Update on CCGT project at Ene

RNS Number : 9027P
Rurelec PLC
01 April 2009
 

Rurelec PLC

('Rurelec' or 'the Company')

Update on CCGT project at Energia del Sur in Comodoro Rivadavia


Since the announcement of 2 March 2009, high demand for power from the local grid resulted in CAMMESA, the regulator, not allowing both gas turbines at the Energia del Sur plant to be off- line simultaneously which has resulted in a short delay in the completion of the project. One of the gas turbines is now connected to into the CCGT system and is producing an additional output of 10MW. The output has been computer checked and is performing to original design. Direct gas firing of the heat recovery steam generators ('HRSG') and steam turbine auxiliaries are currently being brought into service which will further increase the nominal capacity and this work is projected to be completed next week. Shortly there after the second gas turbine will be connected to its HRSG, a simple process of removing a spade plate, whereupon the system will be complete with the additional 60MW of nominal capacity.


For further information, please contact:

Peter Earl
Managing Director                          Tel. 020 7793 5610

Paul Shackleton / Stewart Dick
Daniel Stewart & Company             Tel. 020 7776 6550 



This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCCKDKNCBKKQQK

Companies

Rurelec (RUR)
UK 100

Latest directors dealings