Definition Infill Drilling Results at Luika Pro...

14 June 2011 Shanta Gold Limited ("Shanta Gold" or "Shanta" or the "Company") Definition Infill Drilling Results at the Luika Prospect Shanta Gold is pleased to announce results achieved during a recent infill drilling programme commissioned at its Luika Prospect in central Tanzania. The Luika Prospect is located approximately 450m west-northwest of the Bauhinia Creek Prospect, where pre-stripping activities are already in progress. The Luika Prospect is scheduled to be the second open pit to be exploited at Shanta's New Luika Gold Mine ("NLGM"). The drill programme was focussed on attaining a 25m pierce point spacing to a vertical depth of 50m along approximately 680m of mineralised strike extent which is intended to be exploited in the open pit. (Exploration drilling from 2006 to date, defined the orebody to a vertical depth of approximately 150m. The orebody is open at depth). Two deeper holes were also drilled in certain areas to obtain improved ore zone delineation (CSR277 & CSR279). Both holes successfully intersected the ore body at their designed depth. The Luika Prospect was the focus of pre-1956 colonial mining activities. Archive longitudinal mine sections obtained by company geologists indicate that several areas had been targeted by conventional underground stoping methods. During the compilation of 3D block models, stoped areas were completely excluded from the 3D block models. Shanta exploration crews implemented the infill drilling programme on a grid-basis, and did not attempt to avoid the intersection of previously stoped-out excavations. The infill drilling programme commissioned at Luika has resulted in improved delineation of underground excavations. Definition infill drilling results also illustrate that: * Shanta's existing 3D block model of the Luika Prospect is representative in terms of both geometry and gold grade distribution. * The mineralised envelope at Luika is laterally continuous. * Colonial underground mining activities were restricted to the north-eastern portions of the orebody. * Colonial underground mining was conducted on a selective basis - stoped areas commonly still contain gold mineralisation in the hanging wall or footwall (or both hanging wall and footwall) of historic excavations, resulting in the fact that even historically mined stopes in many instances still constitute legitimate open pit mining targets. * No significant historical mining occurred with the central and southwestern portions of the Luika orebody (this area is characterised by higher gold grades and increased mineralised widths) Significant composite intersections achieved in definition infill drillholes are listed in Table 1. Table 1; COMPOSITE_GRADE BHID FROM TO INTERSECTION_WIDTH   COMMENTS +------+----+---+------------------+---------------+---------------------------+ |CSR243| 16 |22 | 6 | 6.98 |Including 1m@23.6g/t | +------+----+---+------------------+---------------+---------------------------+ |And |   |   |   |   |  | +------+----+---+------------------+---------------+---------------------------+ |CSR243| 24 |30 | 6 | 1.66 |  | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ | | | | | |No economic mineralisation | |CSR244| | | | |intersected. Step-back hole| | | | | | |of CSR243 - NE boundary | | |   |   |   |   |zone of mineralisation | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR245| 13 |15 | 2 | 1.19 |  | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR246| 14 |18 | 4 | 1.69 |  | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR247| 38 |42 | 4 | 2.50 |  | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR248| 49 |52 | 3 | 1.46 |  | +------+----+---+------------------+---------------+---------------------------+ |And |   |   |   |   |  | +------+----+---+------------------+---------------+---------------------------+ |CSR248| 55 |56 | 1 | 2.69 |Excavation - 52m-55m | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR249| 55 |57 | 2 | 4.50 |Excavation - 50m-55m | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR250| 28 |34 | 6 | 2.49 |  | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR251| 29 |32 | 3 | 2.16 |Excavation - 32m-35m | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR252| 58 |60 | 2 | 0.91 |Excavation - 50m-58m | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR253| 49 |50 | 1 | 2.15 |Excavation - 55m-60m | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR254| 52 |56 | 4 | 1.32 |Excavation - 56m-60m | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR255| 52 |53 | 1 | 1.28 |Excavation from 55m | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR256| 64 |65 | 1 | 1.24 |  | +------+----+---+------------------+---------------+---------------------------+ |And |   |   |   |   |  | +------+----+---+------------------+---------------+---------------------------+ |CSR256| 67 |69 | 2 | 6.48 |  | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR257| 31 |37 | 6 | 4.21 |Including 1m@12.35g/t | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR258| 30 |34 | 4 | 5.44 |  | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR259| 34 |35 | 1 | 0.47 |  | +------+----+---+------------------+---------------+---------------------------+ |And |   |   |   |   |  | +------+----+---+------------------+---------------+---------------------------+ |CSR259| 39 |40 | 1 | 0.41 |Excavation 35m-39m | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ | | | | | |Excavation 27m-30m. No | | | | | | |economic mineralisation | |CSR260|   |   |   |   |intersected | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR261| 31 |33 | 2 | 4.77 |  | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR262| 29 |39 | 10 | 1.66 |  | +------+----+---+------------------+---------------+---------------------------+ |And |   |   |   |   |  | +------+----+---+------------------+---------------+---------------------------+ |CSR262| 41 |43 | 2 | 1.42 |Excavation 39m-41m | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR263| 59 |61 | 2 | 2.28 |  | +------+----+---+------------------+---------------+---------------------------+ |And |   |   |   |   |  | +------+----+---+------------------+---------------+---------------------------+ |CSR263| 63 |66 | 3 | 2.75 |  | +------+----+---+------------------+---------------+---------------------------+ |And |   |   |   |   |  | +------+----+---+------------------+---------------+---------------------------+ |CSR263| 67 |68 | 1 | 1.27 |Excavation 66m-67m | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ | | | | | |Including 1m@37.45g/t and | |CSR264| 28 |38 | 10 | 9.32 |1m@38.4g/t | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ | | | | | |Including 1m@11.55g/t and | |CSR265| 30 |39 | 9 | 4.44 |1m@21.8g/t | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR266| 29 |35 | 6 | 3.63 |Including 1m@12.75g/t | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR267| 56 |71 | 15 | 2.12 |  | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR268| 18 |21 | 3 | 1.86 |  | +------+----+---+------------------+---------------+---------------------------+ |And |   |   |   |   |  | +------+----+---+------------------+---------------+---------------------------+ |CSR268| 29 |38 | 9 | 3.06 |  | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR269| 27 |39 | 12 | 4.97 |Including 1m@18.2g/t | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR270| 30 |33 | 3 | 4.03 |  | +------+----+---+------------------+---------------+---------------------------+ |And |   |   |   |   |  | +------+----+---+------------------+---------------+---------------------------+ |CSR270| 56 |76 | 20 | 2.68 |  | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR271| 6 | 7 | 1 | 2.08 |  | +------+----+---+------------------+---------------+---------------------------+ |And |   |   |   |   |  | +------+----+---+------------------+---------------+---------------------------+ |CSR271| 9 |11 | 2 | 1.73 |  | +------+----+---+------------------+---------------+---------------------------+ |And |   |   |   |   |  | +------+----+---+------------------+---------------+---------------------------+ |CSR271| 22 |26 | 4 | 3.57 |  | +------+----+---+------------------+---------------+---------------------------+ |And |   |   |   |   |  | +------+----+---+------------------+---------------+---------------------------+ |CSR271| 28 |30 | 2 | 1.79 |  | +------+----+---+------------------+---------------+---------------------------+ |And |   |   |   |   |  | +------+----+---+------------------+---------------+---------------------------+ |CSR271| 40 |42 | 2 | 1.20 |  | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR272| 56 |69 | 13 | 8.84 |Including 1m@31.55g/t | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR273| 17 |23 | 6 | 3.47 |Including 1m@10.7g/t | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR274| 10 |23 | 13 | 6.16 |Including 1m@21.15g/t | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR275| 22 |31 | 9 | 5.46 |Including 1m@14.4g/t | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR276| 51 |57 | 6 | 3.79 |  | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR277| 86 |91 | 5 | 2.33 |  | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR278| 55 |56 | 1 | 1.26 |  | +------+----+---+------------------+---------------+---------------------------+ |And |   |   |   |   |  | +------+----+---+------------------+---------------+---------------------------+ |CSR278| 58 |59 | 1 | 1.06 |  | +------+----+---+------------------+---------------+---------------------------+ |And |   |   |   |   |  | +------+----+---+------------------+---------------+---------------------------+ |CSR278| 60 |62 | 2 | 1.09 |  | +------+----+---+------------------+---------------+---------------------------+ +------+----+---+------------------+---------------+---------------------------+ |CSR279| 91 |96 | 5 | 3.53 |  | +------+----+---+------------------+---------------+---------------------------+ |And |   |   |   |   |  | +------+----+---+------------------+---------------+---------------------------+ |CSR279| 98 |102| 4 | 5.25 |Including 1m@11.2g/t | +------+----+---+------------------+---------------+---------------------------+ * The company is currently integrating definition infill drilling information into the existing Luika 3D block model with the view to achieving a conversion of resources to reserves. * Definition infill drilling of the Jamhuri Mineralised Prospect and the Black Tree Hill Mineralised Prospect, which are also scheduled for open pit exploitation, is at an advanced stage. Walton  Imrie, Executive Chairman commented: "The Luika orebody is scheduled to be the second orebody to be exploited by means of open pit mining at the NLGM. These results, as was the case with Bauhinia Creek infill drilling, vindicate the company's decision to fast-track the mining of the NLGM resource. The company is excited by the confirmation of robust, previously unexploited gold mineralisation on the south western extension of the Luika orebody. This extension was delineated during Phase 3 exploration drilling, and the close-spaced infill drilling has just re-affirmed the robust nature of gold mineralisation at Luika." For further information: Shanta Gold Limited http://www.shantagold.com Walton Imrie Mobile: +27 (0) 82 444 2851 Walter Vorwerk Mobile: +27 (0) 83 308 0080 Gareth Taylor Mobile: +255(0)757732484 Fairfax I.S. PLC Ewan Leggat/Laura Littley +44 (0) 20 7598 5368 Qualified Person: Braam (J.A.C.) Jankowitz, M.Sc., Pr.Nat.Sci. (400127/93), Shanta's Technical Services Manager is a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies, June 2009, of the London Stock Exchange, and has reviewed and approved the technical information contained in this announcement. Glossary: Hanging Wall & Footwall: The two sides of a non-vertical fault feature/tabular orebody/stope. The hanging wall is the volume of rock above the non-vertical geological feature or mining excavation. The footwall is the volume of rock below the non-vertical geological feature or mining excavation. This announcement is distributed by Thomson Reuters on behalf of Thomson Reuters clients. The owner of this announcement warrants that: (i) the releases contained herein are protected by copyright and other applicable laws; and (ii) they are solely responsible for the content, accuracy and originality of the information contained therein. Source: Shanta Gold Limited via Thomson Reuters ONE [HUG#1523104]
UK 100

Latest directors dealings