2.6






including

177.0

0.7


3.76







192.4

3.7


1.39






including

192.4

0.8


3.04







203.7

0.7


1.19







207.2

2.2

1.8

0.79







214.3

0.8


0.4







217.8

3.3

3

1.0






including

218.1

0.4


2.41







222.4

1.0


0.36







231.5

2.5

2

2.16






including

233.0

1.0

1

3.78











SHDD010

9650/

8493973

9886/

794253

1240/

253

245

-70

422.9

41.0

1.0


0.82






52.0

1.0


0.26








61.0

2.0

1.5

0.39








71.2

2.0

1.5

0.72








116.8

3.6

1.53

0.8








122.4

9.6

4.54

0.82








136.4

2

1

0.9








145.3

2.7

1.5

17.7







Including

145.3

0.6


71.4








150.6

3.0

1.5

0.4








166.6

1.2

1

4.7








172

5

2.5

4.9







Including

172.7

1.7

1

8.6








185

5.2

    2.5

0.3








200.6

1.4

1

2.6








207

9.3

4.5

0.4








220.4

1.9

1

0.5








235

6.8

3.5

2.0








254

3

1.5

0.4








262.3

2.0

1

0.27








265.9

1.1


0.5








282.6

2.6

1.3

0.7








300.5

1.6

1

0.9








334.1

2.0


0.71








362.9

1.1


0.29








366.0

5.9

3

1.4








379.5

1.2


0.5








385.0

6.5

3

2.5







including

387.0

1.0


12.73








397

20.0

10

1.1







including

410

3.0

1.5

4.1











SHDD011

9758/

8493996

9732/

794066

1209/

232

245

-80

111

1.0

59.0

24

1.36







including

3.0

1.0


3.05







and

7.0

1.0


2.99







and

23.0

1.0


2.37






and

37.0

2.0

1.5

2.29







and

45.0

1.0


2.44







and

51.0

1.0


12.37







and

53.0

1.0


3.11







and

59.0

1.0


2.16








68.0

2.0

1.5

0.27








71.0

26.0

16

0.69








99.0

1.0


0.22








101.0

9.0

6

0.37

Infill RC hole stopped at 111m - no diamond tail drilled





SHDD012

9575/

8493843

9751/

794170

1175/

188

245

-80

347.3

0.0

2.0


0.23






7.0

1.0


0.20








14.0

3.0

2.5

0.36







25.0

1.0


0.24








47.0

1.0


0.31








57.0

1.0


0.26








59.0

5.0

2.5

0.63








66.0

1.0


0.23








72.0

3.0

2

0.33








  86.0

2


0.29








133

2


0.34








139

4

2

0.68








160

12

6

0.7








270.4

2.2


0.5








300.6

46.7

20

2.4





Including



313

9.4

4

2.9







and

337

4.0

2

7.6

 

Intersection selection criteria:

·      Intersections are calculated using 0.2 g/t gold cutoff with a minimum interval of 1 metre and maximum of 3 metres internal dilution

·      High grade intersections (shown in bold) are calculated using 2 g/t gold cutoff with a maximum of 3 metres internal dilution

·      'Interval' refers to the down-hole length of intersection

·      'True width' is estimated from the outline of mineralisation interpreted on the relevant cross section

 

 



 


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCVVLFFLKFXBBE

Companies

Thor Energy (THR)
UK 100

Latest directors dealings