Scoping Study

Tertiary Minerals PLC 27 November 2002 www.tertiaryminerals.com 27 November 2002 TERTIARY INITIATES SCOPING STUDY FOR GHURAYYAH TANTALUM-NIOBIUM PROJECT • Scoping Study Awarded To St Barbara Consultancy Services • Team Includes SRK Consulting And GBM Minerals Engineering Consulting • Study Based On Recently Completed Metallurgical Development Programme And 385 Million Tonne Inferred Mineral Resource • Includes Production Of Concentrate And Added-Value Products _______________________________________________________________________ Tertiary Minerals plc is pleased to announce that it has commissioned London based St Barbara Consulting to carry out an economic and technical scoping study for development of its Ghurayyah tantalum-niobium deposit in Saudi Arabia. The study will be based on the recently announced results of Tertiary's metallurgical development programme where a valuable concentrate of tantalum niobium and yttrium was produced using industry standard process technology. It will commence immediately and take approximately 12 weeks to complete. The broad objectives of the study are to: • carry out mine and process design, capital and operating cost estimates for a mining, concentration and concentrate processing operations based on the bulk-mineable Ghurayyah tantalum-niobium resource, • evaluate production of both tantalum and niobium in both concentrate and added-value form and assess the value of by-product yttrium, zircon and rare-earth oxides, • to consider water supply requirements and any environment issues relating to the project, • define a scope of work and budget for a preliminary feasibility study, and • carry out comprehensive financial modelling of the project. The study will be managed by St Barbara's senior mineral processing consultant Richard Wilkinson, a metallurgist/chemical engineer, who was formerly in charge of mineral processing research at Billiton Research. Mr Wilkinson has recently been advising the Company on its metallurgical development programme. St Barbara will carry out the process design for ore concentration and concentrate processing options. SRK Consulting will design and cost the mining operations whilst GBM Minerals Engineering Consultants will cost the processing plant and infrastructure. Project planning will be based on the Inferred Minerals Resource previously estimated by SRK Consulting at 385 million tonnes grading 245 g/t tantalum pentoxide (Ta205), 2,840 g/t niobium pentoxide (Nb205), and 8,915 g/t zirconium oxide (Zr02). Further information: Patrick Cheetham, Executive Chairman, Tertiary Minerals plc. Tel: 01625-626203 Ron Marshman, City of London PR Ltd. Tel: 020-7628-5518 This information is provided by RNS The company news service from the London Stock Exchange
UK 100

Latest directors dealings